top of page

Search Results

363 items found for ""

  • Perenn Bakery

    Perenn Bakery Reno, NV Project includes a 3677 SF tenant improvement for a local French Bakery. Custom millwork is installed through out with two viewing areas to watch employees making pastries/bread. The bakery includes a coffee bar and outdoor patio seating. Exposed concrete floors with wood base, brass fixtures and custom pastry display cases. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Tolles Development Company None Completed 2021 Tenant Improvement Retail Design-Build BACK TO PROJECTS

  • Bellarmine Lorry I. Lokey Academic Center

    Bellarmine Lorry I. Lokey Academic Center San Jose, CA This 53,000 SF project consists of a 2-story steel frame and concrete structure. The building features (27) classrooms, (2) multi-purpose rooms, a Learning Resource Center, and a Faculty Lounge complete with offices, meeting rooms, and a kitchen. The project also includes the demolition of the existing building and the installation of approximately (20) portables for use during construction. Services Provided: Architect of Record: Client: News: Construction Steinberg Hart Bellarmine College Preparatory None Completed 2011 Education LEED Gold ​ BACK TO PROJECTS

  • Greenwood Commerce Center

    Greenwood Commerce Center Napa, CA Project consists of a 226,000 SF concrete tilt-up building with a composite roof structure and Vulcraft truss joists, as well as a 78,000 SF concrete tilt-up building on a 19 acre site in Napa County. The project includes bio-retention for storm water, wetlands monitoring for a riparian creek that runs through the center of the site, a left-hand turn lane on Airport Blvd. and a reclaimed water line installation. Both buildings feature TPO roof systems with 5.5” of insulation. Additionally, both buildings are fitted with “Night Air Cooling” and are prepped for cased storage users. Both buildings also include loading docks, insulated, powered roll up doors, and are equipped with ESFR ready fire sprinkler systems. Services Provided: Architect of Record: Client: News: Construction RMW Architecture & Interiors New York Life Investment Management LLC None Completed 2015 Industrial Center ​ ​ BACK TO PROJECTS

  • Plantronics Cafe Expansion

    Plantronics Cafe Expansion Santa Cruz, CA This project consists of a 17,000 SF tenant improvement of the existing kitchen and garden area patio. Project features complete upgrade to kitchen equipment, fire service upgrade into the building, expansion of the walk thru breezeway, and complete landscape patio upgrade. Services Provided: Architect of Record: Client: News: Construction Gensler Plantronics None Completed 2016 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • USF Student Residence

    USF Student Residence San Francisco, CA This project features construction of two new Student Housing buildings at the University’s Lone Mountain campus. Both buildings are wood framed construction over concrete parking garage/podium. The West building is 110,760 SF and consists of five stories over a 1-story parking garage; this building provides 71 dormitory units, as well as amenity spaces. The East building is 123,690 SF and consists of four stories over a 1-story parking garage; this building provides 84 dormitory units, classrooms and amenity spaces. There are 156 parking spaces combined between the two buildings. Services Provided: Architect of Record: Client: News: Construction MVE + Partners The Sobrato Organization None Completed 2021 Residential Education ​ BACK TO PROJECTS

  • SCU Leavey Center

    SCU Leavey Center Santa Clara, CA 65,000 SF renovation of intercollegiate basketball/volleyball center including new curtain wall, new roof, new HVAC lighting, wood floor, bleachers and state of the art scoreboard system. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 1997 Education ​ ​ BACK TO PROJECTS

  • Tasman Campus Building 2

    Tasman Campus Building 2 San Jose, CA 4-story tenant improvement, MEP upgrade and exterior remodel within a 184,000 SF building featuring a new 1st floor full-service café and associated dining, 2nd floor lab space consisting of RF chambers and specialty bench labs, as well as a full interior remodel of open office, central core support areas and restrooms. Project includes complete replacement of HVAC infrastructure which complements new building design requirements. The exterior scope consists of refresh and refinish of existing Exterior Insulation Finish System (EIFS) and code mandated ADA upgrades. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture Confidential None Completed 2022 Tenant Improvement Corporate ​ BACK TO PROJECTS

  • Rosewood Hotel & Spa

    Rosewood Hotel & Spa Menlo Park, CA This 175,000 SF 5-star hotel features a 16,000 SF spa facility, 18 guest buildings scattered throughout the site, including a presidential suite building and four villa buildings which will be for sale buildings. Project also consists of a restaurant, bar, meeting room, ballroom, library and pre-function areas. Services Provided: Architect of Record: Client: News: Construction Hill Glazier Studio, BAMO Stanford Management Company None https://www.rosewoodhotels.com/en/sand-hill-menlo-park/media/press/2020/us-news-and-world-report Completed 2009 Hotel / Resort ​ ​ BACK TO PROJECTS

  • Edwards Theatre

    Edwards Theatre Boise, ID On an adjacent block to the Boise Downtown development project, the development calls for a multi-use building including, retail, cinema and office space. The entire project features renovations to four city blocks in the historical section of downtown Boise. The building is connected to a highly significant historical building, which was renovated in conjunction to the four block developments. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. BoDo Partners LLC None Completed 2006 Retail Design-Build Historical BACK TO PROJECTS

  • 490 Mathilda

    490 Mathilda Sunnyvale, CA The project includes a new commercial three-story office building with CLT (Cross-Laminated Mass Timber Structural system) and a mechanical penthouse with 2.5 levels of below grade parking. The building will include useable outdoor areas on parking podium, second, third and roof top levels. The parking areas may contain tandem, valet, and/or mechanical lift / stacking systems. Services Provided: Architect of Record: Client: News: Design, Construction Pickard Chilton Architects, Inc. The Minkoff Group None In Progress Commercial Design-Build Goal: LEED Gold BACK TO PROJECTS

  • Stanford Auxiliary Library 3.2

    Stanford Auxiliary Library 3.2 Livermore, CA This project includes the renovation of an additional 35,542 SF to existing the 38,000 SF library. The project includes a 23,511 SF book storage facility in three 7,737 square foot fire separated storage modules that are temperature and humidity controlled environment in mezzanines with in the modules. The module structure consists of pre-stressed precast colored and exposed aggregate concrete panel, fireproofed steel structure and in-rack pre-action fire sprinkler system. The process office expansion is 9,300 SF and consists of exposed CMU walls, curtain wall window system and clerestory glass exterior skin. Process office space also consists of temperature controlled film storage room, break room expansion, restrooms, offices and book scanning rooms. Site work includes expansion of parking lot, loop access road, landscape areas, patio, and a storm drain system to meet current C3 requirement. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Stanford University None Completed 2013 Data Center Design-Build ​ BACK TO PROJECTS

  • Prologis Sage Point 8

    Prologis Sage Point 8 Reno, NV Mass grading and site improvements on 12.5 acres with construction of a 259,740 SF, 32’ clear height, shell concrete tilt-up building, with a fire pump house including two diesel fired generators. Project includes tenant improvements for Continental Tire, for tire storage to 30’ throughout a fully racked and lighted warehouse, 4,000 SF of office improvements, (26) dock positions with electrically operated dock equipment, either forklift battery charging stations, and a fully fenced site with automatic gates and a guardhouse. Services Provided: Architect of Record: Client: News: Construction Tectonics Design Group Prologis None Completed 2021 Tenant Imrovement Sustainable ​ BACK TO PROJECTS

bottom of page