  • Plantronics Executive Briefing Center

    Plantronics Executive Briefing Center Santa Cruz, CA This 7,500 SF tenant improvement for the new executive briefing center consists of new lobby, reception desk, lounge, catering facility, and large conference rooms, as well as small conference rooms. Project also features terrazzo floors, new exterior storefronts, AV visual displays, plasma screens, and historical device displays. Services Provided: Architect of Record: Client: News: Construction Gensler Plantronics None Completed 2014 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • Quadrus

    Quadrus Menlo Park, CA This project consists of demolition of an existing 3-story office building to house a 33,127 SF 2-story office building on a 17,099 SF concrete podium over a parking garage. The project is a warm shell and features bathroom cores, office space, sitework with landscaping, and 58 parking stalls. Project also consists of an elevated concrete slab, concrete foundation walls and columns, complex shoring, retaining walls, glass and aluminum window assemblies, balconies and concrete patios, plaster and stone exterior veneer. Services Provided: Architect of Record: Client: News: Construction Robert Remiker Architect DivcoWest None Completed 2014 Corporate ​ ​ BACK TO PROJECTS

  • 1201 Tennessee

    1201 Tennessee San Francisco, CA The 235,000 SF design/build apartment complex consists of 263 units and 1,840 SF of retail space. The project consists of six stories and a mezzanine. The parking lot houses 147 vehicles and 273 bikes. Amenities include a tech room, bike shop, fitness room, clubhouse kitchen and bar, outdoor landscaped courtyard with BBQ and fireplace, and a community roof deck with views of the bay. This project is Green Point Rated. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. AGI Avant, Inc None Completed 2017 Residential Design-Build Green Point Rated BACK TO PROJECTS

  • SCU Steve Schott Stadium

    SCU Steve Schott Stadium Santa Clara, CA NCAA Division I baseball stadium comprised of ball field and approximately 20,000 SF of building space. The playing field, which measures 400 feet to center field, uses a slit-sand system for drainage. Both chair backs and bleachers are provided to accommodate 1,500 spectators. Locker rooms, showers, and a trainer's area make up both the home and visiting team locker buildings. In addition, the home team locker room features a team room equipped for live game feeds, team meetings, and press conferences. The VIP building houses both a luxury box and a press box. A concession/ticket building and a hitting center make up the last two buildings onsite. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2005 Athletic Center ​ ​ BACK TO PROJECTS

  • Berkeley Commons

    Berkeley Commons Berkeley, CA This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Services Provided: Architect of Record: Client: News: Construction Gensler Lane Partners None In Progress Commercial LEED Gold ​ BACK TO PROJECTS

  • Aruba Networks

    Aruba Networks Santa Clara, CA This 235,000 SF project consists of tenant improvement to five levels of the six stories at Building D, first floor of the adjacent Building C, and a Central Utility Plant. The project consists of new lab spaces, office space, collaboration spaces, executive briefing center and client experience center. The project also features a full cafeteria on the first floor of Building D. Work includes all infrastructure to connect both new tenant improvements to the Central Utility Plant located between the two new spaces. Services Provided: Architect of Record: Client: News: Construction Arctec Aruba Networks None Completed 2016 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • 550 High Street

    550 High Street Palo Alto, CA This design/build mixed-use building is located in downtown Palo Alto, CA. The project consists of a 4-story above grade cast-in-place concrete and structural steel building totaling 26,870 SF and includes a 3-story basement parking garage totaling 25,800 SF. The fourth floor features a 4,850 SF high-end residential penthouse with a 1,330 SF outdoor patio/terrace area. The basement is constructed using a soldier beam and tieback shoring system with underpinning of adjacent structures. The exterior skin of the building includes insulated glass systems, laminated glass systems, decorative aluminum elements, mechanically anchored large format limestone, smooth plaster, and lighting elements. The project also consists of finished restroom cores, lobbies in the basement parking garage, and a lobby at the ground floor. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Hamilton and High, LLC None Completed 2016 Retail Residential Design-Build BACK TO PROJECTS

  • Gateway Family Housing

    Gateway Family Housing Menlo Park, CA 160,716 SF project consisting of 140 residential units in a Type VA fully sprinklered building, with associated common areas and on grade parking within a 4-acre site. The building features 3-4 story wood-framed buildings comprised of 66 one-bedroom units, 50 two-bedroom units and 24 three-bedroom units; one of the two-bedroom units is reserved for an on-site manager. Parking includes 177 surface parking spaces, which consists of 15 handicap spaces and 14 EV charging spaces. Site work features new asphalt parking areas, concrete plaza areas, pathways, bioswales and plantings, and relocation of utilities within the existing frontage road. This building is designed as a 100% electric efficient building. Services Provided: Architect of Record: Client: News: Construction Mithun MidPen Housing Corp. None Completed 2023 Residential 140 Units 100% Electric Efficient BACK TO PROJECTS

  • Cisco Creativity Zones

    Cisco Creativity Zones San Jose, CA This design/build project consists of community rooms with video games, arcade games and touch screens. The 1st floor creativity zone features a video game theme while the 2nd floor has a comic book theme. Rooms are located in the building where the Cisco employees can take a break from their daily activities but also keep their minds engaged. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Cisco Systems, Inc. None Completed 2014 Corporate Tenant Improvement Design-Build BACK TO PROJECTS

  • Harmonic

    Harmonic San Jose, CA This 188,000 SF tenant improvement build-out of existing cold shell was originally designed and constructed by Devcon. Architectural upgrades include new finishes throughout, partition and ceiling work to accommodate acoustical concerns, restroom cores for future offices, and a new employee entry area. Structural upgrades include modifications to the existing structure to accommodate new rooftop mechanical systems, new lobby and central stairwells, and an exterior shipping and storage shed. Mechanical, electrical, and plumbing upgrades include new rooftop DX boxcar mechanical units, new ALC control system, 800 kW emergency generator, 600 kVA flywheel UPS, interior and exterior lighting, HHW and DHW skids, NG, condensate, and CDA systems, to serve a variety of areas including lab space, server/IDF/MDF areas, open office, private offices, warehouse, café, and gym. Services Provided: Architect of Record: Client: News: Construction Interior Architects Harmonic None Completed 2010 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • San Francisco 49ers Training Facility

    San Francisco 49ers Training Facility Santa Clara, CA Two-story 50,000 SF main building (training facility and administration offices) with separate maintenance/ racquetball building, and related sitework including three practice fields. Services Provided: Architect of Record: Client: News: Construction H.O.K. Sports Division SF 49ers None Completed 1987 Athletic Center ​ ​ BACK TO PROJECTS

  • Scout Capital

    Scout Capital Palo Alto, CA Project includes a 7,800 SF high-end tenant improvement on the 2nd and 3rd floor of an existing building on University Avenue. Project features exposed concrete and steel structure, exposed mechanical, electrical and plumbing systems, polished concrete floors, PK-30 glass, office fronts and doors, clear finished maple millwork and acoustical panels throughout. Office space consists of telepresence room, multiple break rooms which features perforated aluminum panels, conference rooms, shared offices, hard wall offices and restrooms. Services Provided: Architect of Record: Client: News: Construction The Hayes Group Scout Capital None Completed 2013 Corporate Tenant Improvement ​ BACK TO PROJECTS