- Campo di Bocce Livermore
This project consists of a 14,000 SF commercial building designed to compliment the adjacent Ruby Hill Commercial project. Included design features are weathered metal roofing, “green” ICF insulated foam walls overlayed with distressed lath and plaster finish, weathered barn doors and stone veneer. Project also consists of heavy timber trusses, exposed utilities, fully conditioned, four indoor courts and four outdoor courts, full service commercial kitchen to accommodate the court-side bocce diners, bar and private dining. Campo di Bocce Livermore Livermore, CA This project consists of a 14,000 SF commercial building designed to compliment the adjacent Ruby Hill Commercial project. Included design features are weathered metal roofing, “green” ICF insulated foam walls overlayed with distressed lath and plaster finish, weathered barn doors and stone veneer. Project also consists of heavy timber trusses, exposed utilities, fully conditioned, four indoor courts and four outdoor courts, full service commercial kitchen to accommodate the court-side bocce diners, bar and private dining. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Campo di Bocce None Completed 2006 Athletic Center Retail BACK TO PROJECTS
- Franklin Templeton Investments Data Center
This 25,000 SF warm shell build out includes a new data center and support rooms in an existing tilt-up concrete shell and site work. Devcon used BIM to 3D model the Data Center and Chiller Plant before construction began. Franklin Templeton Investments Data Center Stockton, CA This 25,000 SF warm shell build out includes a new data center and support rooms in an existing tilt-up concrete shell and site work. Devcon used BIM to 3D model the Data Center and Chiller Plant before construction began. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Franklin Templeton Companies None Completed 2010 Data Center Design-Build LEED Silver BACK TO PROJECTS
- UOP DeRosa Center
This new 55,000 SF student center consists of an event space, dining room, kitchen and servery, book store, meeting rooms, and a pub. The two-story building, designed by Gensler, has a brick façade to tie in with the style of the campus, plus composite rubber shingles at the roof, exposed wood trusses, numerous skylights, and a curtain wall system at the center lobby area. The project includes extensive site development and landscaping. UOP DeRosa Center Stockton, CA This new 55,000 SF student center consists of an event space, dining room, kitchen and servery, book store, meeting rooms, and a pub. The two-story building, designed by Gensler, has a brick façade to tie in with the style of the campus, plus composite rubber shingles at the roof, exposed wood trusses, numerous skylights, and a curtain wall system at the center lobby area. The project includes extensive site development and landscaping. Services Provided: Architect of Record: Client: News: Construction Gensler University of the Pacific None https://www.recordnet.com/article/20110510/A_NEWS/105100317 Completed 2008 Education LEED Silver BACK TO PROJECTS
- Ingenuity Industrial Center
Design-assist project on a 40 acre commercial site consisting of three tilt-up industrial buildings at the following footprints: Building A: 419,040 SF (36’ Clear Height), Building B: 173,680 SF (32’ Clear Height), and Building C: 66,560 SF (24’ Clear Height). Scope of work features three warehouses and associated site improvements with Fire Protection, Mechanical, Plumbing, and Electrical (FPME) engineering contracted through Devcon Construction for FPME design-build delivery. Project also includes a 54,000 SF tenant improvement for a Home Depot MDO warehouse. Ingenuity Industrial Center Spanish Springs, NV Design-assist project on a 40 acre commercial site consisting of three tilt-up industrial buildings at the following footprints: Building A: 419,040 SF (36’ Clear Height), Building B: 173,680 SF (32’ Clear Height), and Building C: 66,560 SF (24’ Clear Height). Scope of work features three warehouses and associated site improvements with Fire Protection, Mechanical, Plumbing, and Electrical (FPME) engineering contracted through Devcon Construction for FPME design-build delivery. Project also includes a 54,000 SF tenant improvement for a Home Depot MDO warehouse. Services Provided: Architect of Record: Client: News: Design, Construction Tectonics Design Group Avenue 55 None Completed 2021 Corporate Design-Assist BACK TO PROJECTS
- 1700 Dell
Project consisting of 170,000 SF, 4-story Class A commercial office building. The project also features a 160,000 SF 5-story above grade with 1-story below grade parking structure to house 503 vehicles. 1700 Dell Campbell, CA Project consisting of 170,000 SF, 4-story Class A commercial office building. The project also features a 160,000 SF 5-story above grade with 1-story below grade parking structure to house 503 vehicles. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Dollinger Dell Associates None Completed 2024 Corporate Design-Build BACK TO PROJECTS
- Coleman Highline
This project consists of design/build core and shell office development utilizing steel systems and a unitized curtain wall system. Project consists of one 5-story office building approximately 166,000 SF and one 6-story office building approximately 198,000 SF. The buildings are connected at the third floor by a pedestrian bridge called the “Highline” walkway. Coleman Highline San Jose, CA This project consists of design/build core and shell office development utilizing steel systems and a unitized curtain wall system. Project consists of one 5-story office building approximately 166,000 SF and one 6-story office building approximately 198,000 SF. The buildings are connected at the third floor by a pedestrian bridge called the “Highline” walkway. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Hunter Properties, Inc. None https://www.bizjournals.com/sanjose/news/2019/07/24/verizon-coleman-highline-development-san-jose.html Completed 2021 Corporate Design-Build BACK TO PROJECTS
- SGI Crittenden Offsite Improvements
Crittenden Pump Station and Inlet Piping Project: Construction of a storm water pump station and its associated inlet piping. The pump station project consists of a reinforced concrete wet-well, a reinforced masonry building containing three (3) major pumps, two (2) minor pumps, electrical and mechanical works, a detention pond and all discharge piping. The inlet piping project consists of installing 2,000 feet of HDPE pipe. Crittenden Off Site Design Management: Devcon Construction acted as the managing consultant for all off-site design for the Crittenden off-site projects including Crittenden Pump Station, Crittenden Inlet Piping, Crittenden Lane / North Road Improvement Project, and Crittenden Landfill Landscaping Project. Using architectural and engineering consultants, Devcon established a design team for each project and acted as the managing agent in the design process between the consultants, developer, City of Mountain View and other government agencies. Crittenden Lane/North Road Improvement Project: The North Road project includes the construction of a new raised roadway with concrete curbs, underground utilities, fiber-optic conduit bank and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting, and fiber-optic system. North Access Road And Crittenden Lane Improvement Project: This project includes the construction of a new raised roadway with concrete curbs, underground utilities and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting and a joint utility trench. SGI/City Of Mountain View Offsite Work: This project along North Charleston Road and Amphitheatre Parkway includes meandering walks, parking lot landscaping and underground work. SGI Crittenden Offsite Improvements Mountain View, CA Crittenden Pump Station and Inlet Piping Project: Construction of a storm water pump station and its associated inlet piping. The pump station project consists of a reinforced concrete wet-well, a reinforced masonry building containing three (3) major pumps, two (2) minor pumps, electrical and mechanical works, a detention pond and all discharge piping. The inlet piping project consists of installing 2,000 feet of HDPE pipe. Crittenden Off Site Design Management: Devcon Construction acted as the managing consultant for all off-site design for the Crittenden off-site projects including Crittenden Pump Station, Crittenden Inlet Piping, Crittenden Lane / North Road Improvement Project, and Crittenden Landfill Landscaping Project. Using architectural and engineering consultants, Devcon established a design team for each project and acted as the managing agent in the design process between the consultants, developer, City of Mountain View and other government agencies. Crittenden Lane/North Road Improvement Project: The North Road project includes the construction of a new raised roadway with concrete curbs, underground utilities, fiber-optic conduit bank and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting, and fiber-optic system. North Access Road And Crittenden Lane Improvement Project: This project includes the construction of a new raised roadway with concrete curbs, underground utilities and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting and a joint utility trench. SGI/City Of Mountain View Offsite Work: This project along North Charleston Road and Amphitheatre Parkway includes meandering walks, parking lot landscaping and underground work. Services Provided: Architect of Record: Client: News: Construction Silicon Graphics, Inc. None Completed 2001 Infrastructure BACK TO PROJECTS
- Audience Inc.
This project consists of a 88,000 SF tenant improvement on three floors for the new corporate headquarters of Audience, Inc. The project features open offices, executive offices, collaborative break areas, audio labs, listening rooms, a corporate board room and all hands space. The project utilizes vibrant colors and textures to provide an open and lively work environment. Innovative products such as polished concrete floors, interlam wall panels, Maharam digital film and Pulp Studios glass were used in creating the effect. Audience Inc. Mountain View, CA This project consists of a 88,000 SF tenant improvement on three floors for the new corporate headquarters of Audience, Inc. The project features open offices, executive offices, collaborative break areas, audio labs, listening rooms, a corporate board room and all hands space. The project utilizes vibrant colors and textures to provide an open and lively work environment. Innovative products such as polished concrete floors, interlam wall panels, Maharam digital film and Pulp Studios glass were used in creating the effect. Services Provided: Architect of Record: Client: News: Construction AECOM Kilroy Realty Corp. None Completed 2013 Corporate Tenant Improvement LEED Gold BACK TO PROJECTS
- Silver Springs Networks
This 150,000 SF tenant improvement featureslab spaces, a network operation control room, data server room, RF chambers, as well as two floors of Class A office space, full service kitchen and activated outdoor space. Silver Springs Networks San Jose, CA This 150,000 SF tenant improvement featureslab spaces, a network operation control room, data server room, RF chambers, as well as two floors of Class A office space, full service kitchen and activated outdoor space. Services Provided: Architect of Record: Client: News: Construction AP+I Design, Inc. Silver Springs Networks, Inc. None Completed 2016 Corporate Tenant Improvement BACK TO PROJECTS
- Harker Event Center
This project construction consists of a 33,000 SF one-story basement gymnasium, as well as a 50,000 SF two-story state-of-the-art basement theater. The gym portion of the project includes training, dance, team locker rooms and therapy rooms with cold/hot plunge pools and an underwater treadmill. The 60’ high theater building includes large 33’x16’ LED lobby video wall and amenities include a 400 seat full production theater, vocal training rooms, orchestra rooms and a scene shop. The project also features a rooftop with full array of solar panels. Harker Event Center San Jose, CA This project construction consists of a 33,000 SF one-story basement gymnasium, as well as a 50,000 SF two-story state-of-the-art basement theater. The gym portion of the project includes training, dance, team locker rooms and therapy rooms with cold/hot plunge pools and an underwater treadmill. The 60’ high theater building includes large 33’x16’ LED lobby video wall and amenities include a 400 seat full production theater, vocal training rooms, orchestra rooms and a scene shop. The project also features a rooftop with full array of solar panels. Services Provided: Architect of Record: Client: News: Construction Studio Bondy Architects The Harker School None Completed 2018 Education Gym & Theater BACK TO PROJECTS
- Cisco Executive Briefing Center
The Cisco corporate headquarters Executive Briefing Center project includes selective demolition of 32,000 SF to provide new finishes throughout including interactive audio visual systems and large meeting facility. Occupied by Cisco Executives. Project is considered to be fast track and is based on an eight week schedule. Cisco Executive Briefing Center San Jose, CA The Cisco corporate headquarters Executive Briefing Center project includes selective demolition of 32,000 SF to provide new finishes throughout including interactive audio visual systems and large meeting facility. Occupied by Cisco Executives. Project is considered to be fast track and is based on an eight week schedule. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Cisco Systems, Inc. None Completed 2003 Corporate Tenant Improvement Design-Build BACK TO PROJECTS
- Elco Yards
Demolition of four city blocks to construct four new buildings with below grade parking and a restaurant plaza. The project development includes 715,000 SF of life science space consisting of one 4-story CIP concrete building over 2-level below grade parking and two 4-story CIP concrete buildings over a common 2-level garage. One 4-story steel building over 3-level below grade parking provides 260,000 SF of commercial space with a childcare facility. The site includes a 5,000 SF wood/steel framed restaurant and plaza. The building facades are composed of brick on precast panels, glass, and metal panels and include pavilion and terrace architectural features. The project site scope includes six blocks of public infrastructure improvements, two pedestrian bridges, and site amenities. Elco Yards Redwood City, CA Demolition of four city blocks to construct four new buildings with below grade parking and a restaurant plaza. The project development includes 715,000 SF of life science space consisting of one 4-story CIP concrete building over 2-level below grade parking and two 4-story CIP concrete buildings over a common 2-level garage. One 4-story steel building over 3-level below grade parking provides 260,000 SF of commercial space with a childcare facility. The site includes a 5,000 SF wood/steel framed restaurant and plaza. The building facades are composed of brick on precast panels, glass, and metal panels and include pavilion and terrace architectural features. The project site scope includes six blocks of public infrastructure improvements, two pedestrian bridges, and site amenities. Services Provided: Architect of Record: Client: News: Construction WRNS Studio IQHQ Elco Yards None In Progress Retail Life Science LEED Silver BACK TO PROJECTS