Search Results
383 results found with an empty search
- Perenn Bakery
Project includes a 3677 SF tenant improvement for a local French Bakery. Custom millwork is installed through out with two viewing areas to watch employees making pastries/bread. The bakery includes a coffee bar and outdoor patio seating. Exposed concrete floors with wood base, brass fixtures and custom pastry display cases. Perenn Bakery Reno, NV Project includes a 3677 SF tenant improvement for a local French Bakery. Custom millwork is installed through out with two viewing areas to watch employees making pastries/bread. The bakery includes a coffee bar and outdoor patio seating. Exposed concrete floors with wood base, brass fixtures and custom pastry display cases. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Tolles Development Company None Completed 2021 Tenant Improvement Retail Design-Build BACK TO PROJECTS
- 331 Fairchild
This project consists of redevelopment of a federal superfund site including construction of a new three story, 87,040 SF Class A commercial office building with a combination of steel frame and concrete tilt-up construction and associated site improvements on the 183,390 SF site. The site has an active 3,150 SF extraction and monitoring station that must be kept in operation and protected during the construction. All concrete and AC demolition material from the previous buildings to be used on site as aggregate base. 331 Fairchild Mountain View, CA This project consists of redevelopment of a federal superfund site including construction of a new three story, 87,040 SF Class A commercial office building with a combination of steel frame and concrete tilt-up construction and associated site improvements on the 183,390 SF site. The site has an active 3,150 SF extraction and monitoring station that must be kept in operation and protected during the construction. All concrete and AC demolition material from the previous buildings to be used on site as aggregate base. Services Provided: Architect of Record: Client: News: Construction AECOM Kilroy Realty Corp. None Completed 2013 Corporate LEED Silver BACK TO PROJECTS
- Lawson Lane West Garage
Project consisting of an expansion of the existing 8-level design/build precast-hybrid parking garage with two levels below grade and six levels above grade totaling 124,664 SF. Project also features related site work. Lawson Lane West Garage Santa Clara, CA Project consisting of an expansion of the existing 8-level design/build precast-hybrid parking garage with two levels below grade and six levels above grade totaling 124,664 SF. Project also features related site work. Services Provided: Architect of Record: Client: News: Construction Not available The Sobrato Organization None Completed 2022 Parking Corporate Design-Build BACK TO PROJECTS
- 260 California
This 44,459 SF design/build 3-story mixed-use concrete structure has one level of subterranean parking and one level of podium parking. The project features a warm shell and core designed for food service on the first level and two stories of office space above. Excavation includes a soldier beam and lagging system with tie backs and underpinning of adjacent buildings. The exterior skin is composed of thin-set stone tile, colored plaster, and an aluminum glazing system. The building is adjacent to public transportation, utilizes sustainable materials, and is designed for maximum water and energy efficiency. 260 California Palo Alto, CA This 44,459 SF design/build 3-story mixed-use concrete structure has one level of subterranean parking and one level of podium parking. The project features a warm shell and core designed for food service on the first level and two stories of office space above. Excavation includes a soldier beam and lagging system with tie backs and underpinning of adjacent buildings. The exterior skin is composed of thin-set stone tile, colored plaster, and an aluminum glazing system. The building is adjacent to public transportation, utilizes sustainable materials, and is designed for maximum water and energy efficiency. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Tarob M&C Investors, LLC None Completed 2015 Corporate Design-Build BACK TO PROJECTS
- Berkeley Commons
This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Berkeley Commons Berkeley, CA This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Services Provided: Architect of Record: Client: News: Construction Gensler Lane Partners None Completed 2024 Commercial LEED Gold BACK TO PROJECTS
- Platform 16
Design/build project consisting of demolition to multiple existing structures and the construction of three new 6-story, steel framed high rises over a 3-level below grade parking structure. Project features core and warm shell offices, along with retail space total approximately 1,200,000 SF. The site features two large plazas between the buildings consisting of 16 terraces including an open air bridge connecting the third levels of two of the buildings. Platform 16 San Jose, CA Design/build project consisting of demolition to multiple existing structures and the construction of three new 6-story, steel framed high rises over a 3-level below grade parking structure. Project features core and warm shell offices, along with retail space total approximately 1,200,000 SF. The site features two large plazas between the buildings consisting of 16 terraces including an open air bridge connecting the third levels of two of the buildings. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction Inc. and KPF Architects Boston Properties & TMG None https://newatlas.com/architecture/platform-16-kpf-office/ In Progress Corporate Retail BACK TO PROJECTS
- Hanover and Page Mill Building
This project consists of a new 2-story structure totaling approximately 136,000 SF of warm shell and core, which includes a 49,000 SF basement level for parking. Skin consists of a combination of GFRC, metal paneling/cladding, and curtainwall/storefront systems. The project features new sitework throughout, efficient MEP systems and exterior skin elements. The project has zero net energy goals and is a LEED Platinum Award Winner. Hanover and Page Mill Building Palo Alto, CA This project consists of a new 2-story structure totaling approximately 136,000 SF of warm shell and core, which includes a 49,000 SF basement level for parking. Skin consists of a combination of GFRC, metal paneling/cladding, and curtainwall/storefront systems. The project features new sitework throughout, efficient MEP systems and exterior skin elements. The project has zero net energy goals and is a LEED Platinum Award Winner. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture Hanover Page Mill Associates LP None https://www.e-architect.com/sanfrancisco/hanover-page-mill-palo-alto-building https://www.architectmagazine.com/project-gallery/hanover-page-mill https://archello.com/project/hanover-page-mill Completed 2015 Corporate Stanford Research Park LEED Platinum BACK TO PROJECTS
- Redwood City Marshall Campus
This project consists of 51,000 SF interior tenant improvements of floors 1, 4 and 5 of a recently completed 8-story building. The first level consists of a small break area, security/badging, and a large training room. Floors 4 and 5 include office space, conference rooms, full break rooms and features open ceilings throughout most of the space which highlight the structure. High-end finishes include millwork wall paneling and wood ceilings, meeting booth (pods) and fabric ceiling panels. The fourth floor also features a servery, catering kitchen and dining area which serve as “All-hands” space. Redwood City Marshall Campus Redwood City, CA This project consists of 51,000 SF interior tenant improvements of floors 1, 4 and 5 of a recently completed 8-story building. The first level consists of a small break area, security/badging, and a large training room. Floors 4 and 5 include office space, conference rooms, full break rooms and features open ceilings throughout most of the space which highlight the structure. High-end finishes include millwork wall paneling and wood ceilings, meeting booth (pods) and fabric ceiling panels. The fourth floor also features a servery, catering kitchen and dining area which serve as “All-hands” space. Services Provided: Architect of Record: Client: News: Construction Bohlin Cywinski Jackson Confidential None Completed 2018 Corporate Tenant Improvement BACK TO PROJECTS
- Thermo-Fisher
This design/build tenant improvement project consists of a 90,000 SF interior conversion of an existing 185,000 SF concrete tilt-up into a plastics manufacturing facility. Project included an overhead rack distribution system, new customized electrical, mechanical, process piping, and condensed dry air systems to support the thermoplastic injection equipment, and storage housed in 65,000 SF of the one-story space. Special facilities include a tool room, a grinding room, and an outside chiller plant, and two large silos to feed raw materials to the machines. Since the tanks were erected on special concrete pads on the gradient of the loading dock incline, a new and catwalk with safety rail was built to accommodate the change in elevation. The remaining 25,000 SF of office space includes a large break room with an exterior patio, a small break room, large conference areas and perimeter offices. One conference room includes a sliding partition and built-in video projection and audio equipment. Thermo-Fisher Petaluma, CA This design/build tenant improvement project consists of a 90,000 SF interior conversion of an existing 185,000 SF concrete tilt-up into a plastics manufacturing facility. Project included an overhead rack distribution system, new customized electrical, mechanical, process piping, and condensed dry air systems to support the thermoplastic injection equipment, and storage housed in 65,000 SF of the one-story space. Special facilities include a tool room, a grinding room, and an outside chiller plant, and two large silos to feed raw materials to the machines. Since the tanks were erected on special concrete pads on the gradient of the loading dock incline, a new and catwalk with safety rail was built to accommodate the change in elevation. The remaining 25,000 SF of office space includes a large break room with an exterior patio, a small break room, large conference areas and perimeter offices. One conference room includes a sliding partition and built-in video projection and audio equipment. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Thermo-Fisher None Completed 2010 Industrial Center Tenant Improvement Design-Build BACK TO PROJECTS
- The Fairmont Hotel
This project consists of a thirteen floor, 264 room concrete structure with GFRC and stone exterior. The 254,000 SF project is comprised of a two-story retail and conference center topped by an eleven-story guest tower that connects to the existing hotel via a pedestrian bridge at the 2nd floor and subterranean service tunnel. The Fairmont Hotel San Jose, CA This project consists of a thirteen floor, 264 room concrete structure with GFRC and stone exterior. The 254,000 SF project is comprised of a two-story retail and conference center topped by an eleven-story guest tower that connects to the existing hotel via a pedestrian bridge at the 2nd floor and subterranean service tunnel. Services Provided: Architect of Record: Client: News: Construction Gensler Santa Monica Wolff Urban Development None Completed 2002 Hotel BACK TO PROJECTS
- 488 Almaden
Seventeen-story high rise located in the heart of downtown San Jose. This structural steel office building with precise concrete panels, glass and glazing skin consists of 381,001 square feet along with one eleven-story parking garage (three levels below grade) consisting of 440,017 square feet. 488 Almaden San Jose, CA Seventeen-story high rise located in the heart of downtown San Jose. This structural steel office building with precise concrete panels, glass and glazing skin consists of 381,001 square feet along with one eleven-story parking garage (three levels below grade) consisting of 440,017 square feet. Services Provided: Architect of Record: Client: News: Construction Korth Sunseri Hagey Architects Sobrato Development None Completed 2003 Corporate Steel Construction BACK TO PROJECTS
- Gateway Family Housing
160,716 SF project consisting of 140 residential units in a Type VA fully sprinklered building, with associated common areas and on grade parking within a 4-acre site. The building features 3-4 story wood-framed buildings comprised of 66 one-bedroom units, 50 two-bedroom units and 24 three-bedroom units; one of the two-bedroom units is reserved for an on-site manager. Parking includes 177 surface parking spaces, which consists of 15 handicap spaces and 14 EV charging spaces. Site work features new asphalt parking areas, concrete plaza areas, pathways, bioswales and plantings, and relocation of utilities within the existing frontage road. This building is designed as a 100% electric efficient building. Gateway Family Housing Menlo Park, CA 160,716 SF project consisting of 140 residential units in a Type VA fully sprinklered building, with associated common areas and on grade parking within a 4-acre site. The building features 3-4 story wood-framed buildings comprised of 66 one-bedroom units, 50 two-bedroom units and 24 three-bedroom units; one of the two-bedroom units is reserved for an on-site manager. Parking includes 177 surface parking spaces, which consists of 15 handicap spaces and 14 EV charging spaces. Site work features new asphalt parking areas, concrete plaza areas, pathways, bioswales and plantings, and relocation of utilities within the existing frontage road. This building is designed as a 100% electric efficient building. Services Provided: Architect of Record: Client: News: Construction Mithun MidPen Housing Corp. None Completed 2023 Residential 140 Units 100% Electric Efficient BACK TO PROJECTS












