Search Results
Search this site
397 results found with an empty search
- UOP Janssen Lagorio Gym
This project features a 23,000 SF construction of new multi-purpose sports and recreation facility for basketball, volleyball, and other intercollegiate sports and recreational activities. In addition to the large, high ceiling space, there will be storage spaces, restrooms and a small training room. UOP Janssen Lagorio Gym Stockton, CA This project features a 23,000 SF construction of new multi-purpose sports and recreation facility for basketball, volleyball, and other intercollegiate sports and recreational activities. In addition to the large, high ceiling space, there will be storage spaces, restrooms and a small training room. Services Provided: Architect of Record: Client: News: Construction WMB Architects University of the Pacific None Completed 2009 Education Athletic Center BACK TO PROJECTS
- D7 High-Rise Campus
Description not available. D7 High-Rise Campus San Jose, CA Description not available. Services Provided: Architect of Record: Client: News: Design, Construction 3XN Confidential None In Progress Corporate Mass Timber Design-Build BACK TO PROJECTS
- Sunday Pilates
1,274 SF TI for Pilates Studio - Wood Paneling, Custom Weight Cabinets, Boutique Retail Area Sunday Pilates Reno, NV 1,274 SF TI for Pilates Studio - Wood Paneling, Custom Weight Cabinets, Boutique Retail Area Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc Sunday Pilates None Completed 2021 Tenant Improvement Hospitality BACK TO PROJECTS
- Reno Aces Suite Level
Project 1: Demolition and refresh of Bugsy’s/The Club restaurant that overlooks the left field area from the suite level. Refresh included new flooring, removal of one bar area, addition of buffet cabinetry, bar refresh with a new tile front and updated countertops. The original ceiling in the ceiling coffers were removed and new Armstrong wood ceilings and specialized lighting was added to these areas to create the retro look the Aces were designing for. Project 2: Demolition and updating of one suite and the suite hallway with updated cabinetry, countertops, carpeting, and lighting. The remainder of the suites will be managed in the next year refresh. Project 3: Creating a steel trellis at the rightfield bar. Included structural steel installation for the main trellis structure as well as Longboard (aluminum to look like wood) installed between the structural steel members to create a wood like roofing structure. Lighting, signage, and fans were also added. Project 4: Double Play Area – Included demoing three rows of stadium seats at the medium deck of the stadium and created a multi level party zone with railing and drink rails for a party of 50 people for the Aces. Reno Aces Suite Level Reno, NV Project 1: Demolition and refresh of Bugsy’s/The Club restaurant that overlooks the left field area from the suite level. Refresh included new flooring, removal of one bar area, addition of buffet cabinetry, bar refresh with a new tile front and updated countertops. The original ceiling in the ceiling coffers were removed and new Armstrong wood ceilings and specialized lighting was added to these areas to create the retro look the Aces were designing for. Project 2: Demolition and updating of one suite and the suite hallway with updated cabinetry, countertops, carpeting, and lighting. The remainder of the suites will be managed in the next year refresh. Project 3: Creating a steel trellis at the rightfield bar. Included structural steel installation for the main trellis structure as well as Longboard (aluminum to look like wood) installed between the structural steel members to create a wood like roofing structure. Lighting, signage, and fans were also added. Project 4: Double Play Area – Included demoing three rows of stadium seats at the medium deck of the stadium and created a multi level party zone with railing and drink rails for a party of 50 people for the Aces. Services Provided: Architect of Record: Client: News: Construction 505 Design SK Baseball, LLC None Completed 2023 Tenant Improvement Sports Venue BACK TO PROJECTS
- Pear Avenue Phase II
231,210 SF project consisting of a 6-story cold shell office building featuring steel construction with brace frames, concrete decks, structural glass and curtain wall skin. Pear Avenue Phase II Mountain View, CA 231,210 SF project consisting of a 6-story cold shell office building featuring steel construction with brace frames, concrete decks, structural glass and curtain wall skin. Services Provided: Architect of Record: Client: News: Construction ArcTec The Sobrato Organization None Completed 2024 Corporate BACK TO PROJECTS
- Somersett Fire Station
This project includes a 6,100 SF design/build fire station for the City of Reno. Project features two fire truck apparatus bays and dorm room with four living quarters and other associated living amenities (kitchen, work out room, entertainment room, offices). Project also includes two acres of site improvements, 750 KW generator & fuel station. Somersett Fire Station Reno, NV This project includes a 6,100 SF design/build fire station for the City of Reno. Project features two fire truck apparatus bays and dorm room with four living quarters and other associated living amenities (kitchen, work out room, entertainment room, offices). Project also includes two acres of site improvements, 750 KW generator & fuel station. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Somersett Development Co. None Completed 2007 Fire Station Design-Build BACK TO PROJECTS
- 64 Willow
This project consists of 32,000 SF of demolition and rebuilding the project's core and shell. Project features steel and concrete structure, wood sloping roof structure, Mediterranean style architecture with smooth plaster exterior skin, wood windows, clay tile roof, building lattices, site trellis, and fountain. 64 Willow Menlo Park, CA This project consists of 32,000 SF of demolition and rebuilding the project's core and shell. Project features steel and concrete structure, wood sloping roof structure, Mediterranean style architecture with smooth plaster exterior skin, wood windows, clay tile roof, building lattices, site trellis, and fountain. Services Provided: Architect of Record: Client: News: Construction The Hayes Group Roxy Rapp & Co. None Completed 2008 Corporate BACK TO PROJECTS
- SCU Steve Schott Stadium
NCAA Division I baseball stadium comprised of ball field and approximately 20,000 SF of building space. The playing field, which measures 400 feet to center field, uses a slit-sand system for drainage. Both chair backs and bleachers are provided to accommodate 1,500 spectators. Locker rooms, showers, and a trainer's area make up both the home and visiting team locker buildings. In addition, the home team locker room features a team room equipped for live game feeds, team meetings, and press conferences. The VIP building houses both a luxury box and a press box. A concession/ticket building and a hitting center make up the last two buildings onsite. SCU Steve Schott Stadium Santa Clara, CA NCAA Division I baseball stadium comprised of ball field and approximately 20,000 SF of building space. The playing field, which measures 400 feet to center field, uses a slit-sand system for drainage. Both chair backs and bleachers are provided to accommodate 1,500 spectators. Locker rooms, showers, and a trainer's area make up both the home and visiting team locker buildings. In addition, the home team locker room features a team room equipped for live game feeds, team meetings, and press conferences. The VIP building houses both a luxury box and a press box. A concession/ticket building and a hitting center make up the last two buildings onsite. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2005 Athletic Center BACK TO PROJECTS
- NIAC Headquarters
This 26,000 SF project consists of a new office headquarters for Nonprofit Insurance Alliance of California. The project includes cembrit and parklex panel siding, lime plaster first floor exterior finish, central courtyard with a water feature, radiant slab heating and cooling system, PV solar panels, net zero design, and automated window and window covering controls. Photographs: Jesse Beer Photography NIAC Headquarters Santa Cruz, CA This 26,000 SF project consists of a new office headquarters for Nonprofit Insurance Alliance of California. The project includes cembrit and parklex panel siding, lime plaster first floor exterior finish, central courtyard with a water feature, radiant slab heating and cooling system, PV solar panels, net zero design, and automated window and window covering controls. Photographs: Jesse Beer Photography Services Provided: Architect of Record: Client: News: Construction EHDD Nonprofit Insurance Alliance of California (NIAC) None Completed 2019 Corporate BACK TO PROJECTS
- Proofpoint Buildings 9 & 10
242,000 SF tenant improvement within two 3-story office buildings featuring open office space with exposed ceilings, private offices, conference rooms, training rooms, break rooms, multi-purpose rooms, and briefing centers. Tenant improvement construction is concurrent with core/shell buildout. Proofpoint Buildings 9 & 10 Sunnyvale, CA 242,000 SF tenant improvement within two 3-story office buildings featuring open office space with exposed ceilings, private offices, conference rooms, training rooms, break rooms, multi-purpose rooms, and briefing centers. Tenant improvement construction is concurrent with core/shell buildout. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture Proofpoint, Inc. None Completed 2020 Corporate Tenant Improvement BACK TO PROJECTS
- Spieker Center for the Performing Arts
This project consists of a 34,000 SF steel building housing the new 384 seat performance venue in the heart of campus for dance, music, and theater. The basement level features dressing rooms, a green room, costume shop, stage trap and orchestra lift. State of the art audio-visual systems, rigging and orchestra shells, control and recording rooms, cat walks, tech galleries, and a scene fabrication shop provide infrastructure for young talent to flourish and exciting performance potential. The facility is the new venue for the Music at Menlo chamber music program and contains their administrative offices. Spieker Center for the Performing Arts Atherton, CA This project consists of a 34,000 SF steel building housing the new 384 seat performance venue in the heart of campus for dance, music, and theater. The basement level features dressing rooms, a green room, costume shop, stage trap and orchestra lift. State of the art audio-visual systems, rigging and orchestra shells, control and recording rooms, cat walks, tech galleries, and a scene fabrication shop provide infrastructure for young talent to flourish and exciting performance potential. The facility is the new venue for the Music at Menlo chamber music program and contains their administrative offices. Services Provided: Architect of Record: Client: News: Construction Hacker Menlo School None https://www.sfcv.org/articles/music-news/new-concert-venue-opens-menlo-school Completed 2020 Education BACK TO PROJECTS
- Perenn Bakery
Project includes a 3677 SF tenant improvement for a local French Bakery. Custom millwork is installed through out with two viewing areas to watch employees making pastries/bread. The bakery includes a coffee bar and outdoor patio seating. Exposed concrete floors with wood base, brass fixtures and custom pastry display cases. Perenn Bakery Reno, NV Project includes a 3677 SF tenant improvement for a local French Bakery. Custom millwork is installed through out with two viewing areas to watch employees making pastries/bread. The bakery includes a coffee bar and outdoor patio seating. Exposed concrete floors with wood base, brass fixtures and custom pastry display cases. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Tolles Development Company None Completed 2021 Tenant Improvement Retail Design-Build BACK TO PROJECTS












