top of page
Devcon_Logo_wTaglines.png

Search Results

383 results found with an empty search

  • Franklin Templeton Investments Data Center

    This 25,000 SF warm shell build out includes a new data center and support rooms in an existing tilt-up concrete shell and site work. Devcon used BIM to 3D model the Data Center and Chiller Plant before construction began. Franklin Templeton Investments Data Center Stockton, CA This 25,000 SF warm shell build out includes a new data center and support rooms in an existing tilt-up concrete shell and site work. Devcon used BIM to 3D model the Data Center and Chiller Plant before construction began. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Franklin Templeton Companies None Completed 2010 Data Center Design-Build LEED Silver BACK TO PROJECTS

  • Devcon Construction, Inc. | Services

    The idea behind the Design-Build model of construction may seem obvious, yet the benefits of working with a true Design-Build firm such as Devcon goes well beyond the basic concept of the architect and the builder operating under the same contract. By integrating in-house design and construction management since its inception, Devcon has developed a professional environment of collaboration and continual conversation between highly trained and experienced professionals. SERVICES DESIGN-BUILD Design-Build is a unique method of project delivery in which the architect and the contractor act as a unified team and are under the same single contract to the client. This approach creates a synchronized work flow from conceptual design to construction completion. The idea behind the Design-Build model of construction may seem obvious, yet the benefits of working with a true Design-Build firm such as Devcon goes well beyond the basic concept of the architect and the builder operating under the same contract. By integrating in-house design and construction management since its inception, Devcon has developed a professional environment of collaboration and continual conversation between highly trained and experienced professionals. This communication style allows Devcon to produce quality projects in a shortened timeline compared to a traditional Design-Bid-Build project delivery method. This collaborative instinct carries over to Devcon’s long and established partnerships with hundreds of independent architects and engineers. Taking pride in the level of design provided by our own internal architecture and design teams, we are a qualified and dedicated resource for owners, developers, architects and engineers. As a result, we are often called upon to take a Design Assist role to support an independent architect or engineer with construction plans and documents. INTEGRATED PROJECT DELIVERY INTEGRATED DESIGN-BUILD DESIGN-BUILD SUBCONTRACTING PRE-CONSTRUCTION Start with the end in mind. That maxim applies especially well to construction projects. For Devcon, THE END that we start with goes well beyond how a project will look silhouetted against a cloud-filled sky. For Devcon, THE END is the dream our customer had when the project was first conceived. How do we satisfy it? How do we improve it? How do we make the lives of those who will live or work in it better? Most of the answers are found during Preconstruction. In the early planning stages of a project, our design and construction departments will work with the client to develop drawings, budgets, and schedules while providing insight into the contributing variables such as materials and construction methods. Devcon professionals join the design phase early, bringing out team member expertise with respect to: Materials selection Construction systems Cost avoidance Scheduling The requirements of each project are unique, and we tailor the budgeting and planning processes to suit them. However, we typically produce four detailed budgets during Preconstruction: Budget 1 – schematic design phase Budget 2 – design development phase Budget 3 – 50% construction document stage Budget 4 – 75% construction document stage Each successive budget informs the next and helps to shape the choice of materials, schedule, subcontractor selection and purchasing of items with long lead-times. Although construction is by nature a dynamic process, Devcon’s goal in every project's preconstruction is to lay the groundwork of the construction process in order to minimize disruptions as construction advances and completes. ESTIMATING CONSTRUCTION We facilitate the overall coordination and oversight of our projects by orchestrating the construction site, the management of subcontractors and trades, and the communication between all involved disciplines and parties throughout the entire project timeline. Traditionally, a building owner or developer hires a general contractor to handle construction based on an architect’s plans. The general contractor provides cost estimates and schedules, manages the project, acquires all necessary permits, provides all necessary equipment, maintains the “site general conditions” such as trailers equipment, controls site access and security, and hires subcontractors. As a builder, Devcon self-performs the demolition, framing, carpentry and concrete work, so generally our subcontractors participate in the highly specialized MEP trades (mechanical, electrical and plumbing). As the general contractor, Devcon project managers and superintendents supervise the day-to-day on-site construction. For Devcon, the heart of general contracting is relationship management and communication. We need to know, understand and anticipate the needs of the building owner or developer, the needs of our client’s architect and engineers, and the needs of our own subcontractors and field staff. Keeping everyone on the same page, pointed in the same direction is the key to a successful project that achieves its scheduling and budgeting goals. TENANT IMPROVEMENT INFRASTRUCTURE REFRESH PROJECT CLOSEOUT SELF PERFORM As a builder, Devcon self-performs the demolition, framing, carpentry and concrete work, so generally our subcontractors participate in the highly specialized mechanical, electrical and plumbing trades (MEP). As the general contractor, Devcon project managers and superintendents supervise the day-to-day on-site construction. DEMOLITION WOOD FRAMING & ROUGH CARPENTRY MASS TIMBER ERECTION STRUCTURAL CONCRETE SUSTAINABILITY Devcon Construction has a full-time sustainability personnel in-house dedicated to finding cost-effective solutions and materials to fit any budget or level of certification on both the design and build side of our business. Our team of LEED accredited sustainability engineers interface directly with clients and consultants to coordinate certification strategy and documentation and work closely with on-site construction teams to deliver a wide range of sustainable building solutions in the field. They also specialize in researching product specifications, new sustainable materials, and construction methods that we can utilize to continue to meet any owner requirements and green building standards as the industry develops, while maintaining schedule, constructability, and budget. We pride ourselves on the completion of 300+ LEED projects and having 50+ LEED professionals within our design and construction groups. Devcon has participated in the Living Building Challenge on the Shoreline Creative Campus with our in-house sustainability team and achieved the Materials Petal for that campus. “The intent of the Materials Petal is to help create a materials economy that is non-toxic, ecologically restorative, transparent, and socially equitable.” International Living Future Institute. BIM Building Information Modeling refers to the process by which designers create a 3D digital representation of both physical and functional characteristics in a space using various tools and technologies. Devcon generally uses BIM to coordinate between multiple building disciplines. The integrated practice of Building Information Modeling (BIM) allows Devcon to develop a comprehensive, virtual working model of a project. It brings teams together, clarifies communication, ensures cooperation, and identifies problems in the virtual world before they become problems in the real world. Essentially, BIM offers in-depth spatial and property structure which is advantageous in the early stages of multi-disciplinary clash detection. We utilize a variety of software tools including NavisWorks which turns plans into 3D digital models that are fully compatible with systems used by our architecture and engineering partners. We aim to further Devcon’s technical capabilities through continuous innovation in digital design and construction. Going beyond the traditional three dimensions of height, width and depth, Devcon uses BIM for coordinated, expedited scheduling–that is, to control the fourth dimension of time/schedules–4D BIM. We also use BIM for extremely accurate budgeting, making cost the fifth dimension of the project–5D BIM. Finally, Devcon is invested fully in the ambition of BIM to become the standard tool for building owners to maximize the lifetime value of their properties. A detailed, up-to-date digital model can be used to test ideas for energy savings, alternative materials and wear patterns. Modern-day BIM technology allows us to break down even the smallest of data such as heat transfer or air pressure in order to consider all aspects of design and construction in the design process. With the sixth dimension of equipment and materials information added, 6D BIM becomes a living document that the building owner can use to reduce operational costs over the building’s expected lifespan. Design-Build Preconstruction Construction Self Perform Sustainability BIM

  • SanDisk

    Project consists of an interior demolition and renovation of the SanDisk campus featuring five 2-story buildings totaling 580,637 SF. The buildings include an auditorium, cafeteria, all hands room, fitness facility, board room, numerous video conference rooms, and an extension of the 2nd floor of the main lobby to accommodate a custom board room with rear projection and a large main entry glass feature wall. 36,000 SF of the space consists of lab renovation, with miscellaneous landscape renovations completed throughout the campus. SanDisk Milpitas, CA Project consists of an interior demolition and renovation of the SanDisk campus featuring five 2-story buildings totaling 580,637 SF. The buildings include an auditorium, cafeteria, all hands room, fitness facility, board room, numerous video conference rooms, and an extension of the 2nd floor of the main lobby to accommodate a custom board room with rear projection and a large main entry glass feature wall. 36,000 SF of the space consists of lab renovation, with miscellaneous landscape renovations completed throughout the campus. Services Provided: Architect of Record: Client: News: Construction Valerio Dewalt Train Associates Inc. SanDisk Corporation None Completed 2013 Corporate Tenant Improvement BACK TO PROJECTS

  • UOP Biological Sciences Center

    New 60,000 SF building consisting of classrooms, laboratories and lecture halls. The 2-story building, designed by Fong & Chan Architects in San Francisco, is steel-framed with a brick and precast concrete façade, to tie into the style of the campus. The project includes extensive site development and landscaping. UOP Biological Sciences Center Stockton, CA New 60,000 SF building consisting of classrooms, laboratories and lecture halls. The 2-story building, designed by Fong & Chan Architects in San Francisco, is steel-framed with a brick and precast concrete façade, to tie into the style of the campus. The project includes extensive site development and landscaping. Services Provided: Architect of Record: Client: News: Construction Fong and Chan Architects University of the Pacific None Completed 2008 Education BACK TO PROJECTS

  • Somersett Club Town Center

    This project includes the design-build 35,544 SF of two 2-story wood framed Class A retail/office buildings with core improvements and vanilla shells to include elevators. Stucco finish with stone veneer and metal roofing. Project also includes site improvements for +/- 5 acres, site preparation for two (2) separate residential condo complexes, and a 10,000 sf plaza / courtyard between the office buildings. Buildings pending LEED Silver Certification that incorporates Green features such as waterless urinals, backbone HVAC fresh air system, solatube skylights, motion sensor lighting & bathroom fixtures, and dedicated recycling enclosures. Somersett Club Town Center Reno, NV This project includes the design-build 35,544 SF of two 2-story wood framed Class A retail/office buildings with core improvements and vanilla shells to include elevators. Stucco finish with stone veneer and metal roofing. Project also includes site improvements for +/- 5 acres, site preparation for two (2) separate residential condo complexes, and a 10,000 sf plaza / courtyard between the office buildings. Buildings pending LEED Silver Certification that incorporates Green features such as waterless urinals, backbone HVAC fresh air system, solatube skylights, motion sensor lighting & bathroom fixtures, and dedicated recycling enclosures. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Somersett Development Co. None Completed 2007 Retail Corporate Design-Build BACK TO PROJECTS

  • Greenwood Commerce Center

    Project consists of a 226,000 SF concrete tilt-up building with a composite roof structure and Vulcraft truss joists, as well as a 78,000 SF concrete tilt-up building on a 19 acre site in Napa County. The project includes bio-retention for storm water, wetlands monitoring for a riparian creek that runs through the center of the site, a left-hand turn lane on Airport Blvd. and a reclaimed water line installation. Both buildings feature TPO roof systems with 5.5” of insulation. Additionally, both buildings are fitted with “Night Air Cooling” and are prepped for cased storage users. Both buildings also include loading docks, insulated, powered roll up doors, and are equipped with ESFR ready fire sprinkler systems. Greenwood Commerce Center Napa, CA Project consists of a 226,000 SF concrete tilt-up building with a composite roof structure and Vulcraft truss joists, as well as a 78,000 SF concrete tilt-up building on a 19 acre site in Napa County. The project includes bio-retention for storm water, wetlands monitoring for a riparian creek that runs through the center of the site, a left-hand turn lane on Airport Blvd. and a reclaimed water line installation. Both buildings feature TPO roof systems with 5.5” of insulation. Additionally, both buildings are fitted with “Night Air Cooling” and are prepped for cased storage users. Both buildings also include loading docks, insulated, powered roll up doors, and are equipped with ESFR ready fire sprinkler systems. Services Provided: Architect of Record: Client: News: Construction RMW Architecture & Interiors New York Life Investment Management LLC None Completed 2015 Industrial Center BACK TO PROJECTS

  • Royal Presidio

    Historical restoration of the first stone building and first cathedral in California. 4,500 SF project includes removal of the exterior plaster, stone de-pointing and re-pointing, steel pin and rod containment, re-plastering of the exterior and full interior restoration. Royal Presidio Monterey, CA Historical restoration of the first stone building and first cathedral in California. 4,500 SF project includes removal of the exterior plaster, stone de-pointing and re-pointing, steel pin and rod containment, re-plastering of the exterior and full interior restoration. Services Provided: Architect of Record: Client: News: Construction Franks Brenkwitz + Associates Diocese of Monterey None Completed 2008 Historical Tenant Improvement BACK TO PROJECTS

  • Quadrus

    This project consists of demolition of an existing 3-story office building to house a 33,127 SF 2-story office building on a 17,099 SF concrete podium over a parking garage. The project is a warm shell and features bathroom cores, office space, sitework with landscaping, and 58 parking stalls. Project also consists of an elevated concrete slab, concrete foundation walls and columns, complex shoring, retaining walls, glass and aluminum window assemblies, balconies and concrete patios, plaster and stone exterior veneer. Quadrus Menlo Park, CA This project consists of demolition of an existing 3-story office building to house a 33,127 SF 2-story office building on a 17,099 SF concrete podium over a parking garage. The project is a warm shell and features bathroom cores, office space, sitework with landscaping, and 58 parking stalls. Project also consists of an elevated concrete slab, concrete foundation walls and columns, complex shoring, retaining walls, glass and aluminum window assemblies, balconies and concrete patios, plaster and stone exterior veneer. Services Provided: Architect of Record: Client: News: Construction Robert Remiker Architect DivcoWest None Completed 2014 Corporate BACK TO PROJECTS

  • Palo Alto Networks Building 3

    This 376,000 SF project consists of interior tenant improvements to an existing 8-story building for Palo Alto Networks. The project features office space, training rooms, a full service kitchen, two catering kitchens and a coffee bar. Palo Alto Networks Building 3 Santa Clara, CA This 376,000 SF project consists of interior tenant improvements to an existing 8-story building for Palo Alto Networks. The project features office space, training rooms, a full service kitchen, two catering kitchens and a coffee bar. Services Provided: Architect of Record: Client: News: Construction Interior Architects Palo Alto Networks None Completed 2019 Corporate Tenant Improvement BACK TO PROJECTS

  • SAP Center Penthouse Lounge

    Project featuring demolition and remodel of existing suites on the penthouse level with intentions to create a conjoined lounge space. Modifications to this penthouse area include the addition of a bar, redesigned regular and ADA seating in the stadium, the implementation of mounted TVs in the seating areas, and a general update to the electrical and mechanical systems. This renovation creates an accommodating space that gives Shark fans a new way towards experiencing the SAP Center. SAP Center Penthouse Lounge San Jose, CA Project featuring demolition and remodel of existing suites on the penthouse level with intentions to create a conjoined lounge space. Modifications to this penthouse area include the addition of a bar, redesigned regular and ADA seating in the stadium, the implementation of mounted TVs in the seating areas, and a general update to the electrical and mechanical systems. This renovation creates an accommodating space that gives Shark fans a new way towards experiencing the SAP Center. Services Provided: Architect of Record: Client: News: Design, Construction Perkins & Will San Jose Arena Management, LLC None Completed 2023 Tenant Improvement Athletics BACK TO PROJECTS

  • 4880 Great America Parkway

    This 170,760 SF project consists of a 5-story structural steel. The exterior skin of the building primarily features GFRC, metal panel, and curtain wall/storefront systems highlighted by the signature Rooftop Fin structure. 4880 Great America Parkway Santa Clara, CA This 170,760 SF project consists of a 5-story structural steel. The exterior skin of the building primarily features GFRC, metal panel, and curtain wall/storefront systems highlighted by the signature Rooftop Fin structure. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture Sobrato Construction Corp None Completed 2015 Corporate BACK TO PROJECTS

  • Legal Group Offices

    This 150,000 SF 5-story tenant improvement project consists of attorney offices, conference center, cafeteria and auditorium. Building includes approximately 500 offices and conference rooms, most with glass walls, as well as an ipé wood pedestal deck and a glass enclosed dining patio. The high-end conference center features high-tech amenities including video conferencing and integrated control systems. Legal Group Offices Sunnyvale, CA This 150,000 SF 5-story tenant improvement project consists of attorney offices, conference center, cafeteria and auditorium. Building includes approximately 500 offices and conference rooms, most with glass walls, as well as an ipé wood pedestal deck and a glass enclosed dining patio. The high-end conference center features high-tech amenities including video conferencing and integrated control systems. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture Confidential None Completed 2012 Corporate Tenant Improvements BACK TO PROJECTS

bottom of page