- Skybox Data Center
This 564,789 SF project includes the demolition of three existing buildings, and new construction of a multi-purpose building comprised of a 4-story data center and six stories of office space. The project features a connecting loading dock with roll up doors, upgraded utility services, and a Day 1 office interior fit out. Additionally, the project features a new SVP substation on property which includes a double-ended 60kV tap from SVP. Skybox Data Center Santa Clara, CA This 564,789 SF project includes the demolition of three existing buildings, and new construction of a multi-purpose building comprised of a 4-story data center and six stories of office space. The project features a connecting loading dock with roll up doors, upgraded utility services, and a Day 1 office interior fit out. Additionally, the project features a new SVP substation on property which includes a double-ended 60kV tap from SVP. Services Provided: Architect of Record: Client: News: Construction Corgan Architecture, Inc. Skybox Development, LLC None Completed 2023 Data Center Corporate BACK TO PROJECTS
- Lawson Lane West
Building 1: Project consisting of one 5-story structural steel office building and attached 2-story structural steel amenity building totaling 276,356 SF, as well as an 8-level design/build precast-hybrid parking garage with two levels below-grade and six levels above grade totaling 302,473 SF. Project also features related site work. Building 2: Project consisting of one 5-story structural steel warm shell office building totaling 242,089 SF, as well as an expansion of the existing 8-level design/build precast-hybrid parking garage with two levels below grade and six levels above grade totaling 124,664 SF. Project also features related site work. Lawson Lane West Santa Clara, CA Building 1: Project consisting of one 5-story structural steel office building and attached 2-story structural steel amenity building totaling 276,356 SF, as well as an 8-level design/build precast-hybrid parking garage with two levels below-grade and six levels above grade totaling 302,473 SF. Project also features related site work. Building 2: Project consisting of one 5-story structural steel warm shell office building totaling 242,089 SF, as well as an expansion of the existing 8-level design/build precast-hybrid parking garage with two levels below grade and six levels above grade totaling 124,664 SF. Project also features related site work. Services Provided: Architect of Record: Client: News: Design, Construction ArcTec The Sobrato Organization None Completed 2022 Corporate Campus Design-Build BACK TO PROJECTS
- Raley's
This project includes a 75,000 SF upgraded supermarket located at the McQueen Crossing shopping center. Exterior of building is constructed with brick, stone, plaster, and wood shingle siding in the "cottage" architectural vernacular. Interior tenant improvements consisted of over 20 different flooring types/patterns and complicated curtainwall soffits at the ceiling level. Raley's Reno, NV This project includes a 75,000 SF upgraded supermarket located at the McQueen Crossing shopping center. Exterior of building is constructed with brick, stone, plaster, and wood shingle siding in the "cottage" architectural vernacular. Interior tenant improvements consisted of over 20 different flooring types/patterns and complicated curtainwall soffits at the ceiling level. Services Provided: Architect of Record: Client: News: Construction HMR Architects, Inc. McQueen Crossings LLC None Completed 2004 Retail Tenant Improvements BACK TO PROJECTS
- 2460 Sand Hill
This project consists of demolition of an existing 3-story office building to house a 33,127 SF 2-story office building on a 17,099 SF concrete podium over a parking garage. The project is a warm shell and features bathroom cores, office space, sitework with landscaping, and 58 parking stalls. Project also consists of an elevated concrete slab, concrete foundation walls and columns, complex shoring, retaining walls, glass and aluminum window assemblies, balconies and concrete patios, plaster and stone exterior veneer. 2460 Sand Hill Menlo Park, CA This project consists of demolition of an existing 3-story office building to house a 33,127 SF 2-story office building on a 17,099 SF concrete podium over a parking garage. The project is a warm shell and features bathroom cores, office space, sitework with landscaping, and 58 parking stalls. Project also consists of an elevated concrete slab, concrete foundation walls and columns, complex shoring, retaining walls, glass and aluminum window assemblies, balconies and concrete patios, plaster and stone exterior veneer. Services Provided: Architect of Record: Client: News: Construction Robert Remiker Architect Divcowest None Completed 2014 Corporate BACK TO PROJECTS
- Coyote Valley Research Park
Improvements for this project will include mass grading, flood control, bridges, levees, new roadways and modifications to existing roadway. Coyote Valley Research Park San Jose, CA Improvements for this project will include mass grading, flood control, bridges, levees, new roadways and modifications to existing roadway. Services Provided: Architect of Record: Client: News: Construction HMH Engineers, Devcon Construction Inc. Divco Properties None Completed 2006 Infrastructure BACK TO PROJECTS
- SCU Donohoe Alumni House
This project includes a seismic retrofit and tenant improvements of a 2-story historic masonry building. Includes replacement of exterior windows, addition of heating and cooling systems, replacement of the existing elevator and stairs, and the addition of an exterior ramp to achieve ADA compliance. The 6,400 SF interior will be completely remodeled as offices and meeting rooms. SCU Donohoe Alumni House Santa Clara, CA This project includes a seismic retrofit and tenant improvements of a 2-story historic masonry building. Includes replacement of exterior windows, addition of heating and cooling systems, replacement of the existing elevator and stairs, and the addition of an exterior ramp to achieve ADA compliance. The 6,400 SF interior will be completely remodeled as offices and meeting rooms. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2010 Education Residential Design-Build BACK TO PROJECTS
- Lenovo Building 2
This 37,500 SF design/build tenant improvement within a LEED Silver building consists of approximately 4,500 SF of modular conductive cooling data center and 32,000 SF of Class A office space. This is a fast-track project with a 12-week construction duration. Lenovo Building 2 Santa Clara, CA This 37,500 SF design/build tenant improvement within a LEED Silver building consists of approximately 4,500 SF of modular conductive cooling data center and 32,000 SF of Class A office space. This is a fast-track project with a 12-week construction duration. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Jones Lang LaSalle None Completed 2014 Tenant Improvement Design-Build LEED Silver BACK TO PROJECTS
- Campo di Bocce Livermore
This project consists of a 14,000 SF commercial building designed to compliment the adjacent Ruby Hill Commercial project. Included design features are weathered metal roofing, “green” ICF insulated foam walls overlayed with distressed lath and plaster finish, weathered barn doors and stone veneer. Project also consists of heavy timber trusses, exposed utilities, fully conditioned, four indoor courts and four outdoor courts, full service commercial kitchen to accommodate the court-side bocce diners, bar and private dining. Campo di Bocce Livermore Livermore, CA This project consists of a 14,000 SF commercial building designed to compliment the adjacent Ruby Hill Commercial project. Included design features are weathered metal roofing, “green” ICF insulated foam walls overlayed with distressed lath and plaster finish, weathered barn doors and stone veneer. Project also consists of heavy timber trusses, exposed utilities, fully conditioned, four indoor courts and four outdoor courts, full service commercial kitchen to accommodate the court-side bocce diners, bar and private dining. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Campo di Bocce None Completed 2006 Athletic Center Retail BACK TO PROJECTS
- San Antonio Village North Garage
Block 5 of the San Antonio Village North project consists of a large parking garage with 1-level below grade and eight levels above grade totaling 546,900 SF. San Antonio Village North Garage Mountain View, CA Block 5 of the San Antonio Village North project consists of a large parking garage with 1-level below grade and eight levels above grade totaling 546,900 SF. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Merlone Geier Partners None Completed 2018 Parking Structure Design-Build BACK TO PROJECTS
- Santa Cruz Warriors Arena
Construction of a 33,000 SF arena facility and modular locker, featuring training and restroom units for the D-League Santa Cruz Warriors. Structure is a Type II-B sprinkled single story sports arena with a pre-engineered tensile fabric membrane and clad metal panel siding. Seating will be comprised of both fixed and retractable seat back and bench seats. Court lighting via structure suspended Musco lighting. All sports equipment is NBA rated including courtside seating, wood flooring, scoreboards and scorer’s tables, shot clocks and portable backboards. Santa Cruz Warriors Arena Santa Cruz, CA Construction of a 33,000 SF arena facility and modular locker, featuring training and restroom units for the D-League Santa Cruz Warriors. Structure is a Type II-B sprinkled single story sports arena with a pre-engineered tensile fabric membrane and clad metal panel siding. Seating will be comprised of both fixed and retractable seat back and bench seats. Court lighting via structure suspended Musco lighting. All sports equipment is NBA rated including courtside seating, wood flooring, scoreboards and scorer’s tables, shot clocks and portable backboards. Services Provided: Architect of Record: Client: News: Construction Brown Reynolds Watford Architects Santa Cruz Warriors None Completed Athletic Center BACK TO PROJECTS
- Somersett Club Town Center
This project includes the design-build 35,544 SF of two 2-story wood framed Class A retail/office buildings with core improvements and vanilla shells to include elevators. Stucco finish with stone veneer and metal roofing. Project also includes site improvements for +/- 5 acres, site preparation for two (2) separate residential condo complexes, and a 10,000 sf plaza / courtyard between the office buildings. Buildings pending LEED Silver Certification that incorporates Green features such as waterless urinals, backbone HVAC fresh air system, solatube skylights, motion sensor lighting & bathroom fixtures, and dedicated recycling enclosures. Somersett Club Town Center Reno, NV This project includes the design-build 35,544 SF of two 2-story wood framed Class A retail/office buildings with core improvements and vanilla shells to include elevators. Stucco finish with stone veneer and metal roofing. Project also includes site improvements for +/- 5 acres, site preparation for two (2) separate residential condo complexes, and a 10,000 sf plaza / courtyard between the office buildings. Buildings pending LEED Silver Certification that incorporates Green features such as waterless urinals, backbone HVAC fresh air system, solatube skylights, motion sensor lighting & bathroom fixtures, and dedicated recycling enclosures. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Somersett Development Co. None Completed 2007 Retail Corporate Design-Build BACK TO PROJECTS
- Bellarmine Wade Academic Center
Project consisting of demolition to the existing Wade Residence Hall, with design/build construction of a new 45,000 SF, two-story academic building featuring classrooms, new utilities, sitework and landscaping. Project also includes reconfiguration of the existing parking lots, allowing improvement to site vehicular circulation. Bellarmine Wade Academic Center San Jose, CA Project consisting of demolition to the existing Wade Residence Hall, with design/build construction of a new 45,000 SF, two-story academic building featuring classrooms, new utilities, sitework and landscaping. Project also includes reconfiguration of the existing parking lots, allowing improvement to site vehicular circulation. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Bellarmine College Preparatory None https://imegcorp.com/news_events/ballarmine-college-prep-breaks-ground-on-new-academic-building/ Completed 2025 Education Design-Build BACK TO PROJECTS