Search Results
395 results found with an empty search
- 599 Castro
This mixed-use project consists of both commercial and residential buildings. The commercial portion features 109,108 SF of office space including 8,622 SF of future retail space, and three levels of subterranean parking. Work includes removal of an existing parking lot, three levels of excavation and below grade concrete parking structure, and construction of a 4-story steel structure with GFRC and punch glazing skin. The project also features office interior buildouts, as well as site work, consisting of a variety of hardscape and landscaping around the perimeter of the project; site work also includes an interior courtyard that ties the office, residential and Church buildings together. The residential portion of this project consists of a 17,290 SF, 3-story mixed-use residential building which sits on podium level with an underground garage below, shared with the adjacent office building on the site. The units are comprised of four 1-bedroom single story flats, eight 2-story townhomes, and a 3,430 SF ground level parish office. The building’s exterior materials consist of GFRC with natural stone accent exterior finish with three different colors. 599 Castro Mountain View, CA This mixed-use project consists of both commercial and residential buildings. The commercial portion features 109,108 SF of office space including 8,622 SF of future retail space, and three levels of subterranean parking. Work includes removal of an existing parking lot, three levels of excavation and below grade concrete parking structure, and construction of a 4-story steel structure with GFRC and punch glazing skin. The project also features office interior buildouts, as well as site work, consisting of a variety of hardscape and landscaping around the perimeter of the project; site work also includes an interior courtyard that ties the office, residential and Church buildings together. The residential portion of this project consists of a 17,290 SF, 3-story mixed-use residential building which sits on podium level with an underground garage below, shared with the adjacent office building on the site. The units are comprised of four 1-bedroom single story flats, eight 2-story townhomes, and a 3,430 SF ground level parish office. The building’s exterior materials consist of GFRC with natural stone accent exterior finish with three different colors. Services Provided: Architect of Record: Client: News: Construction Steinberg Hart, ArcTec Inc. The Sobrato Organization None Completed 2018 Corporate Retail Residential BACK TO PROJECTS
- Carmel Valley Ranch
This 26,000 SF resort renovation and new construction includes the lodge, tennis club, and vineyard areas. Projects consists of an interior demolition and shoring to existing guestrooms, as well as a complete interior remodel and an addition of a 6,000 SF lower floor to make it into a luxury Spa & Fitness Center. The spa features steam showers, massage treatment rooms with fireplaces, and outdoor terraces. Project also includes the renovation of an addition to the existing main lodge to create 6,600 SF of new lobby, meeting space, and retail area, enclosure of an existing Porte Cochere to create a grand lobby and construction of a new pool and jacuzzi deck extending under the tree canopy and grand water features, and tennis club sitework with a new 5,500 SF fitness building. The project features an outdoor swimming pool, kid's water play area, and bocce courts, in addition to a new herb garden set on a hillside within a vineyard. Carmel Valley Ranch Carmel, CA This 26,000 SF resort renovation and new construction includes the lodge, tennis club, and vineyard areas. Projects consists of an interior demolition and shoring to existing guestrooms, as well as a complete interior remodel and an addition of a 6,000 SF lower floor to make it into a luxury Spa & Fitness Center. The spa features steam showers, massage treatment rooms with fireplaces, and outdoor terraces. Project also includes the renovation of an addition to the existing main lodge to create 6,600 SF of new lobby, meeting space, and retail area, enclosure of an existing Porte Cochere to create a grand lobby and construction of a new pool and jacuzzi deck extending under the tree canopy and grand water features, and tennis club sitework with a new 5,500 SF fitness building. The project features an outdoor swimming pool, kid's water play area, and bocce courts, in addition to a new herb garden set on a hillside within a vineyard. Services Provided: Architect of Record: Client: News: Construction Paul Davis Partnership CVR HSGE, LLC None Completed 2010 Hotel / Resort Retail BACK TO PROJECTS
- Stanford Freidenrich Center
Project consists of the complete demolition of the existing structure and the construction of a new 3-story, 30,000 SF poured-in-place concrete structure with a combination of glass, metal panel, screening elements and limestone façade. The 1.4 acre site includes an entry patio with a fountain, permeable interlocking pavers, bio-retention areas, planting and site concrete work. The first floor provides an OSHPD-3 certified space for clinical research including a customized space for pediatric research. The second and third floors have work space for researchers and conference rooms for interdisciplinary research teams. Stanford Freidenrich Center Palo Alto, CA Project consists of the complete demolition of the existing structure and the construction of a new 3-story, 30,000 SF poured-in-place concrete structure with a combination of glass, metal panel, screening elements and limestone façade. The 1.4 acre site includes an entry patio with a fountain, permeable interlocking pavers, bio-retention areas, planting and site concrete work. The first floor provides an OSHPD-3 certified space for clinical research including a customized space for pediatric research. The second and third floors have work space for researchers and conference rooms for interdisciplinary research teams. Services Provided: Architect of Record: Client: News: Construction WRNS Studio Stanford School of Medicine None https://www.archdaily.com/302609/freidenrich-center-for-translational-research-wrns-studio http://med.stanford.edu/news/all-news/2012/10/new-freidenrich-center-will-help-streamline-clinical-research.html Completed 2012 Education Corporate BACK TO PROJECTS
- 1201 Tennessee
The 235,000 SF design/build apartment complex consists of 263 units and 1,840 SF of retail space. The project consists of six stories and a mezzanine. The parking lot houses 147 vehicles and 273 bikes. Amenities include a tech room, bike shop, fitness room, clubhouse kitchen and bar, outdoor landscaped courtyard with BBQ and fireplace, and a community roof deck with views of the bay. This project is Green Point Rated. 1201 Tennessee San Francisco, CA The 235,000 SF design/build apartment complex consists of 263 units and 1,840 SF of retail space. The project consists of six stories and a mezzanine. The parking lot houses 147 vehicles and 273 bikes. Amenities include a tech room, bike shop, fitness room, clubhouse kitchen and bar, outdoor landscaped courtyard with BBQ and fireplace, and a community roof deck with views of the bay. This project is Green Point Rated. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. AGI Avant, Inc None Completed 2017 Residential Design-Build Green Point Rated BACK TO PROJECTS
- Mentor Graphics
This project consists of a 120,000 SF Interior renovation with computer room, large presentation/training facility, cafeteria. Mentor Graphics San Jose, CA This project consists of a 120,000 SF Interior renovation with computer room, large presentation/training facility, cafeteria. Services Provided: Architect of Record: Client: News: Construction NA Mentor Graphics None Completed 2011 Corporate Tenant Improvement BACK TO PROJECTS
- Santana Row Building 7
Devcon provided construction management services for 256 town home and apartment units accompanied with a clubhouse and pool atop retail overlooking Santana Row and Winchester Blvd. in San Jose. The three separate apartment buildings house 160 units that feature exterior stone veneers over plaster system and granite counter tops with fine cabinetry. Surrounding the three apartment buildings are the 96 town home units that also include granite counter tops, upscale interior finishes and an exotic 80 paint coloring scheme to reflect the diversity of each unit. Building 7 currently hosts Santana Heights and the Hotel Valencia. Project also consisted of three floors for parking; one below grade, one at grade level and one above grade. This project includes a ConXtech structure. Santana Row Building 7 San Jose, CA Devcon provided construction management services for 256 town home and apartment units accompanied with a clubhouse and pool atop retail overlooking Santana Row and Winchester Blvd. in San Jose. The three separate apartment buildings house 160 units that feature exterior stone veneers over plaster system and granite counter tops with fine cabinetry. Surrounding the three apartment buildings are the 96 town home units that also include granite counter tops, upscale interior finishes and an exotic 80 paint coloring scheme to reflect the diversity of each unit. Building 7 currently hosts Santana Heights and the Hotel Valencia. Project also consisted of three floors for parking; one below grade, one at grade level and one above grade. This project includes a ConXtech structure. Services Provided: Architect of Record: Client: News: Construction MBH, Sandy & Babcock Federal Realty Investment Trust None Completed 2006 Residential BACK TO PROJECTS
- Cisco Campus
Devcon Construction has been building the San Jose Cisco Campus since 1992. Throughout our long relationship with Cisco, we have work on additional campuses in Boston, San Francisco, and Mountain View. The following list is some of the work we have done on the San Jose campus: SITE 1: Project consists of eight 2-story concrete tilt-up buildings with complete tenant improvements, (2) cafeterias, executive briefing center, labs and manufacturing. Site 1 encompasses Buildings A-H. SITE 2: Project consists of one 4-story, two 3-story and one 2-story buildings. Includes complete tenant improvements, cafeteria, executive briefing center and labs. Site 2 encompasses Buildings I-P. SITE 3: Project consists of three 2-story concrete tilt-up buildings situated on a 13 acre site. Sitework includes two water features and concrete walks with trellises. Tenant improvements include office space, engineering labs and a 7,000 SF cafeteria. Site 3 encompasses Buildings M-Q. SITE 4: Project consists of eleven 3-story and seven 4-story buildings and one 5-story building situated on a 125 acre site. The buildings are steel framed, dryvit skinned buildings. Sitework includes water features, sports facilities and pedestrian walkways linking the buildings. Tenant improvements features an auditorium, conference center, engineering labs, three cafeterias, fitness center, computer center and open office areas. Site 4 encompasses Buildings 1-19. SITE 5: Project consists of five 3-story buildings situated on a 70 acre site. The buildings are steel framed, curtain wall and aluminum panel skinned buildings. Site work includes water features, sports facilities and pedestrian walkways linking the buildings. Tenant improvements features extensive engineering labs, a full service cafeteria, a data center and open office areas. Site 5 encompasses Buildings 20-25 SITE 5.1 EXPANSION CAMPUS: Managing the design/build team for pre-construction and buildout of five 2-story office buildings. These buildings which are 82,000 SF each, two of which are built on a concrete podium with parking below, and feature steel framed structures, houses rack lab, bench lab, light lab, open office space, EBC & telepresence conference rooms, as well as a 20,000 SF cafeteria. Project also featured 80,000 SF labs with starline electrical hot isle/cold isle HVAC with box car units on the roof for cooling. Site 5.1 encompasses Buildings 28-32. This project is a LEED Gold Award winner. SITE 6: Project consists of two 3-story buildings. The buildings are metal panel and GFRC steel framed. Sitework includes water features and pedestrian walkways. SITE 7 COYOTE: Design/build and pre-construction services of a project consisting of forty 3 to 6 story buildings. The steel frame buildings include a variety of exterior skins, such as metal panels, GFRC/Precast panels and glass curtain walls. Tenant improvements consist of several laboratory areas, offices, data centers, conference rooms, exercise facilities and an auditorium. The site also features extensive infrastructure sitework. SITE 7 PARKING GARAGE: 438,500 SF project consisting of three levels 1,353 parking stalls, 438,500 SF of “open” parking structure. Construction type: Type II FR. Occupancy group: S3 open parking garage. Structural system: concrete long span column spacing with post tensioned concrete decks, concrete slab on grade spread footings. Project featured Agrarian themed architectural style to match the Coyote Valley Master plan. The design incorporates curved CMU screen walls, trellis canopies and cantilevered steel balconies. Landscaping berms at grade level reduce perceived building height and architectural mesh panels at ground floor openings were provided for aesthetic and security reasons. (Design only) SITE 4 EBC: Site “4” 35,000 SF Executive Briefing Center on the ground floor of a 5-story (+/- 255,119 SF) office R&D building. Projects consists of separate secured (card access) lobby off of the main building lobby, 12 individual conference rooms and two demonstration rooms of various sizes. Project also includes a virtual customer office, a virtual sales office, a company lab “display” room with a curved full height mullion free glass wall and an adjacent executive catering facility. Storage and separate rest room facilities also accompany the building with considerable display space in a central circular circulation area. There is also an extensive use of audiovisual equipment and multiple ceilings and soffits heights based on a radial geometry. Indirect cove lighting in both curved and linear soffits as well as high-end millwork details and trims. SITE 4 & 5 CAFETERIAS: Project consisting of four cafeterias, three for Site 4 and one for Site 5, totaling approximately 75,000 SF. SITE 5.1 LAB HVAC RETROFIT: Installation of rooftop HVAC ductwork, dampers and controls to enable house HVAC units to back-up lab HVAC units. Work involved four (4) buildings and (16) rooftop HVAC units. PARKING STRUCTURES 1, 2, 3: Project consisting of three design/build, cast-in-place, reinforced and post-tensioned concrete construction parking garages, each consisting of four levels of above grade parking (3 elevated). Structure 1 is 239,141 SF and provides 788 stalls. Structure 2 is 225,031 SF and provides 741 stalls. Structure 3 is 319,085 SF and provides 1032 stalls. All of the garages feature charging stations for electric vehicles, vehicle monitoring systems, preparations for future photovoltaic systems, upgraded site and garage signage to match the campus, and a texcoat finish. BUILDING 1 & BUILDING 2 NUOVA RELOCATION: Phased and expedited relocation of Nuova from off-campus building to SJC-1 & 2. Scope included revisions in existing rack and bench labs to provide electrical and data cabling requirements, as well as infrastructure for new and relocated chambers. BUILDING 2 MULTI-LABS: 30,500 SF project involves demolition of office space and construction of three rack labs on 24” access floor. Added equipment includes 21 CAH units, cooling tower, chiller, 21 KV main electrical service section and related distribution, as well as cyber-switched Starline modular power system to facilitate remote monitoring of power consumption and load shedding. Project built in occupied building in three phases, including relocation of library and security operations center. BUILDING 6 RACK LABS: Project consisting of five phases of exterior and interior improvements of a 176,735 SF 3-story building. Project included the conversion of bench lab to Rack lab and featured demolition, raised floor, HVAC units, with roof top equipment and structural steel. Project also featured a 24” raised floor. BUILDING 8 BROADCAST TELEVISION STUDIOS: Coordinate all engineering (acoustical, sound and MEP) to construct 14,400 SF if a Broadcast Television Studio. Project scope included four studios with Control Rooms, Master control room and Edit Suites. Construction consists of sound doors, layered wall and ceiling construction with sound isolators and close coordination with the systems integrator equipment and cabling contractor. BUILDING 9 EVENT CENTER LIGHTING: Project consisting of removal of existing light fixtures and installation of new upgraded fixtures, new ceiling, replacement of existing flooring, and re-lamp at food service counters and paint. Project also features upgraded flooring in two conference rooms, new window coverings, re-lamping, new chem-metal chair rails and base and paint. BUILDING 10: 250,000 SF tenant improvement within a 5-story office building including ADA exterior sitework upgrades, executive suite areas, private offices, and board room with state of the art telepresence Prysm integrated technology. Project consists of breakrooms, an Ecafe, open office areas, audio privacy rooms, touch-down spaces, new open ceiling at 2-story lobby with new poured concrete stairs. Project also features a new reception desk, all new finishes, custom casework, custom furniture, rare wood ceilings and paneling, restroom cores and elevator lobbies, new LED lighting, new ceilings, new upgraded data, as well as new HVAC distribution. BUILDING 12 CCW: 208,000 SF tenant improvement including all new cable to Cat 6 standards in all FD, BD, SD, & LD rooms, new quiet rooms, break rooms, and egg shaped break area. Project also consists of new carpet, new paint, new cubicles to match the new style of CCW workspace, refresh lobby, acoustic fabric panels, and IDEA paint to write on the walls with magnetic properties. BUILDING 15 LAB UGRADES: Power, cooling and raised floor upgrades to (2) labs totaling 17,000 SF, including installation of new transformer and (3) 30-ton CRAH units. BUILDING 15 ACTIVE COLLABORATION ROOM PILOT PROJECT: 770 SF project consisting of a telepresence linked to multiple displays (Smartboard, projectors) with raised flooring to run cabling/power to all seating areas in the space. The raised floor was a Haworth Tecrete floor system with spider junction boxes providing power distribution under the floor. A ramp was built outside the door to transition to the level of the open cubicle space. BUILDING 21 UPGRADES: 240,000 SF 3-story building project consisting of upgrades to power, lighting, data and finishes throughout. BUILDING 24 AST LAB: 5,175 SF Audio/Video Testing Lab. Scope includes raised floor lab containing over 300 monitors mounted on reconfigurable framed structure, extensive power and data cabling, supporting rack labs, conference and Telepresence Rooms. BUILDING C TRAINING CENTER: 45,000 SF, three phase project within an existing occupied building that consist of adding approximately 20 training rooms, new two story metal stair, additional rated core and expansion of two restroom cores. Coordinated all architectural, structural, electrical, mechanical, plumbing trades engineering and construction. BUILDING L CREATIVITY ZONES: Design/build project consisting of community rooms with video games, arcade games and touch screens. The 1st floor creativity zone features a video game theme while the 2nd floor has a comic book theme. Rooms are located in the building where the Cisco employees can take a break from their daily activities but also keep their minds engaged. BUILDING M DATA CENTER REMODEL: Data center remodel including a 3,000 SF expansion of existing data center while in operation. BUILDING P: 121,126 SF two-story concrete tilt-up building with offices, two anechoic chambers and two debug chambers used for product testing. Project consisting of three phases. Phase 1 included installation of new foundation for acoustical chamber. Phase 2 featured installation of a new acoustical chamber and construction of floating slab floors, installation of control room, with miscellaneous electrical and mechanical work. Phase 3 consisted of two new humidifiers on the roof, duck work, and structural roof sleepers. BUILDING Q LIFE CONNECTIONS CENTER: 113,000SF two-story tenant improvement build-out including a 43,000 SF child care center, 45,000 SF fitness center and 26,395 SF health clinic. The child care center also includes 40,000 SF of site work with an enclosed play yard with playground equipment and structures. This project is a LEED Gold Award winner. BUILDING Q PHYSICAL THERAPY REFRESH: Project consisting of replacement of existing men’s and women’s locker room vanities, vanity mirrors and lighting. Project also includes new lockers, new privacy curtains at dressing rooms and paint, upgraded lighting in gym area, multipurpose room with a store front glass door, creation of a spa corridor entering into the massage and locker rooms area. The physical therapy remodel features an additional physical therapy room, new flooring, paint, mirrors, ballet bar, and replacement of carpets in the medical reception area, hallways and two staircases. EBC: Cisco corporate headquarters Executive Briefing Center includes selective demolition of 32,000 SF to provide new finishes throughout including interactive audio visual systems and large meeting facility. Occupied by Cisco Executives. Project is considered to be fast track and is based on an eight week schedule. EBC 10: 18,000 SF design/build Cisco Corporate Headquarters Executive Briefing Center. Project included demolition and relocation of all main overhead MEP and fire systems to accommodate raised ceilings, seven unique Telepresence Suites, one sports and entertainment suite, six customer briefing suites, high-end interactive audio visual systems, lighting and finishes. Fast track project occupied by Cisco executives. CCW: Cisco Connected Workplace projects in Building 11 and Building 14 includes demolition and rebuild totaling over 65,000 SF. Open workplace environment, new cores, new high end finishes throughout. Fast track project. CHAMBER INSTALLATION: Multiple chamber installation including water cooled with CDA, sound, altitude, humidity, RF and anechoic at Cisco Systems at building A, B, E, F, G, H, I, M, N, O, P, 1, 4, 6, 7, 15, 16, 18, 19, 20, 22, 23, 24, 28, 29, 31 and 32. CHILD CARE CENTER: Child care facility to house approximately 480 children. 64,000 SF single story wood framed lath and plaster building with a masonry wainscot. A unique courtyard design was developed in order to mitigate the numerous challenges of a very difficult triangular-shaped site. The site has inhospitable adjacencies on all sides; a major freeway (880), a 6-lane overpass, a strip retail shopping plaza, and a busy 4-lane road. The courtyard design exceeds the minimal state mandated outdoor play space and allowed the architectural scale to be reduced to a more child-friendly “residential” size. Extensive overhangs provide shade and eliminate the need for internal corridors. HEADQUARTERS RENOVATION: Pre-construction services for a 2,925,000 SF project consisting of new offices within R & D buildings on a portion of the existing Cisco San Jose ‘Site 4’ campus. The project sits on 47.61 acres on the north side of Tasman Drive between Zanker Road and McCarthy Boulevard. Project includes demolition of three existing Cisco buildings; numbers 3, 4 and 5, and retaining four existing Cisco (“Lab”) buildings; numbers 1, 2, 6 and 7. The construction includes three new 15-story high-rise towers with two levels of below grade parking along with two 10-level parking structures. The below grade parking levels will be interconnected below grade and the three high-rise buildings will be connected with above grade bridges on most floors. GLOBAL PROGRAMS AND TSBU TELEPRESENCE: Design/build projects directly with lab user groups that design product as well as Global Programs/Marketing on Cisco rollout of product. Project includes electrical and data infrastructure for units, HVAC and finishes for rooms. Cisco Campus San Jose, CA Devcon Construction has been building the San Jose Cisco Campus since 1992. Throughout our long relationship with Cisco, we have work on additional campuses in Boston, San Francisco, and Mountain View. The following list is some of the work we have done on the San Jose campus: SITE 1: Project consists of eight 2-story concrete tilt-up buildings with complete tenant improvements, (2) cafeterias, executive briefing center, labs and manufacturing. Site 1 encompasses Buildings A-H. SITE 2: Project consists of one 4-story, two 3-story and one 2-story buildings. Includes complete tenant improvements, cafeteria, executive briefing center and labs. Site 2 encompasses Buildings I-P. SITE 3: Project consists of three 2-story concrete tilt-up buildings situated on a 13 acre site. Sitework includes two water features and concrete walks with trellises. Tenant improvements include office space, engineering labs and a 7,000 SF cafeteria. Site 3 encompasses Buildings M-Q. SITE 4: Project consists of eleven 3-story and seven 4-story buildings and one 5-story building situated on a 125 acre site. The buildings are steel framed, dryvit skinned buildings. Sitework includes water features, sports facilities and pedestrian walkways linking the buildings. Tenant improvements features an auditorium, conference center, engineering labs, three cafeterias, fitness center, computer center and open office areas. Site 4 encompasses Buildings 1-19. SITE 5: Project consists of five 3-story buildings situated on a 70 acre site. The buildings are steel framed, curtain wall and aluminum panel skinned buildings. Site work includes water features, sports facilities and pedestrian walkways linking the buildings. Tenant improvements features extensive engineering labs, a full service cafeteria, a data center and open office areas. Site 5 encompasses Buildings 20-25 SITE 5.1 EXPANSION CAMPUS: Managing the design/build team for pre-construction and buildout of five 2-story office buildings. These buildings which are 82,000 SF each, two of which are built on a concrete podium with parking below, and feature steel framed structures, houses rack lab, bench lab, light lab, open office space, EBC & telepresence conference rooms, as well as a 20,000 SF cafeteria. Project also featured 80,000 SF labs with starline electrical hot isle/cold isle HVAC with box car units on the roof for cooling. Site 5.1 encompasses Buildings 28-32. This project is a LEED Gold Award winner. SITE 6: Project consists of two 3-story buildings. The buildings are metal panel and GFRC steel framed. Sitework includes water features and pedestrian walkways. SITE 7 COYOTE: Design/build and pre-construction services of a project consisting of forty 3 to 6 story buildings. The steel frame buildings include a variety of exterior skins, such as metal panels, GFRC/Precast panels and glass curtain walls. Tenant improvements consist of several laboratory areas, offices, data centers, conference rooms, exercise facilities and an auditorium. The site also features extensive infrastructure sitework. SITE 7 PARKING GARAGE: 438,500 SF project consisting of three levels 1,353 parking stalls, 438,500 SF of “open” parking structure. Construction type: Type II FR. Occupancy group: S3 open parking garage. Structural system: concrete long span column spacing with post tensioned concrete decks, concrete slab on grade spread footings. Project featured Agrarian themed architectural style to match the Coyote Valley Master plan. The design incorporates curved CMU screen walls, trellis canopies and cantilevered steel balconies. Landscaping berms at grade level reduce perceived building height and architectural mesh panels at ground floor openings were provided for aesthetic and security reasons. (Design only) SITE 4 EBC: Site “4” 35,000 SF Executive Briefing Center on the ground floor of a 5-story (+/- 255,119 SF) office R&D building. Projects consists of separate secured (card access) lobby off of the main building lobby, 12 individual conference rooms and two demonstration rooms of various sizes. Project also includes a virtual customer office, a virtual sales office, a company lab “display” room with a curved full height mullion free glass wall and an adjacent executive catering facility. Storage and separate rest room facilities also accompany the building with considerable display space in a central circular circulation area. There is also an extensive use of audiovisual equipment and multiple ceilings and soffits heights based on a radial geometry. Indirect cove lighting in both curved and linear soffits as well as high-end millwork details and trims. SITE 4 & 5 CAFETERIAS: Project consisting of four cafeterias, three for Site 4 and one for Site 5, totaling approximately 75,000 SF. SITE 5.1 LAB HVAC RETROFIT: Installation of rooftop HVAC ductwork, dampers and controls to enable house HVAC units to back-up lab HVAC units. Work involved four (4) buildings and (16) rooftop HVAC units. PARKING STRUCTURES 1, 2, 3: Project consisting of three design/build, cast-in-place, reinforced and post-tensioned concrete construction parking garages, each consisting of four levels of above grade parking (3 elevated). Structure 1 is 239,141 SF and provides 788 stalls. Structure 2 is 225,031 SF and provides 741 stalls. Structure 3 is 319,085 SF and provides 1032 stalls. All of the garages feature charging stations for electric vehicles, vehicle monitoring systems, preparations for future photovoltaic systems, upgraded site and garage signage to match the campus, and a texcoat finish. BUILDING 1 & BUILDING 2 NUOVA RELOCATION: Phased and expedited relocation of Nuova from off-campus building to SJC-1 & 2. Scope included revisions in existing rack and bench labs to provide electrical and data cabling requirements, as well as infrastructure for new and relocated chambers. BUILDING 2 MULTI-LABS: 30,500 SF project involves demolition of office space and construction of three rack labs on 24” access floor. Added equipment includes 21 CAH units, cooling tower, chiller, 21 KV main electrical service section and related distribution, as well as cyber-switched Starline modular power system to facilitate remote monitoring of power consumption and load shedding. Project built in occupied building in three phases, including relocation of library and security operations center. BUILDING 6 RACK LABS: Project consisting of five phases of exterior and interior improvements of a 176,735 SF 3-story building. Project included the conversion of bench lab to Rack lab and featured demolition, raised floor, HVAC units, with roof top equipment and structural steel. Project also featured a 24” raised floor. BUILDING 8 BROADCAST TELEVISION STUDIOS: Coordinate all engineering (acoustical, sound and MEP) to construct 14,400 SF if a Broadcast Television Studio. Project scope included four studios with Control Rooms, Master control room and Edit Suites. Construction consists of sound doors, layered wall and ceiling construction with sound isolators and close coordination with the systems integrator equipment and cabling contractor. BUILDING 9 EVENT CENTER LIGHTING: Project consisting of removal of existing light fixtures and installation of new upgraded fixtures, new ceiling, replacement of existing flooring, and re-lamp at food service counters and paint. Project also features upgraded flooring in two conference rooms, new window coverings, re-lamping, new chem-metal chair rails and base and paint. BUILDING 10: 250,000 SF tenant improvement within a 5-story office building including ADA exterior sitework upgrades, executive suite areas, private offices, and board room with state of the art telepresence Prysm integrated technology. Project consists of breakrooms, an Ecafe, open office areas, audio privacy rooms, touch-down spaces, new open ceiling at 2-story lobby with new poured concrete stairs. Project also features a new reception desk, all new finishes, custom casework, custom furniture, rare wood ceilings and paneling, restroom cores and elevator lobbies, new LED lighting, new ceilings, new upgraded data, as well as new HVAC distribution. BUILDING 12 CCW: 208,000 SF tenant improvement including all new cable to Cat 6 standards in all FD, BD, SD, & LD rooms, new quiet rooms, break rooms, and egg shaped break area. Project also consists of new carpet, new paint, new cubicles to match the new style of CCW workspace, refresh lobby, acoustic fabric panels, and IDEA paint to write on the walls with magnetic properties. BUILDING 15 LAB UGRADES: Power, cooling and raised floor upgrades to (2) labs totaling 17,000 SF, including installation of new transformer and (3) 30-ton CRAH units. BUILDING 15 ACTIVE COLLABORATION ROOM PILOT PROJECT: 770 SF project consisting of a telepresence linked to multiple displays (Smartboard, projectors) with raised flooring to run cabling/power to all seating areas in the space. The raised floor was a Haworth Tecrete floor system with spider junction boxes providing power distribution under the floor. A ramp was built outside the door to transition to the level of the open cubicle space. BUILDING 21 UPGRADES: 240,000 SF 3-story building project consisting of upgrades to power, lighting, data and finishes throughout. BUILDING 24 AST LAB: 5,175 SF Audio/Video Testing Lab. Scope includes raised floor lab containing over 300 monitors mounted on reconfigurable framed structure, extensive power and data cabling, supporting rack labs, conference and Telepresence Rooms. BUILDING C TRAINING CENTER: 45,000 SF, three phase project within an existing occupied building that consist of adding approximately 20 training rooms, new two story metal stair, additional rated core and expansion of two restroom cores. Coordinated all architectural, structural, electrical, mechanical, plumbing trades engineering and construction. BUILDING L CREATIVITY ZONES: Design/build project consisting of community rooms with video games, arcade games and touch screens. The 1st floor creativity zone features a video game theme while the 2nd floor has a comic book theme. Rooms are located in the building where the Cisco employees can take a break from their daily activities but also keep their minds engaged. BUILDING M DATA CENTER REMODEL: Data center remodel including a 3,000 SF expansion of existing data center while in operation. BUILDING P: 121,126 SF two-story concrete tilt-up building with offices, two anechoic chambers and two debug chambers used for product testing. Project consisting of three phases. Phase 1 included installation of new foundation for acoustical chamber. Phase 2 featured installation of a new acoustical chamber and construction of floating slab floors, installation of control room, with miscellaneous electrical and mechanical work. Phase 3 consisted of two new humidifiers on the roof, duck work, and structural roof sleepers. BUILDING Q LIFE CONNECTIONS CENTER: 113,000SF two-story tenant improvement build-out including a 43,000 SF child care center, 45,000 SF fitness center and 26,395 SF health clinic. The child care center also includes 40,000 SF of site work with an enclosed play yard with playground equipment and structures. This project is a LEED Gold Award winner. BUILDING Q PHYSICAL THERAPY REFRESH: Project consisting of replacement of existing men’s and women’s locker room vanities, vanity mirrors and lighting. Project also includes new lockers, new privacy curtains at dressing rooms and paint, upgraded lighting in gym area, multipurpose room with a store front glass door, creation of a spa corridor entering into the massage and locker rooms area. The physical therapy remodel features an additional physical therapy room, new flooring, paint, mirrors, ballet bar, and replacement of carpets in the medical reception area, hallways and two staircases. EBC: Cisco corporate headquarters Executive Briefing Center includes selective demolition of 32,000 SF to provide new finishes throughout including interactive audio visual systems and large meeting facility. Occupied by Cisco Executives. Project is considered to be fast track and is based on an eight week schedule. EBC 10: 18,000 SF design/build Cisco Corporate Headquarters Executive Briefing Center. Project included demolition and relocation of all main overhead MEP and fire systems to accommodate raised ceilings, seven unique Telepresence Suites, one sports and entertainment suite, six customer briefing suites, high-end interactive audio visual systems, lighting and finishes. Fast track project occupied by Cisco executives. CCW: Cisco Connected Workplace projects in Building 11 and Building 14 includes demolition and rebuild totaling over 65,000 SF. Open workplace environment, new cores, new high end finishes throughout. Fast track project. CHAMBER INSTALLATION: Multiple chamber installation including water cooled with CDA, sound, altitude, humidity, RF and anechoic at Cisco Systems at building A, B, E, F, G, H, I, M, N, O, P, 1, 4, 6, 7, 15, 16, 18, 19, 20, 22, 23, 24, 28, 29, 31 and 32. CHILD CARE CENTER: Child care facility to house approximately 480 children. 64,000 SF single story wood framed lath and plaster building with a masonry wainscot. A unique courtyard design was developed in order to mitigate the numerous challenges of a very difficult triangular-shaped site. The site has inhospitable adjacencies on all sides; a major freeway (880), a 6-lane overpass, a strip retail shopping plaza, and a busy 4-lane road. The courtyard design exceeds the minimal state mandated outdoor play space and allowed the architectural scale to be reduced to a more child-friendly “residential” size. Extensive overhangs provide shade and eliminate the need for internal corridors. HEADQUARTERS RENOVATION: Pre-construction services for a 2,925,000 SF project consisting of new offices within R & D buildings on a portion of the existing Cisco San Jose ‘Site 4’ campus. The project sits on 47.61 acres on the north side of Tasman Drive between Zanker Road and McCarthy Boulevard. Project includes demolition of three existing Cisco buildings; numbers 3, 4 and 5, and retaining four existing Cisco (“Lab”) buildings; numbers 1, 2, 6 and 7. The construction includes three new 15-story high-rise towers with two levels of below grade parking along with two 10-level parking structures. The below grade parking levels will be interconnected below grade and the three high-rise buildings will be connected with above grade bridges on most floors. GLOBAL PROGRAMS AND TSBU TELEPRESENCE: Design/build projects directly with lab user groups that design product as well as Global Programs/Marketing on Cisco rollout of product. Project includes electrical and data infrastructure for units, HVAC and finishes for rooms. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Cisco Systems, Inc. None All Projects Corporate Design-Build Various LEED Certifications BACK TO PROJECTS
- 4880 Great America Parkway
This 170,760 SF project consists of a 5-story structural steel. The exterior skin of the building primarily features GFRC, metal panel, and curtain wall/storefront systems highlighted by the signature Rooftop Fin structure. 4880 Great America Parkway Santa Clara, CA This 170,760 SF project consists of a 5-story structural steel. The exterior skin of the building primarily features GFRC, metal panel, and curtain wall/storefront systems highlighted by the signature Rooftop Fin structure. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture Sobrato Construction Corp None Completed 2015 Corporate BACK TO PROJECTS
- SCU Leavey Center
65,000 SF renovation of intercollegiate basketball/volleyball center including new curtain wall, new roof, new HVAC lighting, wood floor, bleachers and state of the art scoreboard system. SCU Leavey Center Santa Clara, CA 65,000 SF renovation of intercollegiate basketball/volleyball center including new curtain wall, new roof, new HVAC lighting, wood floor, bleachers and state of the art scoreboard system. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 1997 Education BACK TO PROJECTS
- Umpqua Bank
Retail Store Branch: 2,500 SF tenant improvement for a signature bank branch featuring elegant, yet modern high-end finishes including new lighting and millwork. The project also features digital media devices integrated throughout bank space for innovative use for both marketing and customer access devices. Business Office: 4,800 SF tenant improvement on the second floor of a mixed-use building including bank administrative offices. The project is highlighted by a frameless glass reception entry and iconic bank branded murals and furnishings. Umpqua Bank Novato, CA Retail Store Branch: 2,500 SF tenant improvement for a signature bank branch featuring elegant, yet modern high-end finishes including new lighting and millwork. The project also features digital media devices integrated throughout bank space for innovative use for both marketing and customer access devices. Business Office: 4,800 SF tenant improvement on the second floor of a mixed-use building including bank administrative offices. The project is highlighted by a frameless glass reception entry and iconic bank branded murals and furnishings. Services Provided: Architect of Record: Client: News: Construction NA Umpqua Bank None Completed 2013 Retail Corporate Tenant Improvement BACK TO PROJECTS
- 400 Main
This 31,000 SF mixed-use project includes the construction of a building with provisions for up to two restaurants, six retail tenants on the first floor, and Class A offices on the second floor. The exterior of the building features a combination of limestone veneer and plaster, with stone finish cornice and corbels at the top of parapets. Project includes two full height curtain wall towers with stone veneer, cornice and copper shingle roofs, as well as cornice. Project also consists of a large sidewalk area and central courtyard for substantial public space, and outdoor dining with a stone clad fountain center piece. 400 Main Los Altos, CA This 31,000 SF mixed-use project includes the construction of a building with provisions for up to two restaurants, six retail tenants on the first floor, and Class A offices on the second floor. The exterior of the building features a combination of limestone veneer and plaster, with stone finish cornice and corbels at the top of parapets. Project includes two full height curtain wall towers with stone veneer, cornice and copper shingle roofs, as well as cornice. Project also consists of a large sidewalk area and central courtyard for substantial public space, and outdoor dining with a stone clad fountain center piece. Services Provided: Architect of Record: Client: News: Construction DES Architects + Engineers 400 Main St. LLC None Completed 2014 Retail Corporate Restaurants BACK TO PROJECTS
- 1212 Bordeaux
This 100,000 SF project consists of a 2-story steel structure on a 200,000 SF site. The project features a mezzanine level above the second floor, an unpainted exposed steel structure supporting extensive column free space throughout, five sawtooth clerestories supported by Vierendeel trusses which provide extensive daylight and sky views to the large open workspace, and large perimeter windows protected by exterior operable blinds, providing responsive daylight and heat-gain control around the building. The project also consists of exposed board-formed precast concrete insulated panels that provide both an exterior and interior finish with benefits of thermal mass, and a diverse landscape with a public plaza, an exposed private garden, bioswales, and extensive native plantings. 1212 Bordeaux Sunnyvale, CA This 100,000 SF project consists of a 2-story steel structure on a 200,000 SF site. The project features a mezzanine level above the second floor, an unpainted exposed steel structure supporting extensive column free space throughout, five sawtooth clerestories supported by Vierendeel trusses which provide extensive daylight and sky views to the large open workspace, and large perimeter windows protected by exterior operable blinds, providing responsive daylight and heat-gain control around the building. The project also consists of exposed board-formed precast concrete insulated panels that provide both an exterior and interior finish with benefits of thermal mass, and a diverse landscape with a public plaza, an exposed private garden, bioswales, and extensive native plantings. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Confidential None Completed 2017 Corporate Design-Build LEED Platinum BACK TO PROJECTS