  • 1450 Page Mill

    1450 Page Mill Palo Alto, CA This 78,000 SF research and development building consists of a 2-story building and a 1-story below grade parking garage of approximately 42,000 SF. The building consists of structural steel, metal decking, a combination of terra cotta, glass/glazing, and zinc metal wall panels. The project also features three walkable balcony areas at level two. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture Stanford Real Estate None Completed 2017 Corporate Stanford Research Park LEED Gold BACK TO PROJECTS

  • The Plaza Foster City

    The Plaza Foster City Foster City, CA This 555,000 SF design/build mixed-use high-density residential project serves as a major landmark and gateway to the Peninsula. The development features an urban classic contemporary design of 307 units and approximately 17,000 SF of retail space. The project consists of three main structures; two wood framed residential buildings (one four stories and one five stories) containing 300 rental apartments and seven live work units and a six tiered concrete long span parking structure housing 730 vehicles. All three buildings have concrete drilled piers foundations and the amenities include three courtyards with a pool and jacuzzi, exterior BBQ area and fireplace, resident media center, fitness center, community center and leasing center. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Northwestern Mutual Real Estate Investments, LLC None Completed 2013 Residential Design-Build LEED Gold BACK TO PROJECTS

  • 601 Marshall

    601 Marshall Redwood City, CA This 250,000 SF project consists of an 8-story above grade building and a 2-story below grade parking garage to accommodate 255 vehicles. Project features 120,000 SF of office space with ground floor commercial/retail space. Services Provided: Architect of Record: Client: News: Construction KSHA Dostart Development Company None Completed 2018 Corporate Retail LEED Platinum BACK TO PROJECTS

  • Cityline Block 3

    Cityline Block 3 Sunnyvale, CA Project consisting of core & shell of two 300,000 SF 7-story high-rise steel structures on podium above a 2-story below grade garage on approximately 175,000 SF of site. The project includes office, retail, and lobby space, and also features construction of two new streets, outdoor plazas and elaborate sitework featuring precast planters, unit pavers and stainless steel trellis above an ipe wood deck. The building exterior skin consists of precast and a unitized glass curtain wall System with integral terracotta. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Hunter Properties None In Progress Retail ​ ​ BACK TO PROJECTS

  • San Jose Civic Center Garage

    San Jose Civic Center Garage San Jose, CA Project consisting of one-level of below-grade parking, accommodating 650 vehicles. This parking garage services the San Jose Civic Center which houses the local San Jose government officials as well as general downtown San Jose parking. Services Provided: Architect of Record: Client: News: Construction Richard Meier and Partners City of San Jose None Completed 2005 Parking Structure ​ ​ BACK TO PROJECTS

  • 1125 Merrill

    1125 Merrill Menlo Park, CA This 14,200 SF project features a 4-story mixed-use building, slab on grade with two stories of structural concrete and two stories of structural steel and metal decking. The first floor consists of on grade parking with car stackers, a high-end lobby and a conference room. The second floor offers office space with two large north and south facing terraces. Finally, the third and fourth floor consists of two custom high-end residential units with north and south facing terraces as well. The tenant for the first and second floors is Coldwell Banker. Services Provided: Architect of Record: Client: News: Construction Field Architecture Inc. Merrill Street Investors LLC, Prince Street Partners LLC None Completed 2020 Corporate Residential ​ BACK TO PROJECTS

  • Devcon Corporate Office

    Devcon Corporate Office Milpitas, CA Devcon's commitment to Green Building Design and Construction extends into all facets of corporate life at Devcon. The building is a 50,000 SF, one story, concrete tilt building in which we performed full building tenant improvement that includes "open office" architecture throughout. The project also features amenities such as a workout room, locker room, showers, and full exterior landscaping with outdoor patios. Devcon's goal is to show our clients that "Green" Construction and "Lean" Construction practices can be combined in one company to construct a better project at little or no premium. This project is a LEED Gold Award winner. • 175kw PV system • Minimum output – 280,000 KWH/yr • JA Solar 355w modules and SolarEdge inverters with DC optimizers • Calculated payback 3 years assisted by federal tax credit • 30-year IRR – 58% return • 30-year NPV - $1.4 Million • Cumulative savings 30-years - $2.7 Million Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Devcon Construction, Inc. None Completed 2018 Corporate Design-Build LEED Gold BACK TO PROJECTS

  • Adobe Headquarters Garage

    Adobe Headquarters Garage San Jose, CA Phase I: Six levels of parking; two levels below grade and four levels above grade. Phase II: Seven levels of parking; two levels below grade and five levels above grade. Phase II, Tower II: Six above grade parking levels and two basement-parking levels. Services Provided: Architect of Record: Client: News: Construction H.O.K. Adobe Systems, Inc. None Completed 2003 Parking Structure ​ ​ BACK TO PROJECTS

  • Cisco MTV-5

    Cisco MTV-5 Mountain View, CA This project consists of a 15,000 SF building housing fully operational Web-Ex data center. Project includes CD room, entrance facility, data center and build room, additional CRAC’s, PDU’s, and complete replacement of existing building automation system. Project completed in twelve 60 hour weeks through Thanksgiving, Christmas & New Year’s holidays. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Cisco Systems, Inc. None Completed 2008 Data Center Corporate Design-Build BACK TO PROJECTS

  • El Camino Family Housing

    El Camino Family Housing South San Francisco, CA This 225,000 SF multifamily rental development consists of 109 housing units, with a parking garage and surface parking to house 211 cars. Project also features commercial and community space, onsite office space for staff, and common areas including a laundry room and central landscaped area with play structure. The development consists of (1) five-story wood frame building, (1) four-story wood framed building and (6) attached townhouses all sitting upon a two acre concrete podium. Project is Green Point Rated featuring rooftop photovoltaic solar, solar water heating, and community garden within walkable distance to BART. Services Provided: Architect of Record: Client: News: Construction BAR Architects MidPen Housing Corporation None Completed 2012 Residential Green Point Rated ​ BACK TO PROJECTS

  • Broadcom Garage

    Broadcom Garage San Jose, CA The project consists of 249,000 SF four-level concrete parking structure providing 812 vehicle spaces. The structure is constructed of pre-cast concrete columns and beams with cast in place post-tensioned floor decks and poured-in-place perimeter moment beam lateral elements supported on a pier foundation. Structure includes two stair wells and a masonry elevator tower. The exterior consists of an array of vertical perforated aluminum plate and stainless steel mesh panels. Services Provided: Architect of Record: Client: News: Construction HNA/Pacific CMK LLC C/O Broadcom Limited None Completed 2018 Parking Structure ​ ​ BACK TO PROJECTS

  • Franklin Templeton 930 & 950

    Franklin Templeton 930 & 950 San Mateo, CA Project consists of two 121,000 SF, 4-story office buildings over one level of below grade parking and related site improvements. The site improvements consist of surface parking for employees and visitors, as well as outdoor employee amenities including additional outdoor seating areas in close proximity to the existing cafeteria, a centrally located recreation space, and exterior employee gathering places. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Franklin Templeton Companies None Completed 2019 Corporate Tenant Improvement Design-Build BACK TO PROJECTS