top of page
Devcon_Logo_wTaglines.png

Contact Us

Address

500 Terry Francine St.
San Francisco, CA 94158

Contact

123-456-7890

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

Opening Hours

Mon - Fri

8:00 am – 8:00 pm

Saturday

9:00 am – 7:00 pm

​Sunday

9:00 am – 9:00 pm

Search Results

384 results found with an empty search

  • 2800 Sand Hill

    Project consists of extensive renovations to the site, building shell, and interior. The interior scope consists of a 33,000 SF, 2-story interior remodel including structural renovations, replacement of all existing HVAC units, addition of a new interior stair, and new interior framing and finishes. Modifications to the existing shell include replacement of glazing systems, addition of skylights, replacement of the roof eaves with metal lattice, and addition of a 2nd floor balcony lounge. The sitework features modification of existing site utilities for added drainage, landscape and hardscape. 2800 Sand Hill Menlo Park, CA Project consists of extensive renovations to the site, building shell, and interior. The interior scope consists of a 33,000 SF, 2-story interior remodel including structural renovations, replacement of all existing HVAC units, addition of a new interior stair, and new interior framing and finishes. Modifications to the existing shell include replacement of glazing systems, addition of skylights, replacement of the roof eaves with metal lattice, and addition of a 2nd floor balcony lounge. The sitework features modification of existing site utilities for added drainage, landscape and hardscape. Services Provided: Architect of Record: Client: News: Construction Gensler Sequoia Capital None Completed 2015 Corporate Tenant Improvement BACK TO PROJECTS

  • The Nueva School - Bay Meadows Phase 3A

    This project consists of a new 2-story, 7,500 SF classroom wing on existing podium. Project includes additional 7,300 SF of roof deck/green roof area, plus on-grade site work. The Nueva School - Bay Meadows Phase 3A San Mateo, CA This project consists of a new 2-story, 7,500 SF classroom wing on existing podium. Project includes additional 7,300 SF of roof deck/green roof area, plus on-grade site work. Services Provided: Architect of Record: Client: News: Construction LMS Architects The Nueva School None Completed 2019 Education BACK TO PROJECTS

  • Napa Logistics Building 3

    201,839 SF project consisting of a concrete tilt-up shell building with 188,433 SF designated as warehouse, 6,867 SF assembly and 6,539 SF office tenant improvement. The building includes 8” reinforced SOG with dowel baskets at all control joints, concrete tilt-up panels with a 40’ clear height to bottom of truss, loading docks, ESFR fire system, panelized roof system, as well as TPO roofing, dock levelers, overhead doors including high speed and coiling, two 30,000 SF steel canopies for material loading, and infrastructure for (300+) future van distribution EV charging stations. The site is approximately 58 acres and includes grading and paving, along with underground utilities and tie-ins to existing utilities, bioswales and landscaping. Napa Logistics Building 3 American Canyon, CA 201,839 SF project consisting of a concrete tilt-up shell building with 188,433 SF designated as warehouse, 6,867 SF assembly and 6,539 SF office tenant improvement. The building includes 8” reinforced SOG with dowel baskets at all control joints, concrete tilt-up panels with a 40’ clear height to bottom of truss, loading docks, ESFR fire system, panelized roof system, as well as TPO roofing, dock levelers, overhead doors including high speed and coiling, two 30,000 SF steel canopies for material loading, and infrastructure for (300+) future van distribution EV charging stations. The site is approximately 58 acres and includes grading and paving, along with underground utilities and tie-ins to existing utilities, bioswales and landscaping. Services Provided: Architect of Record: Client: News: Construction Ware Malcomb Architects Napa Logistics None In Progress Corporate Tenant Imrovement BACK TO PROJECTS

  • Cisco MTV-5

    This project consists of a 15,000 SF building housing fully operational Web-Ex data center. Project includes CD room, entrance facility, data center and build room, additional CRAC’s, PDU’s, and complete replacement of existing building automation system. Project completed in twelve 60 hour weeks through Thanksgiving, Christmas & New Year’s holidays. Cisco MTV-5 Mountain View, CA This project consists of a 15,000 SF building housing fully operational Web-Ex data center. Project includes CD room, entrance facility, data center and build room, additional CRAC’s, PDU’s, and complete replacement of existing building automation system. Project completed in twelve 60 hour weeks through Thanksgiving, Christmas & New Year’s holidays. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Cisco Systems, Inc. None Completed 2008 Data Center Corporate Design-Build BACK TO PROJECTS

  • 240 Hamilton

    This project consist of a 14,931 SF four-story, mixed-use building located in downtown Palo Alto. The project features retail on the ground floor, commercial office spaces on 2nd and 3rd floors and two residential apartments on the 4th floor. Project includes vehicle stacking system in garage with car turntable which allows vehicles to exit forward onto Ramona Avenue. The building structure consists of reinforced concrete frame and suspended slabs over mat slab foundation. The exterior skin is a combination of glass curtain wall, storefront, mechanically fastened stone and composite aluminum panel system. 240 Hamilton Palo Alto, CA This project consist of a 14,931 SF four-story, mixed-use building located in downtown Palo Alto. The project features retail on the ground floor, commercial office spaces on 2nd and 3rd floors and two residential apartments on the 4th floor. Project includes vehicle stacking system in garage with car turntable which allows vehicles to exit forward onto Ramona Avenue. The building structure consists of reinforced concrete frame and suspended slabs over mat slab foundation. The exterior skin is a combination of glass curtain wall, storefront, mechanically fastened stone and composite aluminum panel system. Services Provided: Architect of Record: Client: News: Construction The Hayes Group Hamilton Real, LLC None Completed 2016 Corporate Retail Residential BACK TO PROJECTS

  • Kleiner Perkins - Sand Hill

    This is a multi phase project at 2750 & 2744 Sand Hill Road. Project includes 8,550 SF of tenant improvement including custom millwork private office fronts and A/V conference rooms. Phase two includes an exterior steel bridge linking buildings together. Scope features custom wood roof and cedar ceilings. Phase three scope includes conference room and restroom remodel during KPCB daily operations. Kleiner Perkins - Sand Hill Menlo Park, CA This is a multi phase project at 2750 & 2744 Sand Hill Road. Project includes 8,550 SF of tenant improvement including custom millwork private office fronts and A/V conference rooms. Phase two includes an exterior steel bridge linking buildings together. Scope features custom wood roof and cedar ceilings. Phase three scope includes conference room and restroom remodel during KPCB daily operations. Services Provided: Architect of Record: Client: News: Construction Perkins + Will Kleiner Perkins Caufield & Byers None Completed 2011 Corporate Tenant Improvement BACK TO PROJECTS

  • 220 Park

    185,000 SF project consisting of a 6-story office and 17,000 SF of retail in prime downtown location. Project features a rehabilitated historic post office integrated into the new development. Construction also includes two levels of below grade parking, multiple balconies and a ground level plaza. 220 Park Burlingame, CA 185,000 SF project consisting of a 6-story office and 17,000 SF of retail in prime downtown location. Project features a rehabilitated historic post office integrated into the new development. Construction also includes two levels of below grade parking, multiple balconies and a ground level plaza. Services Provided: Architect of Record: Client: News: Construction Korth Sunseri Hagey Architects Dostart Development Co. & Saris Regis Group of Northern California None https://220parkburlingame.com/ https://sfyimby.com/2021/10/construction-underway-for-220-park-road-burlingame-san-mateo-county.html https://www.bizjournals.com/sanfrancisco/news/2022/04/29/burlingame-town-square.html Completed 2024 Corporate Retail Historic Integration BACK TO PROJECTS

  • Mountain View Campus Cafe

    This project includes an 8,500 SF Café with authentic Japanese design elements, such as private dining rooms with recessed floors and shoji screen doors, tatami mat seating areas, and fabric wall panels. Other high-end finishes include stone tile floors, hand-painted wall tiles, wood slat ceilings, custom banquettes, and numerous other custom wood elements. Exterior improvements feature an updated patio area with built-in wood benches, a new fountain, cedar perimeter fence, and new Japanese gate structures. The Café was built inside an occupied building and completed successfully on an extremely tight seven week schedule, requiring double- and triple-shifts for the full duration. Mountain View Campus Cafe Mountain View, CA This project includes an 8,500 SF Café with authentic Japanese design elements, such as private dining rooms with recessed floors and shoji screen doors, tatami mat seating areas, and fabric wall panels. Other high-end finishes include stone tile floors, hand-painted wall tiles, wood slat ceilings, custom banquettes, and numerous other custom wood elements. Exterior improvements feature an updated patio area with built-in wood benches, a new fountain, cedar perimeter fence, and new Japanese gate structures. The Café was built inside an occupied building and completed successfully on an extremely tight seven week schedule, requiring double- and triple-shifts for the full duration. Services Provided: Architect of Record: Client: News: Construction BOORA Architects Confidential None Completed 2011 Corporate Tenant Improvement BACK TO PROJECTS

  • Plantronics Back Lot

    This project consists of construction of a new park facility consisting of a BBQ, and BBQ trellis area with stone pavers, new soccer field and trellis, bocce courts, horseshoe pit and basketball court. The project also features parking lot renovation with vine screen, fruit orchard, yoga yurt, and meandering pathways with site lighting. Plantronics Back Lot Santa Cruz, CA This project consists of construction of a new park facility consisting of a BBQ, and BBQ trellis area with stone pavers, new soccer field and trellis, bocce courts, horseshoe pit and basketball court. The project also features parking lot renovation with vine screen, fruit orchard, yoga yurt, and meandering pathways with site lighting. Services Provided: Architect of Record: Client: News: Construction NA Plantronics None Completed 2016 Tenant Improvement BACK TO PROJECTS

  • 488 Almaden

    Seventeen-story high rise located in the heart of downtown San Jose. This structural steel office building with precise concrete panels, glass and glazing skin consists of 381,001 square feet along with one eleven-story parking garage (three levels below grade) consisting of 440,017 square feet. 488 Almaden San Jose, CA Seventeen-story high rise located in the heart of downtown San Jose. This structural steel office building with precise concrete panels, glass and glazing skin consists of 381,001 square feet along with one eleven-story parking garage (three levels below grade) consisting of 440,017 square feet. Services Provided: Architect of Record: Client: News: Construction Korth Sunseri Hagey Architects Sobrato Development None Completed 2003 Corporate Steel Construction BACK TO PROJECTS

  • Commonwealth Corporate Center

    Project consists of two 130,000 SF core & shell, 4-story structural steel buildings. The exterior skin of the building is primarily a unitized curtain wall system with composite metal panel cladding of exterior fin features. The project also includes 610,000 SF of onsite improvements including landscape, outdoor dining areas and sports court. Commonwealth Corporate Center Menlo Park, CA Project consists of two 130,000 SF core & shell, 4-story structural steel buildings. The exterior skin of the building is primarily a unitized curtain wall system with composite metal panel cladding of exterior fin features. The project also includes 610,000 SF of onsite improvements including landscape, outdoor dining areas and sports court. Services Provided: Architect of Record: Client: News: Construction ArcTec Inc. The Sobrato Organization None Completed 2016 Corporate BACK TO PROJECTS

  • Milpitas East Parking Garage

    125,000 SF parking structure consisting of four levels with parking for 281 vehicles. The garage is a poured in place, post tension, beam and slab structure. The structure also includes space for a future restroom, which will be utilized by the new library. This project will also consists of minor office space, a janitor's room, an electrical and telecommunications room and sitework. Milpitas East Parking Garage Milpitas, CA 125,000 SF parking structure consisting of four levels with parking for 281 vehicles. The garage is a poured in place, post tension, beam and slab structure. The structure also includes space for a future restroom, which will be utilized by the new library. This project will also consists of minor office space, a janitor's room, an electrical and telecommunications room and sitework. Services Provided: Architect of Record: Client: News: Construction Chong Partners Architect City of Milpitas None Completed 2007 Parking Structure BACK TO PROJECTS

bottom of page