Search Results
383 results found with an empty search
- 600 Clyde
This 190,000 SF project consists of one 5-story Class ‘A’ steel office building with one 3-level concrete parking garage. 600 Clyde Mountain View, CA This 190,000 SF project consists of one 5-story Class ‘A’ steel office building with one 3-level concrete parking garage. Services Provided: Architect of Record: Client: News: Construction ArcTec Renault & Handley None Completed 2020 Corporate LEED Platinum BACK TO PROJECTS
- Hotel Montgomery
Improvements include conversion of existing historic structure into new 86 room boutique hotel with interior/exterior restaurant. Project features restoration of historic elements including double hung wood windows, historic plaster, historic lobby mosaic flooring, and exterior facades. Other additions include addition of a interior mezzanine, new elevators, and other structural enhancements. Exterior Plaza consists of architectural concrete, fountains, and bocce courts. Hotel Montgomery San Jose, CA Improvements include conversion of existing historic structure into new 86 room boutique hotel with interior/exterior restaurant. Project features restoration of historic elements including double hung wood windows, historic plaster, historic lobby mosaic flooring, and exterior facades. Other additions include addition of a interior mezzanine, new elevators, and other structural enhancements. Exterior Plaza consists of architectural concrete, fountains, and bocce courts. Services Provided: Architect of Record: Client: News: Construction NA DivcoWest None Completed 2004 Hotel / Resort Historical BACK TO PROJECTS
- Santa Cruz Lighthouse
Project consists of a 45 FT Coast Guard approved lighthouse sitting at the point of the jetty. Santa Cruz Lighthouse Santa Cruz, CA Project consists of a 45 FT Coast Guard approved lighthouse sitting at the point of the jetty. Services Provided: Architect of Record: Client: News: Construction Mesiti-Miller Engineering Santa Cruz Port District None Completed 2002 Infrastructure BACK TO PROJECTS
- Jessie Street Terrace
Project consisting of demolition to existing building, as well as new construction of a 32,861 SF, 5-story concrete, wood frame multifamily residential rental development featuring 50 units. The project also includes surface and tuck under parking, on-site office space for staff, and common areas including a laundry room, community room, and trash rooms. Jessie Street Terrace Santa Cruz, CA Project consisting of demolition to existing building, as well as new construction of a 32,861 SF, 5-story concrete, wood frame multifamily residential rental development featuring 50 units. The project also includes surface and tuck under parking, on-site office space for staff, and common areas including a laundry room, community room, and trash rooms. Services Provided: Architect of Record: Client: News: Construction Paul Davis Partnership MP Boardwalk Assoicates, L.P. c/o MidPen Housing Corporation None In Progress Residential Parking Structure BACK TO PROJECTS
- City of Watsonville Civic Center
This project includes the construction management of a four story 150,000 SF Civic Office building for Griffin Development. Building is steel framed, lath and plaster exterior with punched opening windows. Tenant improvements include City Hall, City Library, the City Hall parking garage, and County Courthouse. City of Watsonville Civic Center Watsonville, CA This project includes the construction management of a four story 150,000 SF Civic Office building for Griffin Development. Building is steel framed, lath and plaster exterior with punched opening windows. Tenant improvements include City Hall, City Library, the City Hall parking garage, and County Courthouse. Services Provided: Architect of Record: Client: News: Construction LPA Architects City of Watsonville None Completed 2007 Civic Center BACK TO PROJECTS
- Skyport Plaza Garage
Project consisting of two 4-story concrete parking structures with parking for 1,840 vehicles. The garage service a commercial campus of three concrete office buildings and two steel retail structures. Skyport Plaza Garage San Jose, CA Project consisting of two 4-story concrete parking structures with parking for 1,840 vehicles. The garage service a commercial campus of three concrete office buildings and two steel retail structures. Services Provided: Architect of Record: Client: News: Construction Kenneth Rodrigues & Partners, Inc Equity Office Properties None Completed 2001 Parking Structure BACK TO PROJECTS
- UOP Vereschagin Alumni House
Devcon provided pre-construction and construction services for design and construction of a new, two-story, wood framed facility of approximately 9,600 SF. Project consists of meeting rooms, office areas, resource library, and reception area with high-end finishes; catering kitchen, and circulation & storage areas. Site improvements include primary pedestrian access from adjacent parking area including donor "Brick" plaza and new terrace area. UOP Vereschagin Alumni House Stockton, CA Devcon provided pre-construction and construction services for design and construction of a new, two-story, wood framed facility of approximately 9,600 SF. Project consists of meeting rooms, office areas, resource library, and reception area with high-end finishes; catering kitchen, and circulation & storage areas. Site improvements include primary pedestrian access from adjacent parking area including donor "Brick" plaza and new terrace area. Services Provided: Architect of Record: Client: News: Construction LDA Partners University of the Pacific None Completed 2011 Residential Education LEED Gold BACK TO PROJECTS
- Omnivision
This project includes the design/build remodel of four 2-story buildings totaling 205,000 SF. Project consists of general office space, engineering labs with a Class 100 and Class 5,000 clean room and server room. Omnivision Santa Clara, CA This project includes the design/build remodel of four 2-story buildings totaling 205,000 SF. Project consists of general office space, engineering labs with a Class 100 and Class 5,000 clean room and server room. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Omnivision Technologies None Completed 2008 Corporate Tenant Improvement Design-Build BACK TO PROJECTS
- Raley's
This project includes a 75,000 SF upgraded supermarket located at the McQueen Crossing shopping center. Exterior of building is constructed with brick, stone, plaster, and wood shingle siding in the "cottage" architectural vernacular. Interior tenant improvements consisted of over 20 different flooring types/patterns and complicated curtainwall soffits at the ceiling level. Raley's Reno, NV This project includes a 75,000 SF upgraded supermarket located at the McQueen Crossing shopping center. Exterior of building is constructed with brick, stone, plaster, and wood shingle siding in the "cottage" architectural vernacular. Interior tenant improvements consisted of over 20 different flooring types/patterns and complicated curtainwall soffits at the ceiling level. Services Provided: Architect of Record: Client: News: Construction HMR Architects, Inc. McQueen Crossings LLC None Completed 2004 Retail Tenant Improvements BACK TO PROJECTS
- Mountain View Campus Cafe
This project includes an 8,500 SF Café with authentic Japanese design elements, such as private dining rooms with recessed floors and shoji screen doors, tatami mat seating areas, and fabric wall panels. Other high-end finishes include stone tile floors, hand-painted wall tiles, wood slat ceilings, custom banquettes, and numerous other custom wood elements. Exterior improvements feature an updated patio area with built-in wood benches, a new fountain, cedar perimeter fence, and new Japanese gate structures. The Café was built inside an occupied building and completed successfully on an extremely tight seven week schedule, requiring double- and triple-shifts for the full duration. Mountain View Campus Cafe Mountain View, CA This project includes an 8,500 SF Café with authentic Japanese design elements, such as private dining rooms with recessed floors and shoji screen doors, tatami mat seating areas, and fabric wall panels. Other high-end finishes include stone tile floors, hand-painted wall tiles, wood slat ceilings, custom banquettes, and numerous other custom wood elements. Exterior improvements feature an updated patio area with built-in wood benches, a new fountain, cedar perimeter fence, and new Japanese gate structures. The Café was built inside an occupied building and completed successfully on an extremely tight seven week schedule, requiring double- and triple-shifts for the full duration. Services Provided: Architect of Record: Client: News: Construction BOORA Architects Confidential None Completed 2011 Corporate Tenant Improvement BACK TO PROJECTS
- El Camino Family Housing
This 225,000 SF multifamily rental development consists of 109 housing units, with a parking garage and surface parking to house 211 cars. Project also features commercial and community space, onsite office space for staff, and common areas including a laundry room and central landscaped area with play structure. The development consists of (1) five-story wood frame building, (1) four-story wood framed building and (6) attached townhouses all sitting upon a two acre concrete podium. Project is Green Point Rated featuring rooftop photovoltaic solar, solar water heating, and community garden within walkable distance to BART. El Camino Family Housing South San Francisco, CA This 225,000 SF multifamily rental development consists of 109 housing units, with a parking garage and surface parking to house 211 cars. Project also features commercial and community space, onsite office space for staff, and common areas including a laundry room and central landscaped area with play structure. The development consists of (1) five-story wood frame building, (1) four-story wood framed building and (6) attached townhouses all sitting upon a two acre concrete podium. Project is Green Point Rated featuring rooftop photovoltaic solar, solar water heating, and community garden within walkable distance to BART. Services Provided: Architect of Record: Client: News: Construction BAR Architects MidPen Housing Corporation None Completed 2012 Residential Green Point Rated BACK TO PROJECTS
- Zibco - Quality Bicycles
This project includes a 184,993 SF design/build Thermomass Insulated tilt-up panel building with 40’ clear height on a 10 acre site. The project features 15,000 SF of offices, warehouse office and warehouse restrooms, and consists of a carbon-neutral design with no gas to the building and includes installation of a partial solar array with the expectations to build out the maximum allowable solar array within one year after project demands can be determined. Project also features 16 dock positions with two oversized drive indoors and complete site retention/detention with no runoff to storm drain allowed. Project consists of a multitude of client input including the request to design the project to represent the Reno/Sparks/Tahoe area, thus the use of reveals to create a mountainous theme on the front of the building. The exterior paint color selections are based on the usage of the QBP marketing color palette. Zibco - Quality Bicycles Spanish Springs, NV This project includes a 184,993 SF design/build Thermomass Insulated tilt-up panel building with 40’ clear height on a 10 acre site. The project features 15,000 SF of offices, warehouse office and warehouse restrooms, and consists of a carbon-neutral design with no gas to the building and includes installation of a partial solar array with the expectations to build out the maximum allowable solar array within one year after project demands can be determined. Project also features 16 dock positions with two oversized drive indoors and complete site retention/detention with no runoff to storm drain allowed. Project consists of a multitude of client input including the request to design the project to represent the Reno/Sparks/Tahoe area, thus the use of reveals to create a mountainous theme on the front of the building. The exterior paint color selections are based on the usage of the QBP marketing color palette. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc Quality Bicycle Products None Completed 2020 Industrial Center Design-Build BACK TO PROJECTS












