top of page
Devcon_Logo_wTaglines.png

Search Results

384 results found with an empty search

  • Campo di Bocce Fremont

    This project consists of a 43,564 SF interior remodel of an existing sports complex consisting of new interior bocce courts, full remodel of an interior pavilion structure, new meeting room, as well as a reception desk. Project features suspended light trellises, trophy case, banquette seating and a full kitchen and equipment remodel. Campo di Bocce Fremont Fremont, CA This project consists of a 43,564 SF interior remodel of an existing sports complex consisting of new interior bocce courts, full remodel of an interior pavilion structure, new meeting room, as well as a reception desk. Project features suspended light trellises, trophy case, banquette seating and a full kitchen and equipment remodel. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Campo di Bocce None Completed 2016 Athletic Center Retail BACK TO PROJECTS

  • Sequoia Belle Haven

    This 78,760 SF building features a 3-story, Type V-A, wood framed slab on grade. The complex consists of 90 affordable senior housing apartment units with service facilities at the ground floor. Project also consists of a 2-story open air community room, bike storage, laundry rooms, meeting rooms and exercise room. This project includes a fast track 11 month schedule due to federal requirements that displaced residents from the previous complex; residents needed to be moved back in within one year. Sequoia Belle Haven Foster City, CA This 78,760 SF building features a 3-story, Type V-A, wood framed slab on grade. The complex consists of 90 affordable senior housing apartment units with service facilities at the ground floor. Project also consists of a 2-story open air community room, bike storage, laundry rooms, meeting rooms and exercise room. This project includes a fast track 11 month schedule due to federal requirements that displaced residents from the previous complex; residents needed to be moved back in within one year. Services Provided: Architect of Record: Client: News: Construction Mithun MidPen Housing Corporation None Completed 2017 Residential BACK TO PROJECTS

  • Plantronics Back Lot

    This project consists of construction of a new park facility consisting of a BBQ, and BBQ trellis area with stone pavers, new soccer field and trellis, bocce courts, horseshoe pit and basketball court. The project also features parking lot renovation with vine screen, fruit orchard, yoga yurt, and meandering pathways with site lighting. Plantronics Back Lot Santa Cruz, CA This project consists of construction of a new park facility consisting of a BBQ, and BBQ trellis area with stone pavers, new soccer field and trellis, bocce courts, horseshoe pit and basketball court. The project also features parking lot renovation with vine screen, fruit orchard, yoga yurt, and meandering pathways with site lighting. Services Provided: Architect of Record: Client: News: Construction NA Plantronics None Completed 2016 Tenant Improvement BACK TO PROJECTS

  • Royal Presidio

    Historical restoration of the first stone building and first cathedral in California. 4,500 SF project includes removal of the exterior plaster, stone de-pointing and re-pointing, steel pin and rod containment, re-plastering of the exterior and full interior restoration. Royal Presidio Monterey, CA Historical restoration of the first stone building and first cathedral in California. 4,500 SF project includes removal of the exterior plaster, stone de-pointing and re-pointing, steel pin and rod containment, re-plastering of the exterior and full interior restoration. Services Provided: Architect of Record: Client: News: Construction Franks Brenkwitz + Associates Diocese of Monterey None Completed 2008 Historical Tenant Improvement BACK TO PROJECTS

  • Castro Station

    This 49,000 SF 3-story office building consists of steel structure above a 103,000 SF, three level below grade poured-in-place concrete parking structure. Shoring is a beam and lagging with tie back system, and excavation includes contaminated soil and contaminated ground water. The building is a warm shell and includes sitework and infrastructure improvements. Project features glass and aluminum window assemblies, curtain wall assemblies, corrugated metal panels, plaster over metal stud, and a standing seam metal roof. Castro Station Mountain View, CA This 49,000 SF 3-story office building consists of steel structure above a 103,000 SF, three level below grade poured-in-place concrete parking structure. Shoring is a beam and lagging with tie back system, and excavation includes contaminated soil and contaminated ground water. The building is a warm shell and includes sitework and infrastructure improvements. Project features glass and aluminum window assemblies, curtain wall assemblies, corrugated metal panels, plaster over metal stud, and a standing seam metal roof. Services Provided: Architect of Record: Client: News: Construction Chang Architecture, Inc. SFF Castro Station, LLC None Completed 2014 Corporate LEED Gold BACK TO PROJECTS

  • 1700 Dell

    Project consisting of 170,000 SF, 4-story Class A commercial office building. The project also features a 160,000 SF 5-story above grade with 1-story below grade parking structure to house 503 vehicles. 1700 Dell Campbell, CA Project consisting of 170,000 SF, 4-story Class A commercial office building. The project also features a 160,000 SF 5-story above grade with 1-story below grade parking structure to house 503 vehicles. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Dollinger Dell Associates None Completed 2024 Corporate Design-Build BACK TO PROJECTS

  • Harmonic

    This 188,000 SF tenant improvement build-out of existing cold shell was originally designed and constructed by Devcon. Architectural upgrades include new finishes throughout, partition and ceiling work to accommodate acoustical concerns, restroom cores for future offices, and a new employee entry area. Structural upgrades include modifications to the existing structure to accommodate new rooftop mechanical systems, new lobby and central stairwells, and an exterior shipping and storage shed. Mechanical, electrical, and plumbing upgrades include new rooftop DX boxcar mechanical units, new ALC control system, 800 kW emergency generator, 600 kVA flywheel UPS, interior and exterior lighting, HHW and DHW skids, NG, condensate, and CDA systems, to serve a variety of areas including lab space, server/IDF/MDF areas, open office, private offices, warehouse, café, and gym. Harmonic San Jose, CA This 188,000 SF tenant improvement build-out of existing cold shell was originally designed and constructed by Devcon. Architectural upgrades include new finishes throughout, partition and ceiling work to accommodate acoustical concerns, restroom cores for future offices, and a new employee entry area. Structural upgrades include modifications to the existing structure to accommodate new rooftop mechanical systems, new lobby and central stairwells, and an exterior shipping and storage shed. Mechanical, electrical, and plumbing upgrades include new rooftop DX boxcar mechanical units, new ALC control system, 800 kW emergency generator, 600 kVA flywheel UPS, interior and exterior lighting, HHW and DHW skids, NG, condensate, and CDA systems, to serve a variety of areas including lab space, server/IDF/MDF areas, open office, private offices, warehouse, café, and gym. Services Provided: Architect of Record: Client: News: Construction Interior Architects Harmonic None Completed 2010 Corporate Tenant Improvement BACK TO PROJECTS

  • 675 Almanor

    Project consists of demolition to one existing building and new construction of a 4-story Class A commercial office building approximately 149,998 SF, with retail on the first floor. The project also consists of a 5-story concrete parking structure at 112,261 SF, providing 371 parking stalls. The exterior features a rooftop terrace, outside patio and a workout area/gym within the project landscaping. 675 Almanor Sunnyvale, CA Project consists of demolition to one existing building and new construction of a 4-story Class A commercial office building approximately 149,998 SF, with retail on the first floor. The project also consists of a 5-story concrete parking structure at 112,261 SF, providing 371 parking stalls. The exterior features a rooftop terrace, outside patio and a workout area/gym within the project landscaping. Services Provided: Architect of Record: Client: News: Construction Chang Architecture Dollinger Properties None Completed 2020 Corporate LEED Gold Retail BACK TO PROJECTS

  • Tire Rack Warehouse & Office

    This 287,040 SF design/build cast-in-place concrete tilt-up warehouse expansion features a 1,400 SF office expansion and warehouse improvements including 7” slab-on-grade, 8” thick concrete tilt-up panel walls, exterior storefront glazing & clerestory windows, panelized roof structure, 1% skylight coverage, 60 mil TPO roofing over R-19 rigid insulation, LED warehouse lighting, warehouse restrooms, six dock positions complete with dock equipment, and four added battery charging stations. Project also includes associated site improvements for truck courts and trailer parking stalls with an on-site detention basin. Tire Rack Warehouse & Office Sparks, NV This 287,040 SF design/build cast-in-place concrete tilt-up warehouse expansion features a 1,400 SF office expansion and warehouse improvements including 7” slab-on-grade, 8” thick concrete tilt-up panel walls, exterior storefront glazing & clerestory windows, panelized roof structure, 1% skylight coverage, 60 mil TPO roofing over R-19 rigid insulation, LED warehouse lighting, warehouse restrooms, six dock positions complete with dock equipment, and four added battery charging stations. Project also includes associated site improvements for truck courts and trailer parking stalls with an on-site detention basin. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. MEPT USA Parkway Distribution Center LLC None Completed 2019 Industrial Center Design-Build LEED V4 Certified BACK TO PROJECTS

  • Shoreline Corporate Campus

    595,000 SF project consisting of a two-story steel structure on an 800,000 SF site. The project features office, amenity, central plant and parking accommodations enclosed by a canopy roof structure with semi-circular clerestories and photovoltaic panels. The second level consists of interconnected tabular floorplates with differing elevations. Interior improvements include open office space, conference rooms, food service, and fitness areas. 595,000 SF interior improvements primarily on two floors, inside an iconic structure with curved/segmented roof canopy. Project includes five cafeterias, full studio event presentation space, fitness center, 200,000 SF of meeting/collaboration spaces, and 275,000 SF of open office on raised access floor. The interior design is a prototype for future company improvements, with majority of work as custom construction. Shoreline Corporate Campus Mountain View, CA 595,000 SF project consisting of a two-story steel structure on an 800,000 SF site. The project features office, amenity, central plant and parking accommodations enclosed by a canopy roof structure with semi-circular clerestories and photovoltaic panels. The second level consists of interconnected tabular floorplates with differing elevations. Interior improvements include open office space, conference rooms, food service, and fitness areas. 595,000 SF interior improvements primarily on two floors, inside an iconic structure with curved/segmented roof canopy. Project includes five cafeterias, full studio event presentation space, fitness center, 200,000 SF of meeting/collaboration spaces, and 275,000 SF of open office on raised access floor. The interior design is a prototype for future company improvements, with majority of work as custom construction. Services Provided: Architect of Record: Client: News: Construction Bjarke Ingels Group Confidential None Completed 2023 Corporate Tenant Improvement Living Building Challenge BACK TO PROJECTS

  • Lawson Lane East

    This 593,276 SF design/build campus consists of two 5-story and one 2-story structural steel buildings with one 5-story parking garage. Project features re-design of the exterior skin system to become a combination of glass and precast, as well as extensive site work. Lawson Lane East Santa Clara, CA This 593,276 SF design/build campus consists of two 5-story and one 2-story structural steel buildings with one 5-story parking garage. Project features re-design of the exterior skin system to become a combination of glass and precast, as well as extensive site work. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. The Sobrato Organization None https://www.bizjournals.com/sanjose/news/2020/10/12/servicenow-santa-clara-campus-expansion.html Completed 2013 Corporate Design-Build LEED Gold BACK TO PROJECTS

  • Stanford Federal Credit Union

    This 1,200 SF design/ build tenant improvement established the Stanford Credit Union presence on the Stanford Redwood City Campus. The project consists of exterior precast modifications, high security protocols, ATM, and bank equipment integration and installation. Stanford Federal Credit Union Redwood City, CA This 1,200 SF design/ build tenant improvement established the Stanford Credit Union presence on the Stanford Redwood City Campus. The project consists of exterior precast modifications, high security protocols, ATM, and bank equipment integration and installation. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Stanford Federal Credit Union None Completed 2019 Banking / Finance Tenant Improvement Design-Build BACK TO PROJECTS

bottom of page