top of page
Devcon_Logo_wTaglines.png

Search Results

383 results found with an empty search

  • Rosewood Hotel & Spa

    This 175,000 SF 5-star hotel features a 16,000 SF spa facility, 18 guest buildings scattered throughout the site, including a presidential suite building and four villa buildings which will be for sale buildings. Project also consists of a restaurant, bar, meeting room, ballroom, library and pre-function areas. Rosewood Hotel & Spa Menlo Park, CA This 175,000 SF 5-star hotel features a 16,000 SF spa facility, 18 guest buildings scattered throughout the site, including a presidential suite building and four villa buildings which will be for sale buildings. Project also consists of a restaurant, bar, meeting room, ballroom, library and pre-function areas. Services Provided: Architect of Record: Client: News: Construction Hill Glazier Studio, BAMO Stanford Management Company None https://www.rosewoodhotels.com/en/sand-hill-menlo-park/media/press/2020/us-news-and-world-report Completed 2009 Hotel / Resort BACK TO PROJECTS

  • Santana West

    13-acre commercial development in San Jose adjacent to Santana Row. Project consists of demolition to existing theaters, with construction of a 376,000 SF, 8-story concrete office building over two levels of underground parking, approximately 136,000 SF. This core and shell office space also includes curtains walls, metal panels and structural glazing. Santana West San Jose, CA 13-acre commercial development in San Jose adjacent to Santana Row. Project consists of demolition to existing theaters, with construction of a 376,000 SF, 8-story concrete office building over two levels of underground parking, approximately 136,000 SF. This core and shell office space also includes curtains walls, metal panels and structural glazing. Services Provided: Architect of Record: Client: News: Construction Studios Architecture Federal Realty Investment Trust None https://api.ibeamsystems.com/?session=U2FudGFuYVdlc3Q6U2FuSm9zZUNB Completed 2022 Corporate Self-Perform BACK TO PROJECTS

  • Cupertino Tech Campus

    This 317,000 SF project consists of a 77,000 SF state of the art 2-story above ground building, and a 4-level parking garage with 3-levels below grade; the parking garage provides 600 vehicle spaces. The building is a concrete structure with perimeter full height glass, raised access flooring, lobby with feature stair case and stone walls, and a 200 seat theater in addition to the tenant improvements. Tenant improvements consists of high end finishes and rooms such as briefing centers, pods, labs, Alpi Veneer paneling, custom wood ceilings, custom fabric ceilings and custom 12’ high acoustical storefront system. Cupertino Tech Campus Cupertino, CA This 317,000 SF project consists of a 77,000 SF state of the art 2-story above ground building, and a 4-level parking garage with 3-levels below grade; the parking garage provides 600 vehicle spaces. The building is a concrete structure with perimeter full height glass, raised access flooring, lobby with feature stair case and stone walls, and a 200 seat theater in addition to the tenant improvements. Tenant improvements consists of high end finishes and rooms such as briefing centers, pods, labs, Alpi Veneer paneling, custom wood ceilings, custom fabric ceilings and custom 12’ high acoustical storefront system. Services Provided: Architect of Record: Client: News: Construction Foster and Partners, HNA Pacific and The Hayes Group Confidential None Completed 2020 Corporate Tenant Improvement BACK TO PROJECTS

  • Slide Mountain

    8,000 SF design/build 2-story Class A office building featuring CMU structure building with EIFS exterior finish and concrete tile roof. Slide Mountain Reno, NV 8,000 SF design/build 2-story Class A office building featuring CMU structure building with EIFS exterior finish and concrete tile roof. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Slide Mountain Properties, LLC None Completed 2020 Corporate Design-Build Northern Nevada NAIOP Summit Award Winner BACK TO PROJECTS

  • Harker Event Center

    This project construction consists of a 33,000 SF one-story basement gymnasium, as well as a 50,000 SF two-story state-of-the-art basement theater. The gym portion of the project includes training, dance, team locker rooms and therapy rooms with cold/hot plunge pools and an underwater treadmill. The 60’ high theater building includes large 33’x16’ LED lobby video wall and amenities include a 400 seat full production theater, vocal training rooms, orchestra rooms and a scene shop. The project also features a rooftop with full array of solar panels. Harker Event Center San Jose, CA This project construction consists of a 33,000 SF one-story basement gymnasium, as well as a 50,000 SF two-story state-of-the-art basement theater. The gym portion of the project includes training, dance, team locker rooms and therapy rooms with cold/hot plunge pools and an underwater treadmill. The 60’ high theater building includes large 33’x16’ LED lobby video wall and amenities include a 400 seat full production theater, vocal training rooms, orchestra rooms and a scene shop. The project also features a rooftop with full array of solar panels. Services Provided: Architect of Record: Client: News: Construction Studio Bondy Architects The Harker School None Completed 2018 Education Gym & Theater BACK TO PROJECTS

  • Vionic Tenant Improvement

    17,100 SF tenant improvement project featuring new corporate offices for shoe retailer, Vionic. The project includes demolition to the existing space, as well as tenant improvements consisting of new partition construction, finishes, addition of new unisex restroom, new lighting, furniture and audiovisual technology throughout. The project also includes associated mechanical, electrical and plumbing work, as well as display casework and shelving for client sales. Vionic Tenant Improvement Novato, CA 17,100 SF tenant improvement project featuring new corporate offices for shoe retailer, Vionic. The project includes demolition to the existing space, as well as tenant improvements consisting of new partition construction, finishes, addition of new unisex restroom, new lighting, furniture and audiovisual technology throughout. The project also includes associated mechanical, electrical and plumbing work, as well as display casework and shelving for client sales. Services Provided: Architect of Record: Client: News: Construction Arcturis KW Hamilton Landing, LLC None Completed 2024 Tenant Improvement BACK TO PROJECTS

  • Adobe North

    1,300,000 SF project consisting of an 18-story CIP concrete tower featuring a 12-story office building, 2-story below grade parking, 6-levels above grade parking, sitework and tenant improvements. The project consists of a pedestrian bridge approximately 6,000 SF over West San Fernando, connecting the new structure to the existing campus. The garage and office façade are comprised of metal panel, curtain wall and structural glazing. The interior features a multi-story all hands assembly space, customer experience center, full electric café, and flexible workspace on the work floors. The all hands area seats 300 people with custom AV wall, theatrical lighting and features 2-story vertical decorative fins for acoustics. 60,000 SF of space is dedicated to café area which includes of a coffee bar, sushi bar, diner, south Indian bar, east Indian bar, Italian station and other multiple stations; there is also a coworking bar that provides a specialty beverage station for employees to gather. The 18th executive floor features secure spaces for executives’ safety and a customer experience center with food service, dining and special AV graphics display areas; there is also custom lighting and artwork integrated in this space. All office floors have one breakroom with wood cladded interconnecting stairs and multiple appliances to service the entire floor. Each office floor also consists of specialty spaces for employee interaction game rooms, selfie rooms, meditation, and other functions. All conference rooms feature extensive audio visual capabilities throughout. The first level includes a main lobby, Adobe experience center (museum), juice bar and a full production kitchen. A custom DXD display in the main lobby of Level 7 & Level 8, as well as the executive center on the 18th floor, provides tailored graphics. The project will receive a LEED GOLD rating. Adobe North San Jose, CA 1,300,000 SF project consisting of an 18-story CIP concrete tower featuring a 12-story office building, 2-story below grade parking, 6-levels above grade parking, sitework and tenant improvements. The project consists of a pedestrian bridge approximately 6,000 SF over West San Fernando, connecting the new structure to the existing campus. The garage and office façade are comprised of metal panel, curtain wall and structural glazing. The interior features a multi-story all hands assembly space, customer experience center, full electric café, and flexible workspace on the work floors. The all hands area seats 300 people with custom AV wall, theatrical lighting and features 2-story vertical decorative fins for acoustics. 60,000 SF of space is dedicated to café area which includes of a coffee bar, sushi bar, diner, south Indian bar, east Indian bar, Italian station and other multiple stations; there is also a coworking bar that provides a specialty beverage station for employees to gather. The 18th executive floor features secure spaces for executives’ safety and a customer experience center with food service, dining and special AV graphics display areas; there is also custom lighting and artwork integrated in this space. All office floors have one breakroom with wood cladded interconnecting stairs and multiple appliances to service the entire floor. Each office floor also consists of specialty spaces for employee interaction game rooms, selfie rooms, meditation, and other functions. All conference rooms feature extensive audio visual capabilities throughout. The first level includes a main lobby, Adobe experience center (museum), juice bar and a full production kitchen. A custom DXD display in the main lobby of Level 7 & Level 8, as well as the executive center on the 18th floor, provides tailored graphics. The project will receive a LEED GOLD rating. Services Provided: Architect of Record: Client: News: Construction Gensler Adobe Systems Inc. None https://www.cpexecutive.com/post/adobe-breaks-ground-on-its-north-tower-in-san-jose/#:~:text=The%20North%20Tower%20development%20will,opportunity%20zone%20at%20333%20W. https://www.bizjournals.com/sanjose/news/2020/09/15/structures-architecture-gensler.html Completed 2022 Corporate Tenant Improvement LEED Gold BACK TO PROJECTS

  • Walden West Science & Sustainability Center

    Devcon provided design and construction services for a new 3,600 SF science classroom building for education and demonstration of sustainable practices. The building and its related site work is phase 1 of the 5 phased master plans. The building will be both the new gateway to the campus and a teaching tool utilizing sustainable materials and means of construction while demonstrating their functions within the building. The design features include 12 foot wide by 10 foot high operable window walls, clerestory windows, skylights, stone veneer and board and batten siding. The roof accommodates photo voltaic solar cells for electrical power generation and vacuum tube solar hot water heating capabilities that also assist the radiant floor heating and cooling system. Walden West Science & Sustainability Center Saratoga, CA Devcon provided design and construction services for a new 3,600 SF science classroom building for education and demonstration of sustainable practices. The building and its related site work is phase 1 of the 5 phased master plans. The building will be both the new gateway to the campus and a teaching tool utilizing sustainable materials and means of construction while demonstrating their functions within the building. The design features include 12 foot wide by 10 foot high operable window walls, clerestory windows, skylights, stone veneer and board and batten siding. The roof accommodates photo voltaic solar cells for electrical power generation and vacuum tube solar hot water heating capabilities that also assist the radiant floor heating and cooling system. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara County Office of Education None Completed 2011 Education Design-Build LEED Gold BACK TO PROJECTS

  • The Anderson Collection

    This project includes the construction of a new 30,000 SF art museum located adjacent to the existing Cantor Arts Center. The two-story building displays 121 modern and contemporary works of art by 86 artists, which are donated to Stanford by the Anderson family. The Anderson Collection Stanford, CA This project includes the construction of a new 30,000 SF art museum located adjacent to the existing Cantor Arts Center. The two-story building displays 121 modern and contemporary works of art by 86 artists, which are donated to Stanford by the Anderson family. Services Provided: Architect of Record: Client: News: Construction Ennead Architects Stanford University None https://www.architectmagazine.com/project-gallery/anderson-collection_o https://www.architecturalrecord.com/articles/7526-anderson-collection-at-stanford-university https://architizer.com/projects/anderson-collection-at-stanford-university/ Completed 2014 Museum / Gallery Education BACK TO PROJECTS

  • San Jose Civic Center Garage

    Project consisting of one-level of below-grade parking, accommodating 650 vehicles. This parking garage services the San Jose Civic Center which houses the local San Jose government officials as well as general downtown San Jose parking. San Jose Civic Center Garage San Jose, CA Project consisting of one-level of below-grade parking, accommodating 650 vehicles. This parking garage services the San Jose Civic Center which houses the local San Jose government officials as well as general downtown San Jose parking. Services Provided: Architect of Record: Client: News: Construction Richard Meier and Partners City of San Jose None Completed 2005 Parking Structure BACK TO PROJECTS

  • Borland International Campus

    650,000 SF structural steel three and four story module buildings with basements requiring poured-in-place concrete walls up to 38' tall. The building skirts consisted of GFRC panels poured-in-place concrete walls and glass wall systems. Project also included the decontamination of six acre site requiring cleaning of 60,000 cubic yards of soil with excavation to 45' deep. Responsible for the sitework, shell and tenant improvements. Borland International Campus Scotts Valley, CA 650,000 SF structural steel three and four story module buildings with basements requiring poured-in-place concrete walls up to 38' tall. The building skirts consisted of GFRC panels poured-in-place concrete walls and glass wall systems. Project also included the decontamination of six acre site requiring cleaning of 60,000 cubic yards of soil with excavation to 45' deep. Responsible for the sitework, shell and tenant improvements. Services Provided: Architect of Record: Client: News: Construction DES Borland International None Completed 1994 Corporate BACK TO PROJECTS

  • 675 Almanor

    Project consists of demolition to one existing building and new construction of a 4-story Class A commercial office building approximately 149,998 SF, with retail on the first floor. The project also consists of a 5-story concrete parking structure at 112,261 SF, providing 371 parking stalls. The exterior features a rooftop terrace, outside patio and a workout area/gym within the project landscaping. 675 Almanor Sunnyvale, CA Project consists of demolition to one existing building and new construction of a 4-story Class A commercial office building approximately 149,998 SF, with retail on the first floor. The project also consists of a 5-story concrete parking structure at 112,261 SF, providing 371 parking stalls. The exterior features a rooftop terrace, outside patio and a workout area/gym within the project landscaping. Services Provided: Architect of Record: Client: News: Construction Chang Architecture Dollinger Properties None Completed 2020 Corporate LEED Gold Retail BACK TO PROJECTS

bottom of page