  • Akamai Floors 3 & 4

    This project consists of a 78,000 SF tenant improvement of two floors in a new cold-shell building. The project includes high-end customer areas, executive offices, board room with foldable partition walls, multiple employee collaboration areas, and open office seating. The high-end customer area is particularly unique as it includes a fully-integrated Network Operations Control Center with a video wall consisting of 27 high-resolution monitors, a large break room with custom millwork, and conference rooms connected by an operable roll-down servery. MEP coordination was also an important factor in this project, as the architectural design includes a significant amount of open ceiling areas & diagonal soffit details. Akamai Floors 3 & 4 Santa Clara, CA This project consists of a 78,000 SF tenant improvement of two floors in a new cold-shell building. The project includes high-end customer areas, executive offices, board room with foldable partition walls, multiple employee collaboration areas, and open office seating. The high-end customer area is particularly unique as it includes a fully-integrated Network Operations Control Center with a video wall consisting of 27 high-resolution monitors, a large break room with custom millwork, and conference rooms connected by an operable roll-down servery. MEP coordination was also an important factor in this project, as the architectural design includes a significant amount of open ceiling areas & diagonal soffit details. Services Provided: Architect of Record: Client: News: Construction Gensler FaciliCorp None Completed 2014 Corporate Tenant Improvement BACK TO PROJECTS

  • SCU Softball Field

    Project features a complete demolition of the field, landscaping, and fencing in order to reorient the field in a South to North manor, allowing for an expanded spectator area and future buildings. Project includes an impressive Division 1 Softball complex complete with landscape & irrigation, backstop with protection netting, fenced dugouts, and large flood lights for night games. Project featuring new concrete pathways throughout the softball complex. Landscaping is also included on the perimeter of the softball complex to beautify the area for students, pedestrians, and fans. Project featuring a set of stadium style bleachers complete with 200 spacious folding seats, cup holders, ADA accessible spaces, low voltage wiring for a future scoreboard in center field, a backup generator for emergency lighting, and red fines for the future bullpens. Project also includes landscaping, underground utilities, life safety, domestic water lines, sanitary sewer, storm drain, electrical conduit, fire water lines and planning for what Santa Clara University envisions for the Softball Complex in the coming years. New Softball stadium and facility for SCU Softball Team. Includes new batting cage, grandstands, concession stand and pressbox. SCU Softball Field Santa Clara, CA Project features a complete demolition of the field, landscaping, and fencing in order to reorient the field in a South to North manor, allowing for an expanded spectator area and future buildings. Project includes an impressive Division 1 Softball complex complete with landscape & irrigation, backstop with protection netting, fenced dugouts, and large flood lights for night games. Project featuring new concrete pathways throughout the softball complex. Landscaping is also included on the perimeter of the softball complex to beautify the area for students, pedestrians, and fans. Project featuring a set of stadium style bleachers complete with 200 spacious folding seats, cup holders, ADA accessible spaces, low voltage wiring for a future scoreboard in center field, a backup generator for emergency lighting, and red fines for the future bullpens. Project also includes landscaping, underground utilities, life safety, domestic water lines, sanitary sewer, storm drain, electrical conduit, fire water lines and planning for what Santa Clara University envisions for the Softball Complex in the coming years. New Softball stadium and facility for SCU Softball Team. Includes new batting cage, grandstands, concession stand and pressbox. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2016 Education Athletic Center Design-Build BACK TO PROJECTS

  • Castro Station

    This 49,000 SF 3-story office building consists of steel structure above a 103,000 SF, three level below grade poured-in-place concrete parking structure. Shoring is a beam and lagging with tie back system, and excavation includes contaminated soil and contaminated ground water. The building is a warm shell and includes sitework and infrastructure improvements. Project features glass and aluminum window assemblies, curtain wall assemblies, corrugated metal panels, plaster over metal stud, and a standing seam metal roof. Castro Station Mountain View, CA This 49,000 SF 3-story office building consists of steel structure above a 103,000 SF, three level below grade poured-in-place concrete parking structure. Shoring is a beam and lagging with tie back system, and excavation includes contaminated soil and contaminated ground water. The building is a warm shell and includes sitework and infrastructure improvements. Project features glass and aluminum window assemblies, curtain wall assemblies, corrugated metal panels, plaster over metal stud, and a standing seam metal roof. Services Provided: Architect of Record: Client: News: Construction Chang Architecture, Inc. SFF Castro Station, LLC None Completed 2014 Corporate LEED Gold BACK TO PROJECTS

  • Marin City

    110,000 SF retail complex consisting of (7) wood framed and concrete tilt-up buildings with associated tenant improvements. This project included new streets, curbs, gutters and joint trench work. Marin City Marin City, CA 110,000 SF retail complex consisting of (7) wood framed and concrete tilt-up buildings with associated tenant improvements. This project included new streets, curbs, gutters and joint trench work. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc The Martin Group (TMG) None Completed 1995 Retail Infrastructure BACK TO PROJECTS

  • Sage Point 7

    Prologis Sage Point 7 is a 531,881 SF, 36’ clear height concrete tilt-up warm, dark shell warehouse on 48.34 acres with full site improvements. GameStop, a Fortune 500 company and leading specialty retailer offering games and entertainment products through its E-commerce leasing the warehouse to expand their business and fulfilment capacity in the West Coast. Interior space will be fully built out for GameStop with State-of-the-art technology for the modern distribution needs. Overall project will adhere to the Prologis LEED Volume Program. Sage Point 7 Reno, NV Prologis Sage Point 7 is a 531,881 SF, 36’ clear height concrete tilt-up warm, dark shell warehouse on 48.34 acres with full site improvements. GameStop, a Fortune 500 company and leading specialty retailer offering games and entertainment products through its E-commerce leasing the warehouse to expand their business and fulfilment capacity in the West Coast. Interior space will be fully built out for GameStop with State-of-the-art technology for the modern distribution needs. Overall project will adhere to the Prologis LEED Volume Program. Services Provided: Architect of Record: Client: News: Construction HPA Architects Prologis, LP None Completed 2023 Commercial Instrustrial Prologis LEED Volume BACK TO PROJECTS

  • SGI Crittenden Offsite Improvements

    Crittenden Pump Station and Inlet Piping Project: Construction of a storm water pump station and its associated inlet piping. The pump station project consists of a reinforced concrete wet-well, a reinforced masonry building containing three (3) major pumps, two (2) minor pumps, electrical and mechanical works, a detention pond and all discharge piping. The inlet piping project consists of installing 2,000 feet of HDPE pipe. Crittenden Off Site Design Management: Devcon Construction acted as the managing consultant for all off-site design for the Crittenden off-site projects including Crittenden Pump Station, Crittenden Inlet Piping, Crittenden Lane / North Road Improvement Project, and Crittenden Landfill Landscaping Project. Using architectural and engineering consultants, Devcon established a design team for each project and acted as the managing agent in the design process between the consultants, developer, City of Mountain View and other government agencies. Crittenden Lane/North Road Improvement Project: The North Road project includes the construction of a new raised roadway with concrete curbs, underground utilities, fiber-optic conduit bank and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting, and fiber-optic system. North Access Road And Crittenden Lane Improvement Project: This project includes the construction of a new raised roadway with concrete curbs, underground utilities and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting and a joint utility trench. SGI/City Of Mountain View Offsite Work: This project along North Charleston Road and Amphitheatre Parkway includes meandering walks, parking lot landscaping and underground work. SGI Crittenden Offsite Improvements Mountain View, CA Crittenden Pump Station and Inlet Piping Project: Construction of a storm water pump station and its associated inlet piping. The pump station project consists of a reinforced concrete wet-well, a reinforced masonry building containing three (3) major pumps, two (2) minor pumps, electrical and mechanical works, a detention pond and all discharge piping. The inlet piping project consists of installing 2,000 feet of HDPE pipe. Crittenden Off Site Design Management: Devcon Construction acted as the managing consultant for all off-site design for the Crittenden off-site projects including Crittenden Pump Station, Crittenden Inlet Piping, Crittenden Lane / North Road Improvement Project, and Crittenden Landfill Landscaping Project. Using architectural and engineering consultants, Devcon established a design team for each project and acted as the managing agent in the design process between the consultants, developer, City of Mountain View and other government agencies. Crittenden Lane/North Road Improvement Project: The North Road project includes the construction of a new raised roadway with concrete curbs, underground utilities, fiber-optic conduit bank and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting, and fiber-optic system. North Access Road And Crittenden Lane Improvement Project: This project includes the construction of a new raised roadway with concrete curbs, underground utilities and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting and a joint utility trench. SGI/City Of Mountain View Offsite Work: This project along North Charleston Road and Amphitheatre Parkway includes meandering walks, parking lot landscaping and underground work. Services Provided: Architect of Record: Client: News: Construction Silicon Graphics, Inc. None Completed 2001 Infrastructure BACK TO PROJECTS

  • Classic Residence by Hyatt - La Jolla

    This project includes the construction of an independent living facility totaling 765,000 SF. Project features a new 400,000 SF 20-story reinforced concrete tower, a 3-level underground parking structure that is tied into the existing underground parking structure and a one story, 10,000 SF structural steel connector building. Project consists of 184 customized senior living units ranging from 1,500 SF to 3,000 SF and includes over 365,000 SF of sitework and renovation of public areas in the existing 20-story tower. The new tower and connector building also include multiple dining venues; a new indoor pool with locker rooms, exercise rooms and hair salon; conservatory; reading, computer and billiards rooms; and a grand living room. The site was renovated to incorporate a central circular driveway with walking paths, arbors and landscaped terraces. Classic Residence by Hyatt - La Jolla San Diego, CA This project includes the construction of an independent living facility totaling 765,000 SF. Project features a new 400,000 SF 20-story reinforced concrete tower, a 3-level underground parking structure that is tied into the existing underground parking structure and a one story, 10,000 SF structural steel connector building. Project consists of 184 customized senior living units ranging from 1,500 SF to 3,000 SF and includes over 365,000 SF of sitework and renovation of public areas in the existing 20-story tower. The new tower and connector building also include multiple dining venues; a new indoor pool with locker rooms, exercise rooms and hair salon; conservatory; reading, computer and billiards rooms; and a grand living room. The site was renovated to incorporate a central circular driveway with walking paths, arbors and landscaped terraces. Services Provided: Architect of Record: Client: News: Construction Confidential Confidential None Completed 2008 Hotel / Resort Residential BACK TO PROJECTS

  • Champion Station

    This 192,000 SF design/build project on a 10.9 acre site consists of two 2-story buildings of an eight building campus. Exterior façade upgrades include new roof, window mullion and wall colors, new entry doors, free standing steel, as well as wood architectural accent elements. Site work consists of site accessibility, hard scape and landscaping upgrades including new amenities such as employee BBQ and sport courts. Tenant improvement modifications include finish upgrades, ADA upgrades, and new conference rooms. Champion Station San Jose, CA This 192,000 SF design/build project on a 10.9 acre site consists of two 2-story buildings of an eight building campus. Exterior façade upgrades include new roof, window mullion and wall colors, new entry doors, free standing steel, as well as wood architectural accent elements. Site work consists of site accessibility, hard scape and landscaping upgrades including new amenities such as employee BBQ and sport courts. Tenant improvement modifications include finish upgrades, ADA upgrades, and new conference rooms. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. TMG Partners None Completed 2014 Corporate Design-Build Tenant Improvement BACK TO PROJECTS

  • Akamai Floor 2

    This project is a 34,000 SF tenant improvement of the second floor of a warm-shell building. This project includes a high end break room with views of the building atrium lobby and a game room with a custom pool table. The remainder of the project includes open offices, flex spaces with sliding doors and several large conference rooms. Seating areas include open ceilings and a sound-masking system throughout. Akamai Floor 2 Santa Clara, CA This project is a 34,000 SF tenant improvement of the second floor of a warm-shell building. This project includes a high end break room with views of the building atrium lobby and a game room with a custom pool table. The remainder of the project includes open offices, flex spaces with sliding doors and several large conference rooms. Seating areas include open ceilings and a sound-masking system throughout. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. FaciliCorp None Completed 2015 Corporate Tenant Improvement Design-Build BACK TO PROJECTS

  • Justine Pereira | Devcon

    Previous Justine Pereira Vice President “I feel very proud to work for a solid company over the last few decades that has built its reputation on designing and constructing quality projects,” says Justine Pereira, Vice President. “Its amazing how many projects Devcon has built throughout Silicon Valley since my inception here at Devcon.” Pereira joined Devcon in 1984 as a Project Assistant. Over the years and numerous construction projects, Justine has worked her way up through the ranks of Executive Assistant to the President, Gary Filizetti, and currently as a Vice President. Since 2007, Pereira has also been an Officer of the Corporation serving as the Corporate Secretary. In addition to managing and training the administrative staff, she also oversees marketing, advertising and event planning for the company. Next

  • Albright Campus

    This project features a 22-acre site featuring a campus consisting of two new 3-story warm shells and two 4-story warm shells totaling 525,000 SF. The project also includes one new parking structure to accommodate 955 stalls with a bridge spanning between two of the office buildings. The skin features metal panels, glass and GFRC, while the site includes new paved parking areas and outdoor seating areas. Albright Campus Los Gatos, CA This project features a 22-acre site featuring a campus consisting of two new 3-story warm shells and two 4-story warm shells totaling 525,000 SF. The project also includes one new parking structure to accommodate 955 stalls with a bridge spanning between two of the office buildings. The skin features metal panels, glass and GFRC, while the site includes new paved parking areas and outdoor seating areas. Services Provided: Architect of Record: Client: News: Construction Form4 Architects Confidential None https://asla-ncc.org/portfolio-items/netflix-inc-albright-campus/ Completed 2016 Corporate BACK TO PROJECTS

  • Aruba Networks

    This 235,000 SF project consists of tenant improvement to five levels of the six stories at Building D, first floor of the adjacent Building C, and a Central Utility Plant. The project consists of new lab spaces, office space, collaboration spaces, executive briefing center and client experience center. The project also features a full cafeteria on the first floor of Building D. Work includes all infrastructure to connect both new tenant improvements to the Central Utility Plant located between the two new spaces. Aruba Networks Santa Clara, CA This 235,000 SF project consists of tenant improvement to five levels of the six stories at Building D, first floor of the adjacent Building C, and a Central Utility Plant. The project consists of new lab spaces, office space, collaboration spaces, executive briefing center and client experience center. The project also features a full cafeteria on the first floor of Building D. Work includes all infrastructure to connect both new tenant improvements to the Central Utility Plant located between the two new spaces. Services Provided: Architect of Record: Client: News: Construction Arctec Aruba Networks None Completed 2016 Corporate Tenant Improvement BACK TO PROJECTS