Search Results
Search this site
397 results found with an empty search
- Paragon Apartments
This 355,000 SF building consists of a 6-story building with 185 luxury apartments. Project features four stories of wood framed structure over a 2- story concrete parking garage and includes an interior courtyard with beautiful landscaping, comfortable outdoor furniture, and a sleek water feature promoting a relaxing atmosphere. Each unit is well appointed with honey stained maple cabinets, granite counter tops and whirlpool appliances that includes a washer dryer set. The top floor has upgraded glass insert cabinet doors and stainless steel Whirlpool appliances. Paragon Apartments San Bruno, CA This 355,000 SF building consists of a 6-story building with 185 luxury apartments. Project features four stories of wood framed structure over a 2- story concrete parking garage and includes an interior courtyard with beautiful landscaping, comfortable outdoor furniture, and a sleek water feature promoting a relaxing atmosphere. Each unit is well appointed with honey stained maple cabinets, granite counter tops and whirlpool appliances that includes a washer dryer set. The top floor has upgraded glass insert cabinet doors and stainless steel Whirlpool appliances. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Archstone None Completed 2007 Residential Design-Build BACK TO PROJECTS
- Straus Production Facility
Construction of new a 50,000 SF organic dairy processing facility, as well as new office, restrooms, industrial and warehouse areas within an existing shell building. Project also includes exterior sitework. Straus Production Facility Rohnert Park, CA Construction of new a 50,000 SF organic dairy processing facility, as well as new office, restrooms, industrial and warehouse areas within an existing shell building. Project also includes exterior sitework. Services Provided: Architect of Record: Client: News: Construction Perkins, Williams & Cotterill Architects Straus Family Creamery None Completed 2021 Industrial Warehouse BACK TO PROJECTS
- Silicon Graphics, Inc. B900
100,000 SF tenant improvement within two 2-story shells. Project consists of open office, conference rooms, break rooms an all-hands training area, and first floor data center with perimeter support labs. Project also includes exterior skin and site modifications to add truck level and grade level loading dock for new shipping & receiving, as well as retrofit of existing trash enclosure into new mechanical service yard to serve data center. Silicon Graphics, Inc. B900 Milpitas, CA 100,000 SF tenant improvement within two 2-story shells. Project consists of open office, conference rooms, break rooms an all-hands training area, and first floor data center with perimeter support labs. Project also includes exterior skin and site modifications to add truck level and grade level loading dock for new shipping & receiving, as well as retrofit of existing trash enclosure into new mechanical service yard to serve data center. Services Provided: Architect of Record: Client: News: Construction ArcTec Aruba Hewlett Packard Enterprise Company None Completed 2018 Tenant Improvement Data Center Corporate BACK TO PROJECTS
- Stanford Highland Hall
This 143,713 SF student housing project consists of 101 contemporary style apartment units with 9,283 SF of basement space. The project consists of 3-story and 4-story Type V wood structures, which surround various themed courtyards and architectural components such as water features, artwork, boldly designed stairways, and an eclectic palette of feature walls. Amenities include a multi-purpose building, study areas, a well-appointed lobby lounge area, open air terraces for social and private activities, flex spaces, as well as dining/kitchen areas at each floor. There are also outdoor landscaped features within the courtyards, which include a BBQ, fireplaces, and water features. Stanford Highland Hall Stanford, CA This 143,713 SF student housing project consists of 101 contemporary style apartment units with 9,283 SF of basement space. The project consists of 3-story and 4-story Type V wood structures, which surround various themed courtyards and architectural components such as water features, artwork, boldly designed stairways, and an eclectic palette of feature walls. Amenities include a multi-purpose building, study areas, a well-appointed lobby lounge area, open air terraces for social and private activities, flex spaces, as well as dining/kitchen areas at each floor. There are also outdoor landscaped features within the courtyards, which include a BBQ, fireplaces, and water features. Services Provided: Architect of Record: Client: News: Construction Steinberg Architects, LEGORETTA Stanford University None https://www.archdaily.com/884098/highland-hall-residences-stanford-university-legorreta https://architizer.com/projects/stanford-university-gsb-highland-hall/ Completed 2016 Residential Education BACK TO PROJECTS
- East Palo Alto Corporate Center
This project features a 206,000 SF tenant improvement within a 4-story warm shell consisting of office and software lab functions, cafeteria and espresso bar, and training rooms. Interior design features many specialty finishes with focus on acoustical performance and employee collaboration spaces. The architecture takes advantage of a large central atrium with a 6,000 SF skylight, 4-story stair structure, and outdoor patios at top floor. Office space is primarily open plan with exposed systems, and specialty lighting and acoustical panels throughout. East Palo Alto Corporate Center East Palo Alto, CA This project features a 206,000 SF tenant improvement within a 4-story warm shell consisting of office and software lab functions, cafeteria and espresso bar, and training rooms. Interior design features many specialty finishes with focus on acoustical performance and employee collaboration spaces. The architecture takes advantage of a large central atrium with a 6,000 SF skylight, 4-story stair structure, and outdoor patios at top floor. Office space is primarily open plan with exposed systems, and specialty lighting and acoustical panels throughout. Services Provided: Architect of Record: Client: News: Construction IA Interior Architects Sobrato Development Companies LLC None Completed 2017 Tenant Improvement BACK TO PROJECTS
- Watsonville City Center Garage
Project Consists of 164,000 SF concrete, post-tensioned slab parking garage for the Redevelopment Agency of the City of Watsonville. The parking garage is six stories tall and boasts 455 stalls. Watsonville City Center Garage Watsonville, CA Project Consists of 164,000 SF concrete, post-tensioned slab parking garage for the Redevelopment Agency of the City of Watsonville. The parking garage is six stories tall and boasts 455 stalls. Services Provided: Architect of Record: Client: News: Construction Walker Parking City of Watsonville and Santa Cruz County None Completed 2005 Parking Structure BACK TO PROJECTS
- Western Digital Cal - 1
25,000 SF tenant improvement consisting of an executive suite featuring design/build MEP. Western Digital Cal - 1 Milpitas, CA 25,000 SF tenant improvement consisting of an executive suite featuring design/build MEP. Services Provided: Architect of Record: Client: News: Construction HTK Studio Western Digital None Completed 2025 Tenant Improvement Design-Build BACK TO PROJECTS
- Silver Springs Networks
This 150,000 SF tenant improvement featureslab spaces, a network operation control room, data server room, RF chambers, as well as two floors of Class A office space, full service kitchen and activated outdoor space. Silver Springs Networks San Jose, CA This 150,000 SF tenant improvement featureslab spaces, a network operation control room, data server room, RF chambers, as well as two floors of Class A office space, full service kitchen and activated outdoor space. Services Provided: Architect of Record: Client: News: Construction AP+I Design, Inc. Silver Springs Networks, Inc. None Completed 2016 Corporate Tenant Improvement BACK TO PROJECTS
- San Jose Civic Center Garage
Project consisting of one-level of below-grade parking, accommodating 650 vehicles. This parking garage services the San Jose Civic Center which houses the local San Jose government officials as well as general downtown San Jose parking. San Jose Civic Center Garage San Jose, CA Project consisting of one-level of below-grade parking, accommodating 650 vehicles. This parking garage services the San Jose Civic Center which houses the local San Jose government officials as well as general downtown San Jose parking. Services Provided: Architect of Record: Client: News: Construction Richard Meier and Partners City of San Jose None Completed 2005 Parking Structure BACK TO PROJECTS
- Joaquin Campus
This project consists of a 64,000 SF exterior skin remodel and tenant improvement project includes major demolition of exterior and interior of existing space in multiple phases. The first phase includes demolition of existing non-structural interior spaces and complete removal of an existing ductwork level and equipment level. The second phase includes major structural and exterior demolition and remodel of the existing structure and curtain wall. The third phase features a tenant improvement build out of all new office space, complete MEP system upgrade, a new cafe, and 2nd floor mezzanine to house a Tech Talk. The building is to be the most energy efficient building on the corporate Mountain View campus. Joaquin Campus Mountain View, CA This project consists of a 64,000 SF exterior skin remodel and tenant improvement project includes major demolition of exterior and interior of existing space in multiple phases. The first phase includes demolition of existing non-structural interior spaces and complete removal of an existing ductwork level and equipment level. The second phase includes major structural and exterior demolition and remodel of the existing structure and curtain wall. The third phase features a tenant improvement build out of all new office space, complete MEP system upgrade, a new cafe, and 2nd floor mezzanine to house a Tech Talk. The building is to be the most energy efficient building on the corporate Mountain View campus. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architects Confidential None Completed 2012 Corporate Tenant Improvement LEED Gold BACK TO PROJECTS
- 341 California
This 8,596 SF design/build two-story remodel project includes restaurant use on the first floor and office use on the second floor. The project improvements to the building, which was originally built in 1955, include removal of existing asbestos, replacement of old mechanical/electrical/plumbing equipment with modern systems, new energy efficient glazing system windows, installation of structural/seismic improvements, and a new energy efficient white roof to improve the seismic stability of the building. Project also features upgraded restrooms and entries to improve accessibility, exterior paint, replacement of sunscreens and additional exterior landscaping. The renovation improves the safety, energy efficiency and the appearance of the existing building. In addition, there are also (ADA) accessibility improvements consisting of the new stairs and restrooms, access from the public way, as well as a fire sprinkler system. 341 California Palo Alto, CA This 8,596 SF design/build two-story remodel project includes restaurant use on the first floor and office use on the second floor. The project improvements to the building, which was originally built in 1955, include removal of existing asbestos, replacement of old mechanical/electrical/plumbing equipment with modern systems, new energy efficient glazing system windows, installation of structural/seismic improvements, and a new energy efficient white roof to improve the seismic stability of the building. Project also features upgraded restrooms and entries to improve accessibility, exterior paint, replacement of sunscreens and additional exterior landscaping. The renovation improves the safety, energy efficiency and the appearance of the existing building. In addition, there are also (ADA) accessibility improvements consisting of the new stairs and restrooms, access from the public way, as well as a fire sprinkler system. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction Cal Partners None Completed 2014 Tenant Improvement BACK TO PROJECTS
- Milpitas East Parking Garage
125,000 SF parking structure consisting of four levels with parking for 281 vehicles. The garage is a poured in place, post tension, beam and slab structure. The structure also includes space for a future restroom, which will be utilized by the new library. This project will also consists of minor office space, a janitor's room, an electrical and telecommunications room and sitework. Milpitas East Parking Garage Milpitas, CA 125,000 SF parking structure consisting of four levels with parking for 281 vehicles. The garage is a poured in place, post tension, beam and slab structure. The structure also includes space for a future restroom, which will be utilized by the new library. This project will also consists of minor office space, a janitor's room, an electrical and telecommunications room and sitework. Services Provided: Architect of Record: Client: News: Construction Chong Partners Architect City of Milpitas None Completed 2007 Parking Structure BACK TO PROJECTS












