top of page
Devcon Home

Search Results

Search this site

397 results found with an empty search

  • UOP Janssen Lagorio Gym

    This project features a 23,000 SF construction of new multi-purpose sports and recreation facility for basketball, volleyball, and other intercollegiate sports and recreational activities. In addition to the large, high ceiling space, there will be storage spaces, restrooms and a small training room. UOP Janssen Lagorio Gym Stockton, CA This project features a 23,000 SF construction of new multi-purpose sports and recreation facility for basketball, volleyball, and other intercollegiate sports and recreational activities. In addition to the large, high ceiling space, there will be storage spaces, restrooms and a small training room. Services Provided: Architect of Record: Client: News: Construction WMB Architects University of the Pacific None Completed 2009 Education Athletic Center BACK TO PROJECTS

  • Athleta Headquarters

    This project is a 40,000 SF tenant improvement for Athleta Headquarters. Project features used reclaimed wood, sketch doors, polished concrete floors and a yoga studio. Athleta Headquarters Petaluma, CA This project is a 40,000 SF tenant improvement for Athleta Headquarters. Project features used reclaimed wood, sketch doors, polished concrete floors and a yoga studio. Services Provided: Architect of Record: Client: News: Construction IA Interior Architects GAP None Completed 2012 Corporate Tenant Improvement BACK TO PROJECTS

  • Reputation

    This project includes a 26,000 SF two-story remodel of the second and third floors in existing 5-story office building. Project includes private offices and conference rooms, updated restrooms, and open office areas for bench seating. The design team designed the open office space with a bright white exposed ceiling which shows off the ductwork and office lighting. Specialty finishes include sealed concrete, multi-colored carpet and panelized wood doors, chandeliers, fabric panels and custom logo wallcovering. Reputation Redwood City, CA This project includes a 26,000 SF two-story remodel of the second and third floors in existing 5-story office building. Project includes private offices and conference rooms, updated restrooms, and open office areas for bench seating. The design team designed the open office space with a bright white exposed ceiling which shows off the ductwork and office lighting. Specialty finishes include sealed concrete, multi-colored carpet and panelized wood doors, chandeliers, fabric panels and custom logo wallcovering. Services Provided: Architect of Record: Client: News: Construction NA Reputation.com None Completed 2012 Corporate Tenant Improvement BACK TO PROJECTS

  • Classic Residence by Hyatt - La Jolla

    This project includes the construction of an independent living facility totaling 765,000 SF. Project features a new 400,000 SF 20-story reinforced concrete tower, a 3-level underground parking structure that is tied into the existing underground parking structure and a one story, 10,000 SF structural steel connector building. Project consists of 184 customized senior living units ranging from 1,500 SF to 3,000 SF and includes over 365,000 SF of sitework and renovation of public areas in the existing 20-story tower. The new tower and connector building also include multiple dining venues; a new indoor pool with locker rooms, exercise rooms and hair salon; conservatory; reading, computer and billiards rooms; and a grand living room. The site was renovated to incorporate a central circular driveway with walking paths, arbors and landscaped terraces. Classic Residence by Hyatt - La Jolla San Diego, CA This project includes the construction of an independent living facility totaling 765,000 SF. Project features a new 400,000 SF 20-story reinforced concrete tower, a 3-level underground parking structure that is tied into the existing underground parking structure and a one story, 10,000 SF structural steel connector building. Project consists of 184 customized senior living units ranging from 1,500 SF to 3,000 SF and includes over 365,000 SF of sitework and renovation of public areas in the existing 20-story tower. The new tower and connector building also include multiple dining venues; a new indoor pool with locker rooms, exercise rooms and hair salon; conservatory; reading, computer and billiards rooms; and a grand living room. The site was renovated to incorporate a central circular driveway with walking paths, arbors and landscaped terraces. Services Provided: Architect of Record: Client: News: Construction Confidential Confidential None Completed 2008 Hotel / Resort Residential BACK TO PROJECTS

  • Milpitas East Parking Garage

    125,000 SF parking structure consisting of four levels with parking for 281 vehicles. The garage is a poured in place, post tension, beam and slab structure. The structure also includes space for a future restroom, which will be utilized by the new library. This project will also consists of minor office space, a janitor's room, an electrical and telecommunications room and sitework. Milpitas East Parking Garage Milpitas, CA 125,000 SF parking structure consisting of four levels with parking for 281 vehicles. The garage is a poured in place, post tension, beam and slab structure. The structure also includes space for a future restroom, which will be utilized by the new library. This project will also consists of minor office space, a janitor's room, an electrical and telecommunications room and sitework. Services Provided: Architect of Record: Client: News: Construction Chong Partners Architect City of Milpitas None Completed 2007 Parking Structure BACK TO PROJECTS

  • 1050 Page Mill

    Project features the redevelopment of a 13.5 acre site at the intersection of Page Mill Road and Hansen Way in the Stanford Research Park. The new 500,000 SF project consists of four all-glass two-story Class A office buildings surrounding an open landscaped courtyard with several fountains and a dedicated underground parking garage for each building. Exterior skin includes elements such as glass fins which distinguish each different building by utilizing a specific dedicated color, flat metal panels, arching metals panels, and large balconies. 1050 Page Mill Palo Alto, CA Project features the redevelopment of a 13.5 acre site at the intersection of Page Mill Road and Hansen Way in the Stanford Research Park. The new 500,000 SF project consists of four all-glass two-story Class A office buildings surrounding an open landscaped courtyard with several fountains and a dedicated underground parking garage for each building. Exterior skin includes elements such as glass fins which distinguish each different building by utilizing a specific dedicated color, flat metal panels, arching metals panels, and large balconies. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture 1050 Page Mill Properties, LLC None https://www.bizjournals.com/sanjose/news/2017/09/22/stanford-research-park-projects-architectural.html Completed 2019 Corporate Stanford Research Park LEED Platinum BACK TO PROJECTS

  • Skyport Plaza

    1,176,000 SF project consisting of three 8-story structural steel/precast concrete panel office towers, two steel frame retail structures and two 4-story concrete parking structures with parking for 1,840 cars. Extensive sitework and offsite improvements were also included in this phase of the project along with 340,000 SF office tenant improvements on sixteen floors within two existing 8-story buildings for Siemens. Skyport Plaza San Jose, CA 1,176,000 SF project consisting of three 8-story structural steel/precast concrete panel office towers, two steel frame retail structures and two 4-story concrete parking structures with parking for 1,840 cars. Extensive sitework and offsite improvements were also included in this phase of the project along with 340,000 SF office tenant improvements on sixteen floors within two existing 8-story buildings for Siemens. Services Provided: Architect of Record: Client: News: Construction Kenneth Rodrigues & Partners, Inc Equity Office Properties None Completed 2001 Corporate BACK TO PROJECTS

  • 599 Castro

    This mixed-use project consists of both commercial and residential buildings. The commercial portion features 109,108 SF of office space including 8,622 SF of future retail space, and three levels of subterranean parking. Work includes removal of an existing parking lot, three levels of excavation and below grade concrete parking structure, and construction of a 4-story steel structure with GFRC and punch glazing skin. The project also features office interior buildouts, as well as site work, consisting of a variety of hardscape and landscaping around the perimeter of the project; site work also includes an interior courtyard that ties the office, residential and Church buildings together. The residential portion of this project consists of a 17,290 SF, 3-story mixed-use residential building which sits on podium level with an underground garage below, shared with the adjacent office building on the site. The units are comprised of four 1-bedroom single story flats, eight 2-story townhomes, and a 3,430 SF ground level parish office. The building’s exterior materials consist of GFRC with natural stone accent exterior finish with three different colors. 599 Castro Mountain View, CA This mixed-use project consists of both commercial and residential buildings. The commercial portion features 109,108 SF of office space including 8,622 SF of future retail space, and three levels of subterranean parking. Work includes removal of an existing parking lot, three levels of excavation and below grade concrete parking structure, and construction of a 4-story steel structure with GFRC and punch glazing skin. The project also features office interior buildouts, as well as site work, consisting of a variety of hardscape and landscaping around the perimeter of the project; site work also includes an interior courtyard that ties the office, residential and Church buildings together. The residential portion of this project consists of a 17,290 SF, 3-story mixed-use residential building which sits on podium level with an underground garage below, shared with the adjacent office building on the site. The units are comprised of four 1-bedroom single story flats, eight 2-story townhomes, and a 3,430 SF ground level parish office. The building’s exterior materials consist of GFRC with natural stone accent exterior finish with three different colors. Services Provided: Architect of Record: Client: News: Construction Steinberg Hart, ArcTec Inc. The Sobrato Organization None Completed 2018 Corporate Retail Residential BACK TO PROJECTS

  • SCU Schott Athletic Excellence Center

    This design/build project consists of 50,000 SF combined steel/metal framing and concrete tilt-up structure. The new athletics facility houses two full-size courts that serve as a dedicated practice facility for the university basketball and volleyball teams. The facility also houses an approximate 7,000 SF weight room, nutrition station, staff offices and kitchen, academic center, and 5,000 SF sports medicine center. The academic center consists of offices, conference room, and both private and collaborative study areas while the sports medicine center features training equipment, thermal and cold therapy pools, and a hydrotherapy pool for rehabilitation and fitness. SCU Schott Athletic Excellence Center Santa Clara, CA This design/build project consists of 50,000 SF combined steel/metal framing and concrete tilt-up structure. The new athletics facility houses two full-size courts that serve as a dedicated practice facility for the university basketball and volleyball teams. The facility also houses an approximate 7,000 SF weight room, nutrition station, staff offices and kitchen, academic center, and 5,000 SF sports medicine center. The academic center consists of offices, conference room, and both private and collaborative study areas while the sports medicine center features training equipment, thermal and cold therapy pools, and a hydrotherapy pool for rehabilitation and fitness. Services Provided: Architect of Record: Client: News: Design, Construction Brent Downing AIA, ASLA, LEED AP - Devcon Construction, Inc. Santa Clara University None Completed 2020 Athletic Center Design-Build Santa Clara University BACK TO PROJECTS

  • Bishop O'Dowd Athletic & Co-Curricular Center

    New 34,000 SF gymnasium and classroom building on the existing Bishop O’Dowd High School campus, including associated site work and a partial remodel of the existing gym building. The new building is a combination of tilt-up panel construction at the gym and steel/concrete at the 3-story classroom wing. This project is a LEED Silver Award winner. Bishop O'Dowd Athletic & Co-Curricular Center Oakland, CA New 34,000 SF gymnasium and classroom building on the existing Bishop O’Dowd High School campus, including associated site work and a partial remodel of the existing gym building. The new building is a combination of tilt-up panel construction at the gym and steel/concrete at the 3-story classroom wing. This project is a LEED Silver Award winner. Services Provided: Architect of Record: Client: News: Construction Studio Bondy Architecture Bishop O'Dowd High School None https://api.ibeamsystems.com/?session=QmlzaG9wT0Rvd2RIaWdoU2Nob29sOk1pbHBpdGFzQ0E= Completed 2022 Education LEED Silver BACK TO PROJECTS

  • Foxhollow Technologies

    This 60,985 SF tenant improvement includes open offices, Clean Rooms, clinical lab, manufacturing room, and shipping & receiving areas. Project is an FDA certified faculty. Foxhollow Technologies Redwood City, CA This 60,985 SF tenant improvement includes open offices, Clean Rooms, clinical lab, manufacturing room, and shipping & receiving areas. Project is an FDA certified faculty. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Foxhollow Technologies None Completed 2005 Laboratory Tenant Improvement Design-Build BACK TO PROJECTS

  • Coleman Highline

    This project consists of design/build core and shell office development utilizing steel systems and a unitized curtain wall system. Project consists of one 5-story office building approximately 166,000 SF and one 6-story office building approximately 198,000 SF. The buildings are connected at the third floor by a pedestrian bridge called the “Highline” walkway. Coleman Highline San Jose, CA This project consists of design/build core and shell office development utilizing steel systems and a unitized curtain wall system. Project consists of one 5-story office building approximately 166,000 SF and one 6-story office building approximately 198,000 SF. The buildings are connected at the third floor by a pedestrian bridge called the “Highline” walkway. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Hunter Properties, Inc. None https://www.bizjournals.com/sanjose/news/2019/07/24/verizon-coleman-highline-development-san-jose.html Completed 2021 Corporate Design-Build BACK TO PROJECTS

bottom of page