top of page
Devcon Home

Search Results

Search this site

397 results found with an empty search

  • St. Francis Burns Family Pavilion

    This two phase 53,500 SF project consists of the demolition of an antiquated gym, construction of a new gym, and renovation of an existing gym with construction scheduled to provide the client with uninterrupted use of at least one facility. The new construction includes a 28,500 SF basketball and volleyball gym with retractable grandstand seating, scoreboard, state of the art audio/visual system, concessions, main lobby, locker rooms complete with restrooms, showers and over 500 student lockers. The project also features a 6,500 SF fitness and weight room on the second floor with a high impact medicine ball wall, astroturf, cardio and weight machines, trainer’s offices and facilities to include hydrotherapy rooms. The renovation of the existing gym consists of seismic and Code upgrades as well as an addition of a 2,000 SF dance and yoga studio, video production studio, radio studio, varsity team rooms complete with showers, lockers and coaches offices, and a 2,000 square foot athletic department addition. St. Francis Burns Family Pavilion Mountain View, CA This two phase 53,500 SF project consists of the demolition of an antiquated gym, construction of a new gym, and renovation of an existing gym with construction scheduled to provide the client with uninterrupted use of at least one facility. The new construction includes a 28,500 SF basketball and volleyball gym with retractable grandstand seating, scoreboard, state of the art audio/visual system, concessions, main lobby, locker rooms complete with restrooms, showers and over 500 student lockers. The project also features a 6,500 SF fitness and weight room on the second floor with a high impact medicine ball wall, astroturf, cardio and weight machines, trainer’s offices and facilities to include hydrotherapy rooms. The renovation of the existing gym consists of seismic and Code upgrades as well as an addition of a 2,000 SF dance and yoga studio, video production studio, radio studio, varsity team rooms complete with showers, lockers and coaches offices, and a 2,000 square foot athletic department addition. Services Provided: Architect of Record: Client: News: Construction HMC Architects St. Francis High School None Completed 2015 Education Athletic Center BACK TO PROJECTS

  • French Gourmet Frozen Dough

    This 45,000 SF design/build tenant improvement for a new frozen dough manufacturing facility features cooler boxes, refrigeration equipment, production area, and office space. This is a two phase project, where cooler boxes and office areas have been turned over and the production area including production line and refrigeration equipment is currently being coordinated with vendors from across the country in America, Italy and France. French Gourmet Frozen Dough Sparks, NV This 45,000 SF design/build tenant improvement for a new frozen dough manufacturing facility features cooler boxes, refrigeration equipment, production area, and office space. This is a two phase project, where cooler boxes and office areas have been turned over and the production area including production line and refrigeration equipment is currently being coordinated with vendors from across the country in America, Italy and France. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc PN Holding None Completed 2012 Industrial Center Design-Build BACK TO PROJECTS

  • SCU Admissions

    This project includes the construction of a new 25,000 SF, 2-story steel-framed building that serves as the new home for undergraduate admissions, university financial services, the bursar, and the registrar. Project features a grand entryway to welcome prospective students and their families, a large presentation room that holds approximately 100 visitors, (9) private meeting rooms, approximately 60 administrative offices and a one stop shop to support current students. The building uniquely combines a California mission style with the latest sustainable design. SCU Admissions Santa Clara, CA This project includes the construction of a new 25,000 SF, 2-story steel-framed building that serves as the new home for undergraduate admissions, university financial services, the bursar, and the registrar. Project features a grand entryway to welcome prospective students and their families, a large presentation room that holds approximately 100 visitors, (9) private meeting rooms, approximately 60 administrative offices and a one stop shop to support current students. The building uniquely combines a California mission style with the latest sustainable design. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2012 Education Design-Build LEED Gold BACK TO PROJECTS

  • David Rumsey Map Center

    This project features a 4,000 SF remodel of existing space within the Cecil Green Library for use as a special collections reading room. New space includes high end millwork finishes, extensive AV features, as well as rework of existing mechanical and electrical systems. Project also features new floor to ceiling wall art displays in the entirety of the 3-story stairwell. Devcon worked closely with both Stanford and David Rumsey to achieve a collaborative display space. David Rumsey Map Center Stanford, CA This project features a 4,000 SF remodel of existing space within the Cecil Green Library for use as a special collections reading room. New space includes high end millwork finishes, extensive AV features, as well as rework of existing mechanical and electrical systems. Project also features new floor to ceiling wall art displays in the entirety of the 3-story stairwell. Devcon worked closely with both Stanford and David Rumsey to achieve a collaborative display space. Services Provided: Architect of Record: Client: News: Construction Noll & Tam Architects Stanford University None Completed 2015 Education Tenant Improvement BACK TO PROJECTS

  • Villa Siena Nursing Care Units

    This 14,074 SF wood frame construction consists of an expansion, and a full retrofit of the existing skilled nursing facility at Villa Siena. The new facility holds 22 bedrooms (with 30 total residents) and is built in three phases with adjacent phases being fully operational during construction. This is an OSHPD-2 jurisdiction project. Villa Siena Nursing Care Units Mountain View, CA This 14,074 SF wood frame construction consists of an expansion, and a full retrofit of the existing skilled nursing facility at Villa Siena. The new facility holds 22 bedrooms (with 30 total residents) and is built in three phases with adjacent phases being fully operational during construction. This is an OSHPD-2 jurisdiction project. Services Provided: Architect of Record: Client: News: Construction Barker Associates Daughters of Charity Health System None Completed 2014 Residential BACK TO PROJECTS

  • Raley's

    This project includes a 75,000 SF upgraded supermarket located at the McQueen Crossing shopping center. Exterior of building is constructed with brick, stone, plaster, and wood shingle siding in the "cottage" architectural vernacular. Interior tenant improvements consisted of over 20 different flooring types/patterns and complicated curtainwall soffits at the ceiling level. Raley's Reno, NV This project includes a 75,000 SF upgraded supermarket located at the McQueen Crossing shopping center. Exterior of building is constructed with brick, stone, plaster, and wood shingle siding in the "cottage" architectural vernacular. Interior tenant improvements consisted of over 20 different flooring types/patterns and complicated curtainwall soffits at the ceiling level. Services Provided: Architect of Record: Client: News: Construction HMR Architects, Inc. McQueen Crossings LLC None Completed 2004 Retail Tenant Improvements BACK TO PROJECTS

  • Mentor Graphics

    This project consists of a 120,000 SF Interior renovation with computer room, large presentation/training facility, cafeteria. Mentor Graphics San Jose, CA This project consists of a 120,000 SF Interior renovation with computer room, large presentation/training facility, cafeteria. Services Provided: Architect of Record: Client: News: Construction NA Mentor Graphics None Completed 2011 Corporate Tenant Improvement BACK TO PROJECTS

  • Firehouse Square Apartments

    Project consisting of demolition to a vacant firehouse building with the historic façade retained and incorporated into the exterior design of the apartment complex. The project features 96,835 SF construction of one 4-story wood framed (Type V-A) multifamily rental development consisting of 66 units over a single level below-grade concrete parking garage housing 47 vehicles. The residential community includes 18 studios, 12 one-bedroom units, 19 two-bedroom units, and 17 three-bedroom units. The project also includes a lobby, laundry room, community room, two property management offices, a resident services office within an extra amenity space programmed for adult classes, and an afterschool space for youth ages five to twelve years old. Finally, the development features an outdoor playground and approximately 458 SF of publicly accessible open space. Firehouse Square Apartments Belmont, CA Project consisting of demolition to a vacant firehouse building with the historic façade retained and incorporated into the exterior design of the apartment complex. The project features 96,835 SF construction of one 4-story wood framed (Type V-A) multifamily rental development consisting of 66 units over a single level below-grade concrete parking garage housing 47 vehicles. The residential community includes 18 studios, 12 one-bedroom units, 19 two-bedroom units, and 17 three-bedroom units. The project also includes a lobby, laundry room, community room, two property management offices, a resident services office within an extra amenity space programmed for adult classes, and an afterschool space for youth ages five to twelve years old. Finally, the development features an outdoor playground and approximately 458 SF of publicly accessible open space. Services Provided: Architect of Record: Client: News: Construction BDE Architecture MidPen Housing Corp. None Completed 2022 Residential BACK TO PROJECTS

  • Thermo-Fisher

    This design/build tenant improvement project consists of a 90,000 SF interior conversion of an existing 185,000 SF concrete tilt-up into a plastics manufacturing facility. Project included an overhead rack distribution system, new customized electrical, mechanical, process piping, and condensed dry air systems to support the thermoplastic injection equipment, and storage housed in 65,000 SF of the one-story space. Special facilities include a tool room, a grinding room, and an outside chiller plant, and two large silos to feed raw materials to the machines. Since the tanks were erected on special concrete pads on the gradient of the loading dock incline, a new and catwalk with safety rail was built to accommodate the change in elevation. The remaining 25,000 SF of office space includes a large break room with an exterior patio, a small break room, large conference areas and perimeter offices. One conference room includes a sliding partition and built-in video projection and audio equipment. Thermo-Fisher Petaluma, CA This design/build tenant improvement project consists of a 90,000 SF interior conversion of an existing 185,000 SF concrete tilt-up into a plastics manufacturing facility. Project included an overhead rack distribution system, new customized electrical, mechanical, process piping, and condensed dry air systems to support the thermoplastic injection equipment, and storage housed in 65,000 SF of the one-story space. Special facilities include a tool room, a grinding room, and an outside chiller plant, and two large silos to feed raw materials to the machines. Since the tanks were erected on special concrete pads on the gradient of the loading dock incline, a new and catwalk with safety rail was built to accommodate the change in elevation. The remaining 25,000 SF of office space includes a large break room with an exterior patio, a small break room, large conference areas and perimeter offices. One conference room includes a sliding partition and built-in video projection and audio equipment. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Thermo-Fisher None Completed 2010 Industrial Center Tenant Improvement Design-Build BACK TO PROJECTS

  • Cisco Executive Briefing Center

    The Cisco corporate headquarters Executive Briefing Center project includes selective demolition of 32,000 SF to provide new finishes throughout including interactive audio visual systems and large meeting facility. Occupied by Cisco Executives. Project is considered to be fast track and is based on an eight week schedule. Cisco Executive Briefing Center San Jose, CA The Cisco corporate headquarters Executive Briefing Center project includes selective demolition of 32,000 SF to provide new finishes throughout including interactive audio visual systems and large meeting facility. Occupied by Cisco Executives. Project is considered to be fast track and is based on an eight week schedule. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Cisco Systems, Inc. None Completed 2003 Corporate Tenant Improvement Design-Build BACK TO PROJECTS

  • 400 Main

    This 31,000 SF mixed-use project includes the construction of a building with provisions for up to two restaurants, six retail tenants on the first floor, and Class A offices on the second floor. The exterior of the building features a combination of limestone veneer and plaster, with stone finish cornice and corbels at the top of parapets. Project includes two full height curtain wall towers with stone veneer, cornice and copper shingle roofs, as well as cornice. Project also consists of a large sidewalk area and central courtyard for substantial public space, and outdoor dining with a stone clad fountain center piece. 400 Main Los Altos, CA This 31,000 SF mixed-use project includes the construction of a building with provisions for up to two restaurants, six retail tenants on the first floor, and Class A offices on the second floor. The exterior of the building features a combination of limestone veneer and plaster, with stone finish cornice and corbels at the top of parapets. Project includes two full height curtain wall towers with stone veneer, cornice and copper shingle roofs, as well as cornice. Project also consists of a large sidewalk area and central courtyard for substantial public space, and outdoor dining with a stone clad fountain center piece. Services Provided: Architect of Record: Client: News: Construction DES Architects + Engineers 400 Main St. LLC None Completed 2014 Retail Corporate Restaurants BACK TO PROJECTS

  • San Francisco 49ers Training Facility

    Two-story 50,000 SF main building (training facility and administration offices) with separate maintenance/ racquetball building, and related sitework including three practice fields. San Francisco 49ers Training Facility Santa Clara, CA Two-story 50,000 SF main building (training facility and administration offices) with separate maintenance/ racquetball building, and related sitework including three practice fields. Services Provided: Architect of Record: Client: News: Construction H.O.K. Sports Division SF 49ers None Completed 1987 Athletic Center BACK TO PROJECTS

bottom of page