Search Results
384 results found with an empty search
- Makita USA Distribution Center
This design/build project consists of two concrete tilt-up buildings, a 594,000 SF distribution center with a 36’ clear height and a 28,800 SF training center. Project includes 52,000 SF of interior office area improvements and full warehouse improvements for LED warehouse lighting, 1% skylight coverage, clerestory windows, warehouse ventilation & heating, (20) forklift battery chargers, (42) dock positions with dock equipment, an 11,000 SF office mezzanine, and a 10,000 SF pick module mezzanine, and an ESFR fire sprinkler system. Site work consists of moving 400,000 CY of dirt over 47 acres for a balanced site with 12,000 SF of keystone retaining walls and 3,200 SF of rockery retaining walls and over three acres of on-site retention basins 35’ deep. Project features fully landscaped and fenced site that includes offsite improvements for added sidewalk, bike lane, and bringing gas & power to the site. Makita USA Distribution Center Reno, NV This design/build project consists of two concrete tilt-up buildings, a 594,000 SF distribution center with a 36’ clear height and a 28,800 SF training center. Project includes 52,000 SF of interior office area improvements and full warehouse improvements for LED warehouse lighting, 1% skylight coverage, clerestory windows, warehouse ventilation & heating, (20) forklift battery chargers, (42) dock positions with dock equipment, an 11,000 SF office mezzanine, and a 10,000 SF pick module mezzanine, and an ESFR fire sprinkler system. Site work consists of moving 400,000 CY of dirt over 47 acres for a balanced site with 12,000 SF of keystone retaining walls and 3,200 SF of rockery retaining walls and over three acres of on-site retention basins 35’ deep. Project features fully landscaped and fenced site that includes offsite improvements for added sidewalk, bike lane, and bringing gas & power to the site. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Prologis None Completed 2020 Industrial Center Design-Build BACK TO PROJECTS
- NetApp Buildings 2 & 3
This project includes the construction of two 3-story structural steel buildings with precast and glass curtain wall of approximately 280,000 SF, including associated site work, complete loading dock, full cafeteria, patio seating and fountain landscaping. 32,000 SF conversion of the first floor of an existing three story office building to a Computer Lab / Data Center housing 720 server cabinets with an average power load of 8kW/cabinet. Project included a new dedicated 12kV electrical service; overhead busbar power distribution; high efficiency transformers and rotary UPS systems; (4) new dual cell cooling towers on the building’s roof; (4) 590 ton chillers in a new dedicated chiller enclosure building; variable primary only CHW distribution; and (22) custom air handlers feeding pressurized “cold aisles” with 100% air side economizer implementation. Energy efficiency measures implemented resulted in an average PUE of 1.3. With this project, Network Appliance was recognized for its continued environmental stewardship to improve its energy efficiency, conserve resources, and reduce waste. The company was presented with a check for roughly $1.4 million by Pacific Gas and Electric Company under PG&E's Non-Residential New Construction Program, which encourages PG&E's commercial, industrial, high-technology, and agricultural customers to implement energy-efficient building and process design and construction; at the time, this rebate was the largest new construction incentive PG&E had ever awarded. NetApp Buildings 2 & 3 Sunnyvale, CA This project includes the construction of two 3-story structural steel buildings with precast and glass curtain wall of approximately 280,000 SF, including associated site work, complete loading dock, full cafeteria, patio seating and fountain landscaping. 32,000 SF conversion of the first floor of an existing three story office building to a Computer Lab / Data Center housing 720 server cabinets with an average power load of 8kW/cabinet. Project included a new dedicated 12kV electrical service; overhead busbar power distribution; high efficiency transformers and rotary UPS systems; (4) new dual cell cooling towers on the building’s roof; (4) 590 ton chillers in a new dedicated chiller enclosure building; variable primary only CHW distribution; and (22) custom air handlers feeding pressurized “cold aisles” with 100% air side economizer implementation. Energy efficiency measures implemented resulted in an average PUE of 1.3. With this project, Network Appliance was recognized for its continued environmental stewardship to improve its energy efficiency, conserve resources, and reduce waste. The company was presented with a check for roughly $1.4 million by Pacific Gas and Electric Company under PG&E's Non-Residential New Construction Program, which encourages PG&E's commercial, industrial, high-technology, and agricultural customers to implement energy-efficient building and process design and construction; at the time, this rebate was the largest new construction incentive PG&E had ever awarded. Services Provided: Architect of Record: Client: News: Construction NA Network Appliance None Completed 2000 Corporate BACK TO PROJECTS
- 500 Santana Row
This 501,500 SF project consists of a 230,000 SF, 6-story reinforced concrete warm shell office tower and a 270,000 SF, 4-level below grade parking garage accommodating 672 vehicles and 1,500 SF of retail space. The skin features a combination of glass curtain wall, glass storefront, wood windows with wood fins, GFRC with punched windows, and exposed concrete. 500 Santana Row San Jose, CA This 501,500 SF project consists of a 230,000 SF, 6-story reinforced concrete warm shell office tower and a 270,000 SF, 4-level below grade parking garage accommodating 672 vehicles and 1,500 SF of retail space. The skin features a combination of glass curtain wall, glass storefront, wood windows with wood fins, GFRC with punched windows, and exposed concrete. Services Provided: Architect of Record: Client: News: Construction WRNS Studio Federal Realty Investment Trust None Completed 2016 Corporate BACK TO PROJECTS
- St. Ignatius Pavilion
Construction of new aluminum framed stadium bleachers and landings consisting of 1,200 seats, as well as a new 3 - level modular press box structure over existing stepped concrete area at home field side of school’s football stadium. St. Ignatius Pavilion San Francisco, CA Construction of new aluminum framed stadium bleachers and landings consisting of 1,200 seats, as well as a new 3 - level modular press box structure over existing stepped concrete area at home field side of school’s football stadium. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. St. Ignatius College Preparatory None Completed 2011 Education Design-Build BACK TO PROJECTS
- George P. Shultz Building
55,570 SF new 4-story steel office building over basement for the Hoover Institute at Stanford University. The new building replaces the existing Lou Henry Hoover Building and includes connections to the existing Herbert Hoover Memorial Tower. The new building façade is predominantly precast concrete and stone with glass, metal panels, and a clay tile roof to tie into the surrounding architecture. Interior finishes feature offices, a digitization studio, assembly spaces and the new Annenberg Conference Room. George P. Shultz Building Stanford, CA 55,570 SF new 4-story steel office building over basement for the Hoover Institute at Stanford University. The new building replaces the existing Lou Henry Hoover Building and includes connections to the existing Herbert Hoover Memorial Tower. The new building façade is predominantly precast concrete and stone with glass, metal panels, and a clay tile roof to tie into the surrounding architecture. Interior finishes feature offices, a digitization studio, assembly spaces and the new Annenberg Conference Room. Services Provided: Architect of Record: Client: News: Construction Cody Anderson Wasney Architects Stanford University None Completed 2024 Education Stanford University BACK TO PROJECTS
- SGI Crittenden Offsite Improvements
Crittenden Pump Station and Inlet Piping Project: Construction of a storm water pump station and its associated inlet piping. The pump station project consists of a reinforced concrete wet-well, a reinforced masonry building containing three (3) major pumps, two (2) minor pumps, electrical and mechanical works, a detention pond and all discharge piping. The inlet piping project consists of installing 2,000 feet of HDPE pipe. Crittenden Off Site Design Management: Devcon Construction acted as the managing consultant for all off-site design for the Crittenden off-site projects including Crittenden Pump Station, Crittenden Inlet Piping, Crittenden Lane / North Road Improvement Project, and Crittenden Landfill Landscaping Project. Using architectural and engineering consultants, Devcon established a design team for each project and acted as the managing agent in the design process between the consultants, developer, City of Mountain View and other government agencies. Crittenden Lane/North Road Improvement Project: The North Road project includes the construction of a new raised roadway with concrete curbs, underground utilities, fiber-optic conduit bank and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting, and fiber-optic system. North Access Road And Crittenden Lane Improvement Project: This project includes the construction of a new raised roadway with concrete curbs, underground utilities and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting and a joint utility trench. SGI/City Of Mountain View Offsite Work: This project along North Charleston Road and Amphitheatre Parkway includes meandering walks, parking lot landscaping and underground work. SGI Crittenden Offsite Improvements Mountain View, CA Crittenden Pump Station and Inlet Piping Project: Construction of a storm water pump station and its associated inlet piping. The pump station project consists of a reinforced concrete wet-well, a reinforced masonry building containing three (3) major pumps, two (2) minor pumps, electrical and mechanical works, a detention pond and all discharge piping. The inlet piping project consists of installing 2,000 feet of HDPE pipe. Crittenden Off Site Design Management: Devcon Construction acted as the managing consultant for all off-site design for the Crittenden off-site projects including Crittenden Pump Station, Crittenden Inlet Piping, Crittenden Lane / North Road Improvement Project, and Crittenden Landfill Landscaping Project. Using architectural and engineering consultants, Devcon established a design team for each project and acted as the managing agent in the design process between the consultants, developer, City of Mountain View and other government agencies. Crittenden Lane/North Road Improvement Project: The North Road project includes the construction of a new raised roadway with concrete curbs, underground utilities, fiber-optic conduit bank and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting, and fiber-optic system. North Access Road And Crittenden Lane Improvement Project: This project includes the construction of a new raised roadway with concrete curbs, underground utilities and site lighting. Also included in the project is the addition of two new traffic lanes to Crittenden Lane including a landscaped median, underground utilities, concrete curbs and sidewalk, site landscaping and irrigation, site lighting and a joint utility trench. SGI/City Of Mountain View Offsite Work: This project along North Charleston Road and Amphitheatre Parkway includes meandering walks, parking lot landscaping and underground work. Services Provided: Architect of Record: Client: News: Construction Silicon Graphics, Inc. None Completed 2001 Infrastructure BACK TO PROJECTS
- Sequioa Capital Menlo Park - Heritage Remodel
10,000 SF high-end tenant improvement of a venture capital office consisting of new executive offices, library, reception area, breakroom, open office with wood ceiling and conference rooms completed in an occupied building. Finishes include casework, architectural wood slat wall, fabric wrapped panels, and specialty carpet. Sequioa Capital Menlo Park - Heritage Remodel Menlo Park, CA 10,000 SF high-end tenant improvement of a venture capital office consisting of new executive offices, library, reception area, breakroom, open office with wood ceiling and conference rooms completed in an occupied building. Finishes include casework, architectural wood slat wall, fabric wrapped panels, and specialty carpet. Services Provided: Architect of Record: Client: News: Construction Perkins & Will Sequioa Capital None Completed 2024 Tenant Improvement BACK TO PROJECTS
- DivcoWest
This project consists of a design/build shell and site modifications to three existing buildings at 105,000 SF each. Project includes redesign of roof line at main entryways, new balcony guard rails, new roofing and rooftop HVAC equipment, new paving, new landscaping and various site elements. Project also features relocation of the main lobby at 125 Rio Robles, outside of the existing footprint, utilizing a new curtain wall ‘pop out’ to increase street visibility and building access. DivcoWest Menlo Park, CA This project consists of a design/build shell and site modifications to three existing buildings at 105,000 SF each. Project includes redesign of roof line at main entryways, new balcony guard rails, new roofing and rooftop HVAC equipment, new paving, new landscaping and various site elements. Project also features relocation of the main lobby at 125 Rio Robles, outside of the existing footprint, utilizing a new curtain wall ‘pop out’ to increase street visibility and building access. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. DivcoWest None Completed 2019 Corporate Design-Build BACK TO PROJECTS
- Skybox Data Center
This 564,789 SF project includes the demolition of three existing buildings, and new construction of a multi-purpose building comprised of a 4-story data center and six stories of office space. The project features a connecting loading dock with roll up doors, upgraded utility services, and a Day 1 office interior fit out. Additionally, the project features a new SVP substation on property which includes a double-ended 60kV tap from SVP. Skybox Data Center Santa Clara, CA This 564,789 SF project includes the demolition of three existing buildings, and new construction of a multi-purpose building comprised of a 4-story data center and six stories of office space. The project features a connecting loading dock with roll up doors, upgraded utility services, and a Day 1 office interior fit out. Additionally, the project features a new SVP substation on property which includes a double-ended 60kV tap from SVP. Services Provided: Architect of Record: Client: News: Construction Corgan Architecture, Inc. Skybox Development, LLC None Completed 2023 Data Center Corporate BACK TO PROJECTS
- Skyport Plaza
1,176,000 SF project consisting of three 8-story structural steel/precast concrete panel office towers, two steel frame retail structures and two 4-story concrete parking structures with parking for 1,840 cars. Extensive sitework and offsite improvements were also included in this phase of the project along with 340,000 SF office tenant improvements on sixteen floors within two existing 8-story buildings for Siemens. Skyport Plaza San Jose, CA 1,176,000 SF project consisting of three 8-story structural steel/precast concrete panel office towers, two steel frame retail structures and two 4-story concrete parking structures with parking for 1,840 cars. Extensive sitework and offsite improvements were also included in this phase of the project along with 340,000 SF office tenant improvements on sixteen floors within two existing 8-story buildings for Siemens. Services Provided: Architect of Record: Client: News: Construction Kenneth Rodrigues & Partners, Inc Equity Office Properties None Completed 2001 Corporate BACK TO PROJECTS
- USF Student Residence
This project features construction of two new Student Housing buildings at the University’s Lone Mountain campus. Both buildings are wood framed construction over concrete parking garage/podium. The West building is 110,760 SF and consists of five stories over a 1-story parking garage; this building provides 71 dormitory units, as well as amenity spaces. The East building is 123,690 SF and consists of four stories over a 1-story parking garage; this building provides 84 dormitory units, classrooms and amenity spaces. There are 156 parking spaces combined between the two buildings. USF Student Residence San Francisco, CA This project features construction of two new Student Housing buildings at the University’s Lone Mountain campus. Both buildings are wood framed construction over concrete parking garage/podium. The West building is 110,760 SF and consists of five stories over a 1-story parking garage; this building provides 71 dormitory units, as well as amenity spaces. The East building is 123,690 SF and consists of four stories over a 1-story parking garage; this building provides 84 dormitory units, classrooms and amenity spaces. There are 156 parking spaces combined between the two buildings. Services Provided: Architect of Record: Client: News: Construction MVE + Partners The Sobrato Organization None Completed 2021 Residential Education BACK TO PROJECTS
- HP Headquarters
Project consists of tenant improvement within a 6-story building for Hewlett Packard’s new headquarters. The 200,000 SF space features a CEO/executive floor on the 6th floor, with an executive briefing center with a dedicated cafeteria on the 4th floor. The 1st floor includes a media recording studio and innovation showcase space along with a Starbucks coffee station. This building serves as the new home for Hewlett Packard’s CEO and executive staff for the Bay Area. HP Headquarters Sunnyvale, CA Project consists of tenant improvement within a 6-story building for Hewlett Packard’s new headquarters. The 200,000 SF space features a CEO/executive floor on the 6th floor, with an executive briefing center with a dedicated cafeteria on the 4th floor. The 1st floor includes a media recording studio and innovation showcase space along with a Starbucks coffee station. This building serves as the new home for Hewlett Packard’s CEO and executive staff for the Bay Area. Services Provided: Architect of Record: Client: News: Construction Gensler Hewlett Packard Enterprise None Completed 2019 Corporate Tenant Improvement BACK TO PROJECTS












