top of page

Search Results

363 items found for ""

  • San Jose Civic Center Garage

    San Jose Civic Center Garage San Jose, CA Project consisting of one-level of below-grade parking, accommodating 650 vehicles. This parking garage services the San Jose Civic Center which houses the local San Jose government officials as well as general downtown San Jose parking. Services Provided: Architect of Record: Client: News: Construction Richard Meier and Partners City of San Jose None Completed 2005 Parking Structure ​ ​ BACK TO PROJECTS

  • 1125 Merrill

    1125 Merrill Menlo Park, CA This 14,200 SF project features a 4-story mixed-use building, slab on grade with two stories of structural concrete and two stories of structural steel and metal decking. The first floor consists of on grade parking with car stackers, a high-end lobby and a conference room. The second floor offers office space with two large north and south facing terraces. Finally, the third and fourth floor consists of two custom high-end residential units with north and south facing terraces as well. The tenant for the first and second floors is Coldwell Banker. Services Provided: Architect of Record: Client: News: Construction Field Architecture Inc. Merrill Street Investors LLC, Prince Street Partners LLC None Completed 2020 Corporate Residential ​ BACK TO PROJECTS

  • Devcon Corporate Office

    Devcon Corporate Office Milpitas, CA Devcon's commitment to Green Building Design and Construction extends into all facets of corporate life at Devcon. The building is a 50,000 SF, one story, concrete tilt building in which we performed full building tenant improvement that includes "open office" architecture throughout. The project also features amenities such as a workout room, locker room, showers, and full exterior landscaping with outdoor patios. Devcon's goal is to show our clients that "Green" Construction and "Lean" Construction practices can be combined in one company to construct a better project at little or no premium. This project is a LEED Gold Award winner. • 175kw PV system • Minimum output – 280,000 KWH/yr • JA Solar 355w modules and SolarEdge inverters with DC optimizers • Calculated payback 3 years assisted by federal tax credit • 30-year IRR – 58% return • 30-year NPV - $1.4 Million • Cumulative savings 30-years - $2.7 Million Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Devcon Construction, Inc. None Completed 2018 Corporate Design-Build LEED Gold BACK TO PROJECTS

  • 1700 Dell

    1700 Dell Campbell, CA Project consisting of 170,000 SF, 4-story Class A commercial office building. The project also features a 160,000 SF 5-story above grade with 1-story below grade parking structure to house 503 vehicles. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Dollinger Dell Associates None In Progress Corporate Design-Build ​ BACK TO PROJECTS

  • San Francisco 49ers Training Facility

    San Francisco 49ers Training Facility Santa Clara, CA Two-story 50,000 SF main building (training facility and administration offices) with separate maintenance/ racquetball building, and related sitework including three practice fields. Services Provided: Architect of Record: Client: News: Construction H.O.K. Sports Division SF 49ers None Completed 1987 Athletic Center ​ ​ BACK TO PROJECTS

  • Excite@Home

    Excite@Home Redwood City, CA Campus project consisting of two 2-story and two 3-story poured in place concrete structures totaling 370,000 SF over parking structures. Project features complete tenant improvements with office space and cafeterias. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture Excite@Home Network None Completed 2001 Corporate ​ ​ BACK TO PROJECTS

  • Cupertino Tech Campus

    Cupertino Tech Campus Cupertino, CA This 317,000 SF project consists of a 77,000 SF state of the art 2-story above ground building, and a 4-level parking garage with 3-levels below grade; the parking garage provides 600 vehicle spaces. The building is a concrete structure with perimeter full height glass, raised access flooring, lobby with feature stair case and stone walls, and a 200 seat theater in addition to the tenant improvements. Tenant improvements consists of high end finishes and rooms such as briefing centers, pods, labs, Alpi Veneer paneling, custom wood ceilings, custom fabric ceilings and custom 12’ high acoustical storefront system. Services Provided: Architect of Record: Client: News: Construction Foster and Partners, HNA Pacific and The Hayes Group Confidential None Completed 2020 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • Kirkland & Ellis

    Kirkland & Ellis Palo Alto, CA This 30,000 SF complete interior renovation of a law firm features custom wood doors and frames; new two story lobby; conferencing center with complete AV systems and ability to open to the lobby via large sliding wood and glass doors. Interior finishes include stone walls and wood floors. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture Kirkland & Ellis LLP None Completed 2012 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • McAfee Fieldhouse

    McAfee Fieldhouse Mount Hermon, CA Project featuring a gymnasium, meeting room, exercise room and game room facility at Mount Hermon Christian Conference Center. The new gymnasium in the fieldhouse can seat up to 750 guests and can adjust to accommodate basketball, volleyball, and an indoor climbing wall. Project also consists of recreational field improvements and landscaping including the addition of a jogging trail and various site improvements related to the nearby stream and pond. Services Provided: Architect of Record: Client: News: Construction 42/40 Architecture Mount Hermon Associates, Inc. None Completed 2005 Athletic Center Education ​ BACK TO PROJECTS

  • Bellarmine Humanities

    Bellarmine Humanities San Jose, CA This 52,700 SF project consists of a 3-story steel frame and concrete structure with below grade band room, storage room, classrooms and ceramic studio. Project also features a theatre with orchestra pits to seat 433 people. Services Provided: Architect of Record: Client: News: Construction Steinberg Hart Bellarmine College Preparatory None https://www.archdaily.com/211892/bellarmine-college-preparatory-steinberg-architects Completed 2010 Education LEED Gold ​ BACK TO PROJECTS

  • Campo di Bocce Fremont

    Campo di Bocce Fremont Fremont, CA This project consists of a 43,564 SF interior remodel of an existing sports complex consisting of new interior bocce courts, full remodel of an interior pavilion structure, new meeting room, as well as a reception desk. Project features suspended light trellises, trophy case, banquette seating and a full kitchen and equipment remodel. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Campo di Bocce None Completed 2016 Athletic Center Retail ​ BACK TO PROJECTS

  • Accel Partners

    Accel Partners Palo Alto, CA This 23,000 SF tenant improvement project within a 3-story building consists of high-end finishes, extensive recessed AV with mostly all specialty ceilings. Project also features roof finishes and usage. Services Provided: Architect of Record: Client: News: Construction TMDA Accel Partners None Completed 2020 Corporate Tenant Improvement ​ BACK TO PROJECTS

bottom of page