top of page

Tech CU Arena

leed Logo.png
San Jose, CA

Design/Build construction of a 2-rink addition to the existing Solar4America Ice complex. The 20,000 SF addition includes a 4,200 seat AHL stadium rink with adjoining practice rink & commissary building complete with locker rooms, commissary kitchen & concessions, large scale restroom facilities, and a professional locker room. The new stadium rink includes a suite level with (12) private suites, (8) loge suites and a theater box suite for larger groups, while the new practice rink building consists of (12) new public locker rooms and a 2nd floor bar overlooking the ice rink. The new 3-story commissary building features an AHL locker room and team office spaces, commissary kitchen, and ice chiller plant room which supports both new rinks as well as a renovated third existing rink. 20,000 SF of space is designated to future tenants which occupies a portion of the 2nd floor and all of the 3rd floor in the commissary building. Hybrid, pre-engineered metal buildings are utilized for the structures of the new buildings with a standing seam panel roof system and insulated metal panel exteriors. The HVAC system includes dehumidification for the ice rinks and a fully integrated controls system. Project also consists of new infrastructure, site work and storm water treatment. The project will receive a LEED Silver rating.

Services Provided:

Architect of Record:

Client:

News:

Design, Construction

Devcon Construction, Inc.

Sharks Ice, LLC

None

Completed 2022

Athletic Center

Design-Build

LEED Silver

bottom of page