- Lenovo Building 2
This 37,500 SF design/build tenant improvement within a LEED Silver building consists of approximately 4,500 SF of modular conductive cooling data center and 32,000 SF of Class A office space. This is a fast-track project with a 12-week construction duration. Lenovo Building 2 Santa Clara, CA This 37,500 SF design/build tenant improvement within a LEED Silver building consists of approximately 4,500 SF of modular conductive cooling data center and 32,000 SF of Class A office space. This is a fast-track project with a 12-week construction duration. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Jones Lang LaSalle None Completed 2014 Tenant Improvement Design-Build LEED Silver BACK TO PROJECTS
- Campo di Bocce Livermore
This project consists of a 14,000 SF commercial building designed to compliment the adjacent Ruby Hill Commercial project. Included design features are weathered metal roofing, “green” ICF insulated foam walls overlayed with distressed lath and plaster finish, weathered barn doors and stone veneer. Project also consists of heavy timber trusses, exposed utilities, fully conditioned, four indoor courts and four outdoor courts, full service commercial kitchen to accommodate the court-side bocce diners, bar and private dining. Campo di Bocce Livermore Livermore, CA This project consists of a 14,000 SF commercial building designed to compliment the adjacent Ruby Hill Commercial project. Included design features are weathered metal roofing, “green” ICF insulated foam walls overlayed with distressed lath and plaster finish, weathered barn doors and stone veneer. Project also consists of heavy timber trusses, exposed utilities, fully conditioned, four indoor courts and four outdoor courts, full service commercial kitchen to accommodate the court-side bocce diners, bar and private dining. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Campo di Bocce None Completed 2006 Athletic Center Retail BACK TO PROJECTS
- San Antonio Village North Garage
Block 5 of the San Antonio Village North project consists of a large parking garage with 1-level below grade and eight levels above grade totaling 546,900 SF. San Antonio Village North Garage Mountain View, CA Block 5 of the San Antonio Village North project consists of a large parking garage with 1-level below grade and eight levels above grade totaling 546,900 SF. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Merlone Geier Partners None Completed 2018 Parking Structure Design-Build BACK TO PROJECTS
- Santa Cruz Warriors Arena
Construction of a 33,000 SF arena facility and modular locker, featuring training and restroom units for the D-League Santa Cruz Warriors. Structure is a Type II-B sprinkled single story sports arena with a pre-engineered tensile fabric membrane and clad metal panel siding. Seating will be comprised of both fixed and retractable seat back and bench seats. Court lighting via structure suspended Musco lighting. All sports equipment is NBA rated including courtside seating, wood flooring, scoreboards and scorer’s tables, shot clocks and portable backboards. Santa Cruz Warriors Arena Santa Cruz, CA Construction of a 33,000 SF arena facility and modular locker, featuring training and restroom units for the D-League Santa Cruz Warriors. Structure is a Type II-B sprinkled single story sports arena with a pre-engineered tensile fabric membrane and clad metal panel siding. Seating will be comprised of both fixed and retractable seat back and bench seats. Court lighting via structure suspended Musco lighting. All sports equipment is NBA rated including courtside seating, wood flooring, scoreboards and scorer’s tables, shot clocks and portable backboards. Services Provided: Architect of Record: Client: News: Construction Brown Reynolds Watford Architects Santa Cruz Warriors None Completed Athletic Center BACK TO PROJECTS
- Somersett Club Town Center
This project includes the design-build 35,544 SF of two 2-story wood framed Class A retail/office buildings with core improvements and vanilla shells to include elevators. Stucco finish with stone veneer and metal roofing. Project also includes site improvements for +/- 5 acres, site preparation for two (2) separate residential condo complexes, and a 10,000 sf plaza / courtyard between the office buildings. Buildings pending LEED Silver Certification that incorporates Green features such as waterless urinals, backbone HVAC fresh air system, solatube skylights, motion sensor lighting & bathroom fixtures, and dedicated recycling enclosures. Somersett Club Town Center Reno, NV This project includes the design-build 35,544 SF of two 2-story wood framed Class A retail/office buildings with core improvements and vanilla shells to include elevators. Stucco finish with stone veneer and metal roofing. Project also includes site improvements for +/- 5 acres, site preparation for two (2) separate residential condo complexes, and a 10,000 sf plaza / courtyard between the office buildings. Buildings pending LEED Silver Certification that incorporates Green features such as waterless urinals, backbone HVAC fresh air system, solatube skylights, motion sensor lighting & bathroom fixtures, and dedicated recycling enclosures. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Somersett Development Co. None Completed 2007 Retail Corporate Design-Build BACK TO PROJECTS
- Bellarmine Wade Academic Center
Project consisting of demolition to the existing Wade Residence Hall, with design/build construction of a new 45,000 SF, two-story academic building featuring classrooms, new utilities, sitework and landscaping. Project also includes reconfiguration of the existing parking lots, allowing improvement to site vehicular circulation. Bellarmine Wade Academic Center San Jose, CA Project consisting of demolition to the existing Wade Residence Hall, with design/build construction of a new 45,000 SF, two-story academic building featuring classrooms, new utilities, sitework and landscaping. Project also includes reconfiguration of the existing parking lots, allowing improvement to site vehicular circulation. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Bellarmine College Preparatory None https://imegcorp.com/news_events/ballarmine-college-prep-breaks-ground-on-new-academic-building/ Completed 2025 Education Design-Build BACK TO PROJECTS
- St. Francis Burns Family Pavilion
This two phase 53,500 SF project consists of the demolition of an antiquated gym, construction of a new gym, and renovation of an existing gym with construction scheduled to provide the client with uninterrupted use of at least one facility. The new construction includes a 28,500 SF basketball and volleyball gym with retractable grandstand seating, scoreboard, state of the art audio/visual system, concessions, main lobby, locker rooms complete with restrooms, showers and over 500 student lockers. The project also features a 6,500 SF fitness and weight room on the second floor with a high impact medicine ball wall, astroturf, cardio and weight machines, trainer’s offices and facilities to include hydrotherapy rooms. The renovation of the existing gym consists of seismic and Code upgrades as well as an addition of a 2,000 SF dance and yoga studio, video production studio, radio studio, varsity team rooms complete with showers, lockers and coaches offices, and a 2,000 square foot athletic department addition. St. Francis Burns Family Pavilion Mountain View, CA This two phase 53,500 SF project consists of the demolition of an antiquated gym, construction of a new gym, and renovation of an existing gym with construction scheduled to provide the client with uninterrupted use of at least one facility. The new construction includes a 28,500 SF basketball and volleyball gym with retractable grandstand seating, scoreboard, state of the art audio/visual system, concessions, main lobby, locker rooms complete with restrooms, showers and over 500 student lockers. The project also features a 6,500 SF fitness and weight room on the second floor with a high impact medicine ball wall, astroturf, cardio and weight machines, trainer’s offices and facilities to include hydrotherapy rooms. The renovation of the existing gym consists of seismic and Code upgrades as well as an addition of a 2,000 SF dance and yoga studio, video production studio, radio studio, varsity team rooms complete with showers, lockers and coaches offices, and a 2,000 square foot athletic department addition. Services Provided: Architect of Record: Client: News: Construction HMC Architects St. Francis High School None Completed 2015 Education Athletic Center BACK TO PROJECTS
- Castro Station
This 49,000 SF 3-story office building consists of steel structure above a 103,000 SF, three level below grade poured-in-place concrete parking structure. Shoring is a beam and lagging with tie back system, and excavation includes contaminated soil and contaminated ground water. The building is a warm shell and includes sitework and infrastructure improvements. Project features glass and aluminum window assemblies, curtain wall assemblies, corrugated metal panels, plaster over metal stud, and a standing seam metal roof. Castro Station Mountain View, CA This 49,000 SF 3-story office building consists of steel structure above a 103,000 SF, three level below grade poured-in-place concrete parking structure. Shoring is a beam and lagging with tie back system, and excavation includes contaminated soil and contaminated ground water. The building is a warm shell and includes sitework and infrastructure improvements. Project features glass and aluminum window assemblies, curtain wall assemblies, corrugated metal panels, plaster over metal stud, and a standing seam metal roof. Services Provided: Architect of Record: Client: News: Construction Chang Architecture, Inc. SFF Castro Station, LLC None Completed 2014 Corporate LEED Gold BACK TO PROJECTS
- Gateway Family Housing
160,716 SF project consisting of 140 residential units in a Type VA fully sprinklered building, with associated common areas and on grade parking within a 4-acre site. The building features 3-4 story wood-framed buildings comprised of 66 one-bedroom units, 50 two-bedroom units and 24 three-bedroom units; one of the two-bedroom units is reserved for an on-site manager. Parking includes 177 surface parking spaces, which consists of 15 handicap spaces and 14 EV charging spaces. Site work features new asphalt parking areas, concrete plaza areas, pathways, bioswales and plantings, and relocation of utilities within the existing frontage road. This building is designed as a 100% electric efficient building. Gateway Family Housing Menlo Park, CA 160,716 SF project consisting of 140 residential units in a Type VA fully sprinklered building, with associated common areas and on grade parking within a 4-acre site. The building features 3-4 story wood-framed buildings comprised of 66 one-bedroom units, 50 two-bedroom units and 24 three-bedroom units; one of the two-bedroom units is reserved for an on-site manager. Parking includes 177 surface parking spaces, which consists of 15 handicap spaces and 14 EV charging spaces. Site work features new asphalt parking areas, concrete plaza areas, pathways, bioswales and plantings, and relocation of utilities within the existing frontage road. This building is designed as a 100% electric efficient building. Services Provided: Architect of Record: Client: News: Construction Mithun MidPen Housing Corp. None Completed 2023 Residential 140 Units 100% Electric Efficient BACK TO PROJECTS
- 1841 Page Mill
This project consists of a complete renovation of two lobbies including interior and exterior upgrades. The exterior features new glass curtain wall entries, new roof structure and structural upgrades. The interior consists of new stairs and glass rails, updated restrooms, new shower and locker rooms, and new architectural finishes throughout. Site work includes new concrete stairs and ramp entries, site railings, and new landscaping. 1841 Page Mill Palo Alto, CA This project consists of a complete renovation of two lobbies including interior and exterior upgrades. The exterior features new glass curtain wall entries, new roof structure and structural upgrades. The interior consists of new stairs and glass rails, updated restrooms, new shower and locker rooms, and new architectural finishes throughout. Site work includes new concrete stairs and ramp entries, site railings, and new landscaping. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture The Lionstone Group None Completed 2011 Corporate Stanford Research Park BACK TO PROJECTS
- Mari Chuy's Tequileria y Botanas
This project consists of a 3022 SF TI for a local Mexican food chain including a display kitchen with a viewing area of the Al Pastor machine and tortilla making area. Stained floors with metallic epoxy agave logos throughout. Horseshoe shaped bar with back light in-wall niches for Tequila Display. Tequila retail area with personal lockers to store your tequila. Indoor/Outdoor fireplace along with Glass Overhead door for patio seating. Mari Chuy's Tequileria y Botanas Reno, NV This project consists of a 3022 SF TI for a local Mexican food chain including a display kitchen with a viewing area of the Al Pastor machine and tortilla making area. Stained floors with metallic epoxy agave logos throughout. Horseshoe shaped bar with back light in-wall niches for Tequila Display. Tequila retail area with personal lockers to store your tequila. Indoor/Outdoor fireplace along with Glass Overhead door for patio seating. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc Tolles Development Company None Completed 2021 Tenant Improvement Hospitality BACK TO PROJECTS
- Stevenson Place
This 83,000 SF multifamily rental development consists of (80) affordable housing units. The one 4-story wood framed project includes a community room, and youth program & service facilities at ground level. The common areas feature a community room, youth center, bicycle parking room, meeting rooms, computer room, and tenant storage & laundry facilities. Stevenson Place Fremont, CA This 83,000 SF multifamily rental development consists of (80) affordable housing units. The one 4-story wood framed project includes a community room, and youth program & service facilities at ground level. The common areas feature a community room, youth center, bicycle parking room, meeting rooms, computer room, and tenant storage & laundry facilities. Services Provided: Architect of Record: Client: News: Construction HCL MidPen Housing Corporation None Completed 2019 Residential BACK TO PROJECTS