top of page

Search Results

363 items found for ""

  • Napa Logistics Building 3

    Napa Logistics Building 3 American Canyon, CA 201,839 SF project consisting of a concrete tilt-up shell building with 188,433 SF designated as warehouse, 6,867 SF assembly and 6,539 SF office tenant improvement. The building includes 8” reinforced SOG with dowel baskets at all control joints, concrete tilt-up panels with a 40’ clear height to bottom of truss, loading docks, ESFR fire system, panelized roof system, as well as TPO roofing, dock levelers, overhead doors including high speed and coiling, two 30,000 SF steel canopies for material loading, and infrastructure for (300+) future van distribution EV charging stations. The site is approximately 58 acres and includes grading and paving, along with underground utilities and tie-ins to existing utilities, bioswales and landscaping. Services Provided: Architect of Record: Client: News: Construction Ware Malcomb Architects Napa Logistics None In Progress Corporate Tenant Imrovement ​ BACK TO PROJECTS

  • Tasman Campus Building 1

    Tasman Campus Building 1 San Jose, CA 3-story tenant improvement, MEP upgrade and exterior remodel within a 144,000 SF building, featuring a new 1st floor servery with back of house food prep areas and stadium style bench seating. Project consists of 1st floor automotive lab space including acoustical chambers and specialty bench labs. Upper floors feature full interior remodel of open office, central core support areas and restrooms, and complete replacement of HVAC infrastructure to support new building design requirements. The exterior scope consists of refresh and refinish of existing Exterior Insulation Finish System (EIFS) and code mandated ADA upgrades. Services Provided: Architect of Record: Client: News: Construction Form4Architecture Confidential None Completed 2022 Tenant Improvement Corporate ​ BACK TO PROJECTS

  • Lawson Lane West Garage

    Lawson Lane West Garage Santa Clara, CA Project consisting of an expansion of the existing 8-level design/build precast-hybrid parking garage with two levels below grade and six levels above grade totaling 124,664 SF. Project also features related site work. Services Provided: Architect of Record: Client: News: Construction Not available The Sobrato Organization None Completed 2022 Parking Corporate Design-Build BACK TO PROJECTS

bottom of page