- SGI Crittenden
500,000 SF campus project consisting of four (4) four-story steel framed buildings. Exterior building features include curtain wall, corrugated metal panels, Alpolic flat metal panels and brick. Interior construction features include hard wall offices and lab space. SGI Crittenden Mountain View, CA 500,000 SF campus project consisting of four (4) four-story steel framed buildings. Exterior building features include curtain wall, corrugated metal panels, Alpolic flat metal panels and brick. Interior construction features include hard wall offices and lab space. Services Provided: Architect of Record: Client: News: Construction Studios Architects Silicon Graphics, Inc. None Completed 2001 Corporate BACK TO PROJECTS
- Palo Alto Networks Building 3
This 376,000 SF project consists of interior tenant improvements to an existing 8-story building for Palo Alto Networks. The project features office space, training rooms, a full service kitchen, two catering kitchens and a coffee bar. Palo Alto Networks Building 3 Santa Clara, CA This 376,000 SF project consists of interior tenant improvements to an existing 8-story building for Palo Alto Networks. The project features office space, training rooms, a full service kitchen, two catering kitchens and a coffee bar. Services Provided: Architect of Record: Client: News: Construction Interior Architects Palo Alto Networks None Completed 2019 Corporate Tenant Improvement BACK TO PROJECTS
- St. Ignatius Kitchen
3,400 SF remodel of existing main dining hall kitchen and adjacent faculty dining room. Project includes demolition of the entire kitchen space and rebuilding it. An accelerated schedule completed project in 12 weeks during the school's summer break. St. Ignatius Kitchen San Francisco, CA 3,400 SF remodel of existing main dining hall kitchen and adjacent faculty dining room. Project includes demolition of the entire kitchen space and rebuilding it. An accelerated schedule completed project in 12 weeks during the school's summer break. Services Provided: Architect of Record: Client: News: Construction Korth Sunseri Hagey Architects St. Ignatius College Preparatory None Completed 2008 Education BACK TO PROJECTS
- 180 East 3rd
Project consisting of a new 29,685 SF office and retail building development on a 7,038 SF lot. The project features three stories above grade and one story below grade (double height ceiling with atrium) and an occupiable roof deck overlooking downtown San Mateo. The building facade is composed of brick, GRFC, stucco, metal panels and a Level 1 & 2 storefront system with expressed frames. 180 East 3rd San Mateo, CA Project consisting of a new 29,685 SF office and retail building development on a 7,038 SF lot. The project features three stories above grade and one story below grade (double height ceiling with atrium) and an occupiable roof deck overlooking downtown San Mateo. The building facade is composed of brick, GRFC, stucco, metal panels and a Level 1 & 2 storefront system with expressed frames. Services Provided: Architect of Record: Client: News: Construction ArcTec Lane Partners None Completed 2023 Retail Corporate BACK TO PROJECTS
- Caribbean Creative Campus
This iconic build-to-suit project consists of two new steel framed, stepped buildings totaling 1,000,000 SF. The buildings feature sloping green roofs that provide walking access and exterior site amenities at each floor. A new four level pre-cast concrete parking structure at the northwest corner of the site provides 1,440 stalls, and extensive landscaping with enhanced flood protection levees and pedestrian bridges activates the balance of the site. Interior improvements include open office space, conference rooms, food service, and fitness areas. Caribbean Creative Campus Sunnyvale, CA This iconic build-to-suit project consists of two new steel framed, stepped buildings totaling 1,000,000 SF. The buildings feature sloping green roofs that provide walking access and exterior site amenities at each floor. A new four level pre-cast concrete parking structure at the northwest corner of the site provides 1,440 stalls, and extensive landscaping with enhanced flood protection levees and pedestrian bridges activates the balance of the site. Interior improvements include open office space, conference rooms, food service, and fitness areas. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. with BIG Architects Confidential None In Progress Corporate Design-Build LEED Certified BACK TO PROJECTS
- Accel Partners
This 23,000 SF tenant improvement project within a 3-story building consists of high-end finishes, extensive recessed AV with mostly all specialty ceilings. Project also features roof finishes and usage. Accel Partners Palo Alto, CA This 23,000 SF tenant improvement project within a 3-story building consists of high-end finishes, extensive recessed AV with mostly all specialty ceilings. Project also features roof finishes and usage. Services Provided: Architect of Record: Client: News: Construction TMDA Accel Partners None Completed 2020 Corporate Tenant Improvement BACK TO PROJECTS
- Mountain View Campus Cafe
This project includes an 8,500 SF Café with authentic Japanese design elements, such as private dining rooms with recessed floors and shoji screen doors, tatami mat seating areas, and fabric wall panels. Other high-end finishes include stone tile floors, hand-painted wall tiles, wood slat ceilings, custom banquettes, and numerous other custom wood elements. Exterior improvements feature an updated patio area with built-in wood benches, a new fountain, cedar perimeter fence, and new Japanese gate structures. The Café was built inside an occupied building and completed successfully on an extremely tight seven week schedule, requiring double- and triple-shifts for the full duration. Mountain View Campus Cafe Mountain View, CA This project includes an 8,500 SF Café with authentic Japanese design elements, such as private dining rooms with recessed floors and shoji screen doors, tatami mat seating areas, and fabric wall panels. Other high-end finishes include stone tile floors, hand-painted wall tiles, wood slat ceilings, custom banquettes, and numerous other custom wood elements. Exterior improvements feature an updated patio area with built-in wood benches, a new fountain, cedar perimeter fence, and new Japanese gate structures. The Café was built inside an occupied building and completed successfully on an extremely tight seven week schedule, requiring double- and triple-shifts for the full duration. Services Provided: Architect of Record: Client: News: Construction BOORA Architects Confidential None Completed 2011 Corporate Tenant Improvement BACK TO PROJECTS
- Adobe Headquarters
This project consists of one twenty story 399,282 SF office building with six levels of parking; two levels below grade and four levels above grade, comprising 377,213 SF. The project also features a seventeen story 335,001 SF office building with seven levels of parking; two levels below grade and five levels above grade, comprising 372,916 SF. These building are steel frame structures with granite and precast exterior. The project contract includes shell, core and interior improvements. Adobe Headquarters San Jose, CA This project consists of one twenty story 399,282 SF office building with six levels of parking; two levels below grade and four levels above grade, comprising 377,213 SF. The project also features a seventeen story 335,001 SF office building with seven levels of parking; two levels below grade and five levels above grade, comprising 372,916 SF. These building are steel frame structures with granite and precast exterior. The project contract includes shell, core and interior improvements. Services Provided: Architect of Record: Client: News: Construction HOK Architects Adobe Systems, Inc. None Completed 1998 Corporate Tenant Improvement BACK TO PROJECTS
- Intuitive Surgical
This 160,000 SF two-story tilt-up concrete building is complete with full site and tenant improvements to house the Intuitive Surgical Headquarters and surgical training facility. Intuitive Surgical Sunnyvale, CA This 160,000 SF two-story tilt-up concrete building is complete with full site and tenant improvements to house the Intuitive Surgical Headquarters and surgical training facility. Services Provided: Architect of Record: Client: News: Construction ArcTec, Inc. Intuitive Surgical, Inc. None Completed 2013 Corporate Tenant Improvement BACK TO PROJECTS
- Paypal Park
This project consists of the development of a 14.5 acre site to accommodate an 18,000 seat Major League Soccer stadium with a 24,000 SF team office building. The stadium consists of 16 luxury suites, a press box, and concession stands. It features a steel structure with aluminum decking, CMU concourse buildings, metal panels, metal screening and a partial canopy. The office building, which is a steel structure with glass, metal panel and CMU skin, consists of office space, team lockers and showers, coach and referee facilities, ticketing office, and physical therapy/training areas. The Epicenter Fan Zone covers two acres and includes a sustainable stadium garden. Green features also include 882 solar panels in the VIP parking lot, reclaimed redwood from Moffett Field’s famed Hangar One to panel the press box, as well as 90% of recycled steel. This project boasts the largest outdoor bar in North America, under the scoreboard. Paypal Park San Jose, CA This project consists of the development of a 14.5 acre site to accommodate an 18,000 seat Major League Soccer stadium with a 24,000 SF team office building. The stadium consists of 16 luxury suites, a press box, and concession stands. It features a steel structure with aluminum decking, CMU concourse buildings, metal panels, metal screening and a partial canopy. The office building, which is a steel structure with glass, metal panel and CMU skin, consists of office space, team lockers and showers, coach and referee facilities, ticketing office, and physical therapy/training areas. The Epicenter Fan Zone covers two acres and includes a sustainable stadium garden. Green features also include 882 solar panels in the VIP parking lot, reclaimed redwood from Moffett Field’s famed Hangar One to panel the press box, as well as 90% of recycled steel. This project boasts the largest outdoor bar in North America, under the scoreboard. Services Provided: Architect of Record: Client: News: Construction HOK Architecture Earthquakes Stadium LLC None https://www.architectmagazine.com/project-gallery/avaya-stadium-6472 Completed 2014 Athletic Center San Jose Earthquakes Production Innovation Award BACK TO PROJECTS
- Community Foundation Santa Cruz
10,000 SF project consisting of office space and community meeting rooms. Building is concrete. Community Foundation Santa Cruz Aptos, CA 10,000 SF project consisting of office space and community meeting rooms. Building is concrete. Services Provided: Architect of Record: Client: News: Construction Mark Cavagnero Associates Community Foundation Santa Cruz County None https://www.architectmagazine.com/awards/annual-design-review/community-foundation-santa-cruz-county_o https://www.architectmagazine.com/project-gallery/community-foundation-santa-cruz-county https://www.cfscc.org/the-foundation/our-building Completed 2010 Corporate LEED Gold BACK TO PROJECTS
- De La Salle High School Athletic Field - Phase 1
Project consisting of new dugouts and bullpens, artificial turf replacement, new drainage at the baseball and lacrosse field, as well as new perimeter fencing and netting. De La Salle High School Athletic Field - Phase 1 Concord, CA Project consisting of new dugouts and bullpens, artificial turf replacement, new drainage at the baseball and lacrosse field, as well as new perimeter fencing and netting. Services Provided: Architect of Record: Client: News: Construction Ratcliff (Principal/CEO) De La Salle High School None Completed 2025 Athletic Center BACK TO PROJECTS