Santa Clara, CA

23,000 SF data center with raised computer flooring. Project will include the installation of a 12 KV primary gear and (2) 2000 KVA transformers, (2) 1250 KW generators and transfer switches, (12) 125 KVA PDU’s, 480 volt switchgear and distribution panels and (2) 750 KVA UPS systems with static switches including 15 minute batteries. In addition, the project will also include main and distribution feeders, raceways and outlets for data floor, as well as HVAC units and fire protection.