- Cisco Executive Briefing Center
The Cisco corporate headquarters Executive Briefing Center project includes selective demolition of 32,000 SF to provide new finishes throughout including interactive audio visual systems and large meeting facility. Occupied by Cisco Executives. Project is considered to be fast track and is based on an eight week schedule. Cisco Executive Briefing Center San Jose, CA The Cisco corporate headquarters Executive Briefing Center project includes selective demolition of 32,000 SF to provide new finishes throughout including interactive audio visual systems and large meeting facility. Occupied by Cisco Executives. Project is considered to be fast track and is based on an eight week schedule. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Cisco Systems, Inc. None Completed 2003 Corporate Tenant Improvement Design-Build BACK TO PROJECTS
- 1050 Page Mill
Project features the redevelopment of a 13.5 acre site at the intersection of Page Mill Road and Hansen Way in the Stanford Research Park. The new 500,000 SF project consists of four all-glass two-story Class A office buildings surrounding an open landscaped courtyard with several fountains and a dedicated underground parking garage for each building. Exterior skin includes elements such as glass fins which distinguish each different building by utilizing a specific dedicated color, flat metal panels, arching metals panels, and large balconies. 1050 Page Mill Palo Alto, CA Project features the redevelopment of a 13.5 acre site at the intersection of Page Mill Road and Hansen Way in the Stanford Research Park. The new 500,000 SF project consists of four all-glass two-story Class A office buildings surrounding an open landscaped courtyard with several fountains and a dedicated underground parking garage for each building. Exterior skin includes elements such as glass fins which distinguish each different building by utilizing a specific dedicated color, flat metal panels, arching metals panels, and large balconies. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture 1050 Page Mill Properties, LLC None https://www.bizjournals.com/sanjose/news/2017/09/22/stanford-research-park-projects-architectural.html Completed 2019 Corporate Stanford Research Park LEED Platinum BACK TO PROJECTS
- SGI Crittenden Offsite Improvements
Crittenden Pump Station and Inlet Piping Project: Construction of a storm water pump station and its associated inlet piping. The pump station project consists of a reinforced concrete wet-well, a reinforced masonry building containing three (3) major pumps, two (2) minor pumps, electrical and mechanical works, a detention pond and all discharge piping. The inlet piping project consists of installing 2,000 feet of HDPE pipe. Crittenden Off Site Design Management: Devcon Construction acted as the managing consultant for all off-site design for the Crittenden off-site projects including Crittenden Pump Station, Crittenden Inlet Piping, Crittenden Lane / North Road Improvement Project, and Crittenden Landfill Landscaping Project. Using architectural and engineering consultants, Devcon established a design team for each project and acted as the managing agent in the design process between the consultants, developer, City of Mountain View and other government agencies. Crittenden Lane/North Road Improvement Project: The North Road project includes the construction of a new raised roadway with concrete curbs, underground utilities, fiber-optic conduit bank and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting, and fiber-optic system. North Access Road And Crittenden Lane Improvement Project: This project includes the construction of a new raised roadway with concrete curbs, underground utilities and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting and a joint utility trench. SGI/City Of Mountain View Offsite Work: This project along North Charleston Road and Amphitheatre Parkway includes meandering walks, parking lot landscaping and underground work. SGI Crittenden Offsite Improvements Mountain View, CA Crittenden Pump Station and Inlet Piping Project: Construction of a storm water pump station and its associated inlet piping. The pump station project consists of a reinforced concrete wet-well, a reinforced masonry building containing three (3) major pumps, two (2) minor pumps, electrical and mechanical works, a detention pond and all discharge piping. The inlet piping project consists of installing 2,000 feet of HDPE pipe. Crittenden Off Site Design Management: Devcon Construction acted as the managing consultant for all off-site design for the Crittenden off-site projects including Crittenden Pump Station, Crittenden Inlet Piping, Crittenden Lane / North Road Improvement Project, and Crittenden Landfill Landscaping Project. Using architectural and engineering consultants, Devcon established a design team for each project and acted as the managing agent in the design process between the consultants, developer, City of Mountain View and other government agencies. Crittenden Lane/North Road Improvement Project: The North Road project includes the construction of a new raised roadway with concrete curbs, underground utilities, fiber-optic conduit bank and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting, and fiber-optic system. North Access Road And Crittenden Lane Improvement Project: This project includes the construction of a new raised roadway with concrete curbs, underground utilities and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting and a joint utility trench. SGI/City Of Mountain View Offsite Work: This project along North Charleston Road and Amphitheatre Parkway includes meandering walks, parking lot landscaping and underground work. Services Provided: Architect of Record: Client: News: Construction Silicon Graphics, Inc. None Completed 2001 Infrastructure BACK TO PROJECTS
- Sequioa Capital Menlo Park - Heritage Remodel
10,000 SF high-end tenant improvement of a venture capital office consisting of new executive offices, library, reception area, breakroom, open office with wood ceiling and conference rooms completed in an occupied building. Finishes include casework, architectural wood slat wall, fabric wrapped panels, and specialty carpet. Sequioa Capital Menlo Park - Heritage Remodel Menlo Park, CA 10,000 SF high-end tenant improvement of a venture capital office consisting of new executive offices, library, reception area, breakroom, open office with wood ceiling and conference rooms completed in an occupied building. Finishes include casework, architectural wood slat wall, fabric wrapped panels, and specialty carpet. Services Provided: Architect of Record: Client: News: Construction Perkins & Will Sequioa Capital None Completed 2024 Tenant Improvement BACK TO PROJECTS
- DivcoWest
This project consists of a design/build shell and site modifications to three existing buildings at 105,000 SF each. Project includes redesign of roof line at main entryways, new balcony guard rails, new roofing and rooftop HVAC equipment, new paving, new landscaping and various site elements. Project also features relocation of the main lobby at 125 Rio Robles, outside of the existing footprint, utilizing a new curtain wall ‘pop out’ to increase street visibility and building access. DivcoWest Menlo Park, CA This project consists of a design/build shell and site modifications to three existing buildings at 105,000 SF each. Project includes redesign of roof line at main entryways, new balcony guard rails, new roofing and rooftop HVAC equipment, new paving, new landscaping and various site elements. Project also features relocation of the main lobby at 125 Rio Robles, outside of the existing footprint, utilizing a new curtain wall ‘pop out’ to increase street visibility and building access. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. DivcoWest None Completed 2019 Corporate Design-Build BACK TO PROJECTS
- Skybox Data Center
This 564,789 SF project includes the demolition of three existing buildings, and new construction of a multi-purpose building comprised of a 4-story data center and six stories of office space. The project features a connecting loading dock with roll up doors, upgraded utility services, and a Day 1 office interior fit out. Additionally, the project features a new SVP substation on property which includes a double-ended 60kV tap from SVP. Skybox Data Center Santa Clara, CA This 564,789 SF project includes the demolition of three existing buildings, and new construction of a multi-purpose building comprised of a 4-story data center and six stories of office space. The project features a connecting loading dock with roll up doors, upgraded utility services, and a Day 1 office interior fit out. Additionally, the project features a new SVP substation on property which includes a double-ended 60kV tap from SVP. Services Provided: Architect of Record: Client: News: Construction Corgan Architecture, Inc. Skybox Development, LLC None Completed 2023 Data Center Corporate BACK TO PROJECTS
- Skyport Plaza
1,176,000 SF project consisting of three 8-story structural steel/precast concrete panel office towers, two steel frame retail structures and two 4-story concrete parking structures with parking for 1,840 cars. Extensive sitework and offsite improvements were also included in this phase of the project along with 340,000 SF office tenant improvements on sixteen floors within two existing 8-story buildings for Siemens. Skyport Plaza San Jose, CA 1,176,000 SF project consisting of three 8-story structural steel/precast concrete panel office towers, two steel frame retail structures and two 4-story concrete parking structures with parking for 1,840 cars. Extensive sitework and offsite improvements were also included in this phase of the project along with 340,000 SF office tenant improvements on sixteen floors within two existing 8-story buildings for Siemens. Services Provided: Architect of Record: Client: News: Construction Kenneth Rodrigues & Partners, Inc Equity Office Properties None Completed 2001 Corporate BACK TO PROJECTS
- USF Student Residence
This project features construction of two new Student Housing buildings at the University’s Lone Mountain campus. Both buildings are wood framed construction over concrete parking garage/podium. The West building is 110,760 SF and consists of five stories over a 1-story parking garage; this building provides 71 dormitory units, as well as amenity spaces. The East building is 123,690 SF and consists of four stories over a 1-story parking garage; this building provides 84 dormitory units, classrooms and amenity spaces. There are 156 parking spaces combined between the two buildings. USF Student Residence San Francisco, CA This project features construction of two new Student Housing buildings at the University’s Lone Mountain campus. Both buildings are wood framed construction over concrete parking garage/podium. The West building is 110,760 SF and consists of five stories over a 1-story parking garage; this building provides 71 dormitory units, as well as amenity spaces. The East building is 123,690 SF and consists of four stories over a 1-story parking garage; this building provides 84 dormitory units, classrooms and amenity spaces. There are 156 parking spaces combined between the two buildings. Services Provided: Architect of Record: Client: News: Construction MVE + Partners The Sobrato Organization None Completed 2021 Residential Education BACK TO PROJECTS
- HP Headquarters
Project consists of tenant improvement within a 6-story building for Hewlett Packard’s new headquarters. The 200,000 SF space features a CEO/executive floor on the 6th floor, with an executive briefing center with a dedicated cafeteria on the 4th floor. The 1st floor includes a media recording studio and innovation showcase space along with a Starbucks coffee station. This building serves as the new home for Hewlett Packard’s CEO and executive staff for the Bay Area. HP Headquarters Sunnyvale, CA Project consists of tenant improvement within a 6-story building for Hewlett Packard’s new headquarters. The 200,000 SF space features a CEO/executive floor on the 6th floor, with an executive briefing center with a dedicated cafeteria on the 4th floor. The 1st floor includes a media recording studio and innovation showcase space along with a Starbucks coffee station. This building serves as the new home for Hewlett Packard’s CEO and executive staff for the Bay Area. Services Provided: Architect of Record: Client: News: Construction Gensler Hewlett Packard Enterprise None Completed 2019 Corporate Tenant Improvement BACK TO PROJECTS
- Coleman Highline
This project consists of design/build core and shell office development utilizing steel systems and a unitized curtain wall system. Project consists of one 5-story office building approximately 166,000 SF and one 6-story office building approximately 198,000 SF. The buildings are connected at the third floor by a pedestrian bridge called the “Highline” walkway. Coleman Highline San Jose, CA This project consists of design/build core and shell office development utilizing steel systems and a unitized curtain wall system. Project consists of one 5-story office building approximately 166,000 SF and one 6-story office building approximately 198,000 SF. The buildings are connected at the third floor by a pedestrian bridge called the “Highline” walkway. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Hunter Properties, Inc. None https://www.bizjournals.com/sanjose/news/2019/07/24/verizon-coleman-highline-development-san-jose.html Completed 2021 Corporate Design-Build BACK TO PROJECTS
- Oakland Air Traffic Control Tower
This 15,000 SF federal government air traffic control tower facility consists of a 2-story administrative building with cast-in-place concrete walls and a 236 foot tall structural steel tower with pre-cast blast panels, and insulated metal panels cladding, and high strength cab glass curtain wall system. Foundations include concrete piles, grade beams, stem walls, and slabs on grade. The landscaped site includes an AOA high security fencing/operated gate system, 660 LF of vinyl sea-wall, bio-swales, gravel pavers, electrical retractable bollards, parking canopies, and concrete paving parking lot. Also included is off-site, airport underground conduit and cabling work to tie the new ATCT into the existing airport communications system. This is a federal recovery/stimulus funded project with all required ARRA reporting. The project will receive a LEED Gold rating, which includes 200KW of solar PV panels and 95% construction waste recycling. Oakland Air Traffic Control Tower Oakland, CA This 15,000 SF federal government air traffic control tower facility consists of a 2-story administrative building with cast-in-place concrete walls and a 236 foot tall structural steel tower with pre-cast blast panels, and insulated metal panels cladding, and high strength cab glass curtain wall system. Foundations include concrete piles, grade beams, stem walls, and slabs on grade. The landscaped site includes an AOA high security fencing/operated gate system, 660 LF of vinyl sea-wall, bio-swales, gravel pavers, electrical retractable bollards, parking canopies, and concrete paving parking lot. Also included is off-site, airport underground conduit and cabling work to tie the new ATCT into the existing airport communications system. This is a federal recovery/stimulus funded project with all required ARRA reporting. The project will receive a LEED Gold rating, which includes 200KW of solar PV panels and 95% construction waste recycling. Services Provided: Architect of Record: Client: News: Construction Leo A. Daly Federal Aviation Administration None https://www.oaklandairport.com/oakland-tower-goes-green-fact-sheet/ Completed 2012 Infrastructure Corporate LEED Gold BACK TO PROJECTS
- Stanford Lathrop Library
This 180,000 SF interior remodel and site work included all new MEPFS system, high density file storage, offices, and classrooms. Project has an intricate concrete waffle slab structure that creates ceiling constraints. Devcon is serving as the BIM coordinator and is utilizing BIM 3D modeling to collaborate between the architectural, structural and MEPFS design. Stanford Lathrop Library Stanford, CA This 180,000 SF interior remodel and site work included all new MEPFS system, high density file storage, offices, and classrooms. Project has an intricate concrete waffle slab structure that creates ceiling constraints. Devcon is serving as the BIM coordinator and is utilizing BIM 3D modeling to collaborate between the architectural, structural and MEPFS design. Services Provided: Architect of Record: Client: News: Construction Perkins + Will Stanford University None Completed 2014 Education Tenant Improvement BACK TO PROJECTS