top of page
Devcon Home

Search Results

Search this site

397 results found with an empty search

  • Perkins Coie - 3150 Porter

    This 36,000 SF remodel of a 2-story law office consists of private offices, break rooms, high density storage, law library, a multi-purpose conferencing center with capabilities to combine the conference rooms into a single open space via moving glass walls; and an internally lit glass feature wall as a reception backdrop extending from the first floor through the second floor lobby, which was converted to a two story space as part of the scope of work. Perkins Coie - 3150 Porter Palo Alto, CA This 36,000 SF remodel of a 2-story law office consists of private offices, break rooms, high density storage, law library, a multi-purpose conferencing center with capabilities to combine the conference rooms into a single open space via moving glass walls; and an internally lit glass feature wall as a reception backdrop extending from the first floor through the second floor lobby, which was converted to a two story space as part of the scope of work. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture Perkins Coie None Completed 2010 Corporate Tenant Improvement BACK TO PROJECTS

  • SCU Leavey School of Business

    This 85,000 design/build consists of a three-story building and the build-out will include a mix of 100 faculty offices, 20,000 SF of open office, full coffee bar/café, (8) classrooms, (2) seminar spaces and one large dividable (100) seat seminar space. The Leavey School of Business was designed by Devcon Architecture and built by Devcon Construction. The construction team collaborated with the design team which included design build MEPs to develop the design of the structure. The construction team was active in reviewing and commenting on details to ensure that all details were coordinated and constructible. At key milestones of document development (including 100% design drawings, 50% construction drawings and 100% construction drawings) the construction team prepared budgets to ensure that the design was within the budget constraints established by our client. Value engineering was regularly introduced to maintain control of costs and provide the client with high quality construction at the most reasonable cost. Prior to bidding the project Devcon Construction developed bid documents to thoroughly identify the required scopes of work for all trades. These scope statements were then packaged with the construction documents (including plans, specifications, soils reports) were then issued to 3 bidders for each scope of work. Each of the firms allowed to bid the project previously successfully completed projects of similar size and complexity with Devcon Construction. These firm have demonstrated high quality workmanship and sound financial condition. SCU Leavey School of Business Santa Clara, CA This 85,000 design/build consists of a three-story building and the build-out will include a mix of 100 faculty offices, 20,000 SF of open office, full coffee bar/café, (8) classrooms, (2) seminar spaces and one large dividable (100) seat seminar space. The Leavey School of Business was designed by Devcon Architecture and built by Devcon Construction. The construction team collaborated with the design team which included design build MEPs to develop the design of the structure. The construction team was active in reviewing and commenting on details to ensure that all details were coordinated and constructible. At key milestones of document development (including 100% design drawings, 50% construction drawings and 100% construction drawings) the construction team prepared budgets to ensure that the design was within the budget constraints established by our client. Value engineering was regularly introduced to maintain control of costs and provide the client with high quality construction at the most reasonable cost. Prior to bidding the project Devcon Construction developed bid documents to thoroughly identify the required scopes of work for all trades. These scope statements were then packaged with the construction documents (including plans, specifications, soils reports) were then issued to 3 bidders for each scope of work. Each of the firms allowed to bid the project previously successfully completed projects of similar size and complexity with Devcon Construction. These firm have demonstrated high quality workmanship and sound financial condition. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2008 Education Design-Build BACK TO PROJECTS

  • Oakland Air Traffic Control Tower

    This 15,000 SF federal government air traffic control tower facility consists of a 2-story administrative building with cast-in-place concrete walls and a 236 foot tall structural steel tower with pre-cast blast panels, and insulated metal panels cladding, and high strength cab glass curtain wall system. Foundations include concrete piles, grade beams, stem walls, and slabs on grade. The landscaped site includes an AOA high security fencing/operated gate system, 660 LF of vinyl sea-wall, bio-swales, gravel pavers, electrical retractable bollards, parking canopies, and concrete paving parking lot. Also included is off-site, airport underground conduit and cabling work to tie the new ATCT into the existing airport communications system. This is a federal recovery/stimulus funded project with all required ARRA reporting. The project will receive a LEED Gold rating, which includes 200KW of solar PV panels and 95% construction waste recycling. Oakland Air Traffic Control Tower Oakland, CA This 15,000 SF federal government air traffic control tower facility consists of a 2-story administrative building with cast-in-place concrete walls and a 236 foot tall structural steel tower with pre-cast blast panels, and insulated metal panels cladding, and high strength cab glass curtain wall system. Foundations include concrete piles, grade beams, stem walls, and slabs on grade. The landscaped site includes an AOA high security fencing/operated gate system, 660 LF of vinyl sea-wall, bio-swales, gravel pavers, electrical retractable bollards, parking canopies, and concrete paving parking lot. Also included is off-site, airport underground conduit and cabling work to tie the new ATCT into the existing airport communications system. This is a federal recovery/stimulus funded project with all required ARRA reporting. The project will receive a LEED Gold rating, which includes 200KW of solar PV panels and 95% construction waste recycling. Services Provided: Architect of Record: Client: News: Construction Leo A. Daly Federal Aviation Administration None https://www.oaklandairport.com/oakland-tower-goes-green-fact-sheet/ Completed 2012 Infrastructure Corporate LEED Gold BACK TO PROJECTS

  • 3333 Scott Boulevard

    Project consists of three new 4-story structures totaling approximately 460,000 SF of warm shell and mixed-use core commercial space. Skin includes a combination of precast/thinshell, metal paneling/cladding, and curtainwall/storefront systems. Phase 1 of project features new sitework, layout, including a reclaimed water irrigation system, and new colored concrete and planting throughout. Building ‘A‘ consists of a lobby build out, a full service cafeteria and gym. 3333 Scott Boulevard Santa Clara, CA Project consists of three new 4-story structures totaling approximately 460,000 SF of warm shell and mixed-use core commercial space. Skin includes a combination of precast/thinshell, metal paneling/cladding, and curtainwall/storefront systems. Phase 1 of project features new sitework, layout, including a reclaimed water irrigation system, and new colored concrete and planting throughout. Building ‘A‘ consists of a lobby build out, a full service cafeteria and gym. Services Provided: Architect of Record: Client: News: Construction RMW Architecture & Interiors Menlo Equities None Completed 2014 Corporate LEED Silver BACK TO PROJECTS

  • Lawson Lane East Garage

    Project consists of 270,376 SF design/build long-span, 5-story concrete parking garage to house approximately 880 vehicles. This project is a LEED Gold Award winner. Lawson Lane East Garage Santa Clara, CA Project consists of 270,376 SF design/build long-span, 5-story concrete parking garage to house approximately 880 vehicles. This project is a LEED Gold Award winner. Services Provided: Architect of Record: Client: News: Design, Construction International Parking Design The Sobrato Organization None Completed 2013 Parking Structure Sustainable LEED Gold BACK TO PROJECTS

  • Tannery Arts Center - Colligan Theater

    This 10,000 SF project consists of the renovation of an existing historical building. The existing building, which was once a leather hide manufacturer, is renovated into a performing arts theater. Project features 177 fixed theater seats will a full size raised theater stage. Additions to the existing building include a full size ticket booth, restroom accommodations, lobby and concessions stand. For the artists there is a new green room, full backstage accommodations and a state of the art control booth. The historical building’s exterior is architecturally finished to match the surrounding buildings of the Tannery Center. Tannery Arts Center - Colligan Theater Santa Cruz, CA This 10,000 SF project consists of the renovation of an existing historical building. The existing building, which was once a leather hide manufacturer, is renovated into a performing arts theater. Project features 177 fixed theater seats will a full size raised theater stage. Additions to the existing building include a full size ticket booth, restroom accommodations, lobby and concessions stand. For the artists there is a new green room, full backstage accommodations and a state of the art control booth. The historical building’s exterior is architecturally finished to match the surrounding buildings of the Tannery Center. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Tannery Arts Center Board None Completed 2015 Performing Arts Center Design-Build Historical BACK TO PROJECTS

  • San Jose Sharks Locker Room

    Project consists of lobby and entrance foyer renovation to the San Jose Sharks’ locker room at the HP Pavilion. Renovations included high-end maple paneling, matching doors, corridor renovation and lighting upgrades. San Jose Sharks Locker Room San Jose, CA Project consists of lobby and entrance foyer renovation to the San Jose Sharks’ locker room at the HP Pavilion. Renovations included high-end maple paneling, matching doors, corridor renovation and lighting upgrades. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Sharks Ice LLC None Completed 2016 Athletic Center Design-Build Tenant Improvement BACK TO PROJECTS

  • 240 Hamilton

    This project consist of a 14,931 SF four-story, mixed-use building located in downtown Palo Alto. The project features retail on the ground floor, commercial office spaces on 2nd and 3rd floors and two residential apartments on the 4th floor. Project includes vehicle stacking system in garage with car turntable which allows vehicles to exit forward onto Ramona Avenue. The building structure consists of reinforced concrete frame and suspended slabs over mat slab foundation. The exterior skin is a combination of glass curtain wall, storefront, mechanically fastened stone and composite aluminum panel system. 240 Hamilton Palo Alto, CA This project consist of a 14,931 SF four-story, mixed-use building located in downtown Palo Alto. The project features retail on the ground floor, commercial office spaces on 2nd and 3rd floors and two residential apartments on the 4th floor. Project includes vehicle stacking system in garage with car turntable which allows vehicles to exit forward onto Ramona Avenue. The building structure consists of reinforced concrete frame and suspended slabs over mat slab foundation. The exterior skin is a combination of glass curtain wall, storefront, mechanically fastened stone and composite aluminum panel system. Services Provided: Architect of Record: Client: News: Construction The Hayes Group Hamilton Real, LLC None Completed 2016 Corporate Retail Residential BACK TO PROJECTS

  • Berkeley Commons

    This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Berkeley Commons Berkeley, CA This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Services Provided: Architect of Record: Client: News: Construction Gensler Lane Partners None Completed 2024 Commercial LEED Gold BACK TO PROJECTS

  • Kleiner Perkins

    This 21,000 SF tenant improvement features architecturally intricate design within two buildings, along with extensive structural improvements to allow for raised fabric ceilings and the addition of a 32’x10’ skylight. Architecturally, the project consists of open work environments with custom lighting fixtures, new breakroom areas and restroom cores, along with a combination of millwork, specialty metal and glass for private offices and conference rooms. Kleiner Perkins Menlo Park, CA This 21,000 SF tenant improvement features architecturally intricate design within two buildings, along with extensive structural improvements to allow for raised fabric ceilings and the addition of a 32’x10’ skylight. Architecturally, the project consists of open work environments with custom lighting fixtures, new breakroom areas and restroom cores, along with a combination of millwork, specialty metal and glass for private offices and conference rooms. Services Provided: Architect of Record: Client: News: Construction Tim Murphy Design Associates Kleiner, Perkins, Caufield & Byers None Completed 2017 Corporate Tenant Improvement BACK TO PROJECTS

  • Channel Park Condos

    202,000 SF seven-story post tension concrete structure with 100 condominium units with interior parking. Exterior consists of limestone plaster, curtainwall and casement windows. Interior construction for this high-end Mission Bay condominium complex includes European cabinetry and fixtures, hardwood and marble floors, and granite counters. Third floor features an exterior courtyard with surrounding landscaping. Channel Park Condos San Francisco, CA 202,000 SF seven-story post tension concrete structure with 100 condominium units with interior parking. Exterior consists of limestone plaster, curtainwall and casement windows. Interior construction for this high-end Mission Bay condominium complex includes European cabinetry and fixtures, hardwood and marble floors, and granite counters. Third floor features an exterior courtyard with surrounding landscaping. Services Provided: Architect of Record: Client: News: Construction MVE Partners Signature Properties/The Riding Group None Completed 2004 Residential BACK TO PROJECTS

  • 488 Almaden Garage

    Project consists of one 440,017 SF 11-story parking garage with 3 levels below grade. The garage can accommodate up to 1,100 parked cars with opportunities for electric vehicle charging. It benefits the adjacent office building of 488 which is a 17-story high rise located in the heart of downtown San Jose. Located close to the intersection of 87 and 280, the site offers both easy vehicular access from all major freeways and well-integrated public transportation options. 488 Almaden Garage San Jose, CA Project consists of one 440,017 SF 11-story parking garage with 3 levels below grade. The garage can accommodate up to 1,100 parked cars with opportunities for electric vehicle charging. It benefits the adjacent office building of 488 which is a 17-story high rise located in the heart of downtown San Jose. Located close to the intersection of 87 and 280, the site offers both easy vehicular access from all major freeways and well-integrated public transportation options. Services Provided: Architect of Record: Client: News: Construction Korth Sunseri Hagey Architects Sobrato Development None Completed 2003 Parking Structure BACK TO PROJECTS

bottom of page