- Sage Point 7
Prologis Sage Point 7 is a 531,881 SF, 36’ clear height concrete tilt-up warm, dark shell warehouse on 48.34 acres with full site improvements. GameStop, a Fortune 500 company and leading specialty retailer offering games and entertainment products through its E-commerce leasing the warehouse to expand their business and fulfilment capacity in the West Coast. Interior space will be fully built out for GameStop with State-of-the-art technology for the modern distribution needs. Overall project will adhere to the Prologis LEED Volume Program. Sage Point 7 Reno, NV Prologis Sage Point 7 is a 531,881 SF, 36’ clear height concrete tilt-up warm, dark shell warehouse on 48.34 acres with full site improvements. GameStop, a Fortune 500 company and leading specialty retailer offering games and entertainment products through its E-commerce leasing the warehouse to expand their business and fulfilment capacity in the West Coast. Interior space will be fully built out for GameStop with State-of-the-art technology for the modern distribution needs. Overall project will adhere to the Prologis LEED Volume Program. Services Provided: Architect of Record: Client: News: Construction HPA Architects Prologis, LP None Completed 2023 Commercial Instrustrial Prologis LEED Volume BACK TO PROJECTS
- SK Hynix HQ
Design/build project consisting of a 2-story renovation to the existing SK Hynix office and VIP space. The 90,000 SF project features high-end finishes with custom millwork throughout the two-story lobby, CEO, CMO and Executive suites and conference rooms, open office areas with baffle ceilings, as well as a full-service kitchen and cafeteria space to serve the 300+ employees onsite. This project includes a fast-paced construction schedule to accommodate move in within six months. SK Hynix HQ San Jose, CA Design/build project consisting of a 2-story renovation to the existing SK Hynix office and VIP space. The 90,000 SF project features high-end finishes with custom millwork throughout the two-story lobby, CEO, CMO and Executive suites and conference rooms, open office areas with baffle ceilings, as well as a full-service kitchen and cafeteria space to serve the 300+ employees onsite. This project includes a fast-paced construction schedule to accommodate move in within six months. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. SK Hynix None Completed 2024 Tenant Improvement Corporate Design-Build BACK TO PROJECTS
- Cisco Parking Structure
Project consisting of three design/build, cast-in-place, reinforced and post-tensioned concrete construction parking garages, each consisting of four levels of above grade parking (3 elevated). Structure 1 is 239,141 SF and provides 788 stalls. Structure 2 is 225,031 SF and provides 741 stalls. Structure 3 is 319,085 SF and provides 1032 stalls. All of the garages feature charging stations for electric vehicles, vehicle monitoring systems, preparations for future photovoltaic systems, upgraded site and garage signage to match the campus, and a texcote finish. Cisco Parking Structure San Jose, CA Project consisting of three design/build, cast-in-place, reinforced and post-tensioned concrete construction parking garages, each consisting of four levels of above grade parking (3 elevated). Structure 1 is 239,141 SF and provides 788 stalls. Structure 2 is 225,031 SF and provides 741 stalls. Structure 3 is 319,085 SF and provides 1032 stalls. All of the garages feature charging stations for electric vehicles, vehicle monitoring systems, preparations for future photovoltaic systems, upgraded site and garage signage to match the campus, and a texcote finish. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. CBRE Global Corporate Services None Completed 2013 Parking Structure BACK TO PROJECTS
- Bellarmine Lorry I. Lokey Academic Center
This 53,000 SF project consists of a 2-story steel frame and concrete structure. The building features (27) classrooms, (2) multi-purpose rooms, a Learning Resource Center, and a Faculty Lounge complete with offices, meeting rooms, and a kitchen. The project also includes the demolition of the existing building and the installation of approximately (20) portables for use during construction. Bellarmine Lorry I. Lokey Academic Center San Jose, CA This 53,000 SF project consists of a 2-story steel frame and concrete structure. The building features (27) classrooms, (2) multi-purpose rooms, a Learning Resource Center, and a Faculty Lounge complete with offices, meeting rooms, and a kitchen. The project also includes the demolition of the existing building and the installation of approximately (20) portables for use during construction. Services Provided: Architect of Record: Client: News: Construction Steinberg Hart Bellarmine College Preparatory None Completed 2011 Education LEED Gold BACK TO PROJECTS
- Brocade Building 1
This 120,000 SF mixed use project includes approximately 65,000 SF of computer lab and data center space to house over 1,800 data server racks. Devcon took the lead to analyze and recommend a cost effective high efficiency HVAC strategy which could be implemented given the constraints of the existing building (extremely limited overhead clearances and no access to outside air). To this end a “contained hot aisle” scheme utilizing custom in-row water cooled fan coils was developed with Devcon completing 100% of the design effort of the lab layouts and hot aisle containment structures. As part of the lab/data center design effort, all components were modeled in 3D and Autodesk Navisworks was utilized to combine the various trade models and run clash detection between their separate components effectively creating a highly detailed virtual mock-up of all of these spaces prior to construction. Brocade Building 1 San Jose, CA This 120,000 SF mixed use project includes approximately 65,000 SF of computer lab and data center space to house over 1,800 data server racks. Devcon took the lead to analyze and recommend a cost effective high efficiency HVAC strategy which could be implemented given the constraints of the existing building (extremely limited overhead clearances and no access to outside air). To this end a “contained hot aisle” scheme utilizing custom in-row water cooled fan coils was developed with Devcon completing 100% of the design effort of the lab layouts and hot aisle containment structures. As part of the lab/data center design effort, all components were modeled in 3D and Autodesk Navisworks was utilized to combine the various trade models and run clash detection between their separate components effectively creating a highly detailed virtual mock-up of all of these spaces prior to construction. Services Provided: Architect of Record: Client: News: Construction RMW Architecture & Interios Brocade Communications Systems Inc. None https://www.bizjournals.com/sanjose/news/2018/06/04/micron-n-san-jose-campus-brocade-lease-holger-way.html Completed 2010 Data Center Corporate LEED Gold BACK TO PROJECTS
- Sunnyvale Town Center
Garage 1: 414,777 SF design/build post-tensioned cast-in-place concrete garage consisting of four levels above grade and one level basement garage providing a total of 1,101 stalls. The east and west elevations are decorated with ceramic tiles, metal fins, metal canopies, faux storefront, and texcote finish. Garage 2: 621,801 SF design/build post-tensioned cast-in-place concrete garage consisting of four levels above grade and one level basement garage providing a total of 1,687 stalls. The east and west elevations are decorated with ceramic tiles, metal fins, metal canopies, faux storefront, and texcote finish. Sunnyvale Town Center Sunnyvale, CA Garage 1: 414,777 SF design/build post-tensioned cast-in-place concrete garage consisting of four levels above grade and one level basement garage providing a total of 1,101 stalls. The east and west elevations are decorated with ceramic tiles, metal fins, metal canopies, faux storefront, and texcote finish. Garage 2: 621,801 SF design/build post-tensioned cast-in-place concrete garage consisting of four levels above grade and one level basement garage providing a total of 1,687 stalls. The east and west elevations are decorated with ceramic tiles, metal fins, metal canopies, faux storefront, and texcote finish. Services Provided: Architect of Record: Client: News: Design, Construction International Parking Design REDUS SVTC, LLC, a Delaware limited liability company None Completed 2009 Parking Structure BACK TO PROJECTS
- Lawson Lane East Garage
Project consists of 270,376 SF design/build long-span, 5-story concrete parking garage to house approximately 880 vehicles. This project is a LEED Gold Award winner. Lawson Lane East Garage Santa Clara, CA Project consists of 270,376 SF design/build long-span, 5-story concrete parking garage to house approximately 880 vehicles. This project is a LEED Gold Award winner. Services Provided: Architect of Record: Client: News: Design, Construction International Parking Design The Sobrato Organization None Completed 2013 Parking Structure Sustainable LEED Gold BACK TO PROJECTS
- Voyager Campus
Devcon lead design/build project with outside architect consisting of demolition of a 5-building campus and “make ready” utility work with new construction featuring a 3-level, 750,000 SF Class A office building above a 2-level, 540,000 SF below grade parking garage. This iconic, open floor concept building has an exposed, triangular grid structural steel framing over PT concrete podium. Unique features include faceted, architectural façade and roof with 287 triangle skylights, terraced floor plates, raised floors with underfloor HVAC, in-slab radiant heating/cooling, living walls, and Mezzanine bar. Project also includes 12 acres of site work including a private park with a 50,000 SF, 65’ tall triangular steel trellis with 450 kW PV panel array, “tree house” structures for working outside, and an elevated bridge connection to Phase I Endeavor building. The project will receive a LEED Gold rating. Voyager Campus Santa Clara, CA Devcon lead design/build project with outside architect consisting of demolition of a 5-building campus and “make ready” utility work with new construction featuring a 3-level, 750,000 SF Class A office building above a 2-level, 540,000 SF below grade parking garage. This iconic, open floor concept building has an exposed, triangular grid structural steel framing over PT concrete podium. Unique features include faceted, architectural façade and roof with 287 triangle skylights, terraced floor plates, raised floors with underfloor HVAC, in-slab radiant heating/cooling, living walls, and Mezzanine bar. Project also includes 12 acres of site work including a private park with a 50,000 SF, 65’ tall triangular steel trellis with 450 kW PV panel array, “tree house” structures for working outside, and an elevated bridge connection to Phase I Endeavor building. The project will receive a LEED Gold rating. Services Provided: Architect of Record: Client: News: Design, Construction Gensler Confidential None Completed 2021 Corporate Design-Build LEED Gold BACK TO PROJECTS
- Redwood City Jefferson Campus
This project consists of an 89,000 SF interior tenant improvement of a recently completed 4-story building in downtown Redwood City. First level consists of a reception lobby, catering kitchen, large community event space with conference rooms, break areas, and shipping & receiving area. Floors 2 through 4 include open office space, conference rooms, library, coffee bar, IT help desk, and executive conference rooms that are surrounded by wood feature walls, team areas with wood ceilings and custom baffles at the corridors. Floor 3 features a full-service kitchen, “All Hands” event space, recording studio and two high-end terrace buildouts with unit pavers and custom planters. Redwood City Jefferson Campus Redwood City, CA This project consists of an 89,000 SF interior tenant improvement of a recently completed 4-story building in downtown Redwood City. First level consists of a reception lobby, catering kitchen, large community event space with conference rooms, break areas, and shipping & receiving area. Floors 2 through 4 include open office space, conference rooms, library, coffee bar, IT help desk, and executive conference rooms that are surrounded by wood feature walls, team areas with wood ceilings and custom baffles at the corridors. Floor 3 features a full-service kitchen, “All Hands” event space, recording studio and two high-end terrace buildouts with unit pavers and custom planters. Services Provided: Architect of Record: Client: News: Construction Bohlin Cywinski Jackson Confidential None https://www.smdailyjournal.com/news/local/chan-zuckerberg-initiative-unveils-community-space/article_88b09d56-3e53-11ea-801b-b79be85029c0.html Completed 2019 Corporate Tenant Improvement BACK TO PROJECTS
- Devcon Construction, Inc | Contact
Devcon has multiple locations throughout California and Nevada. We focus our projects to maintain our strong regional presence in the West so as to contribute to our local communities and markets. Our headquarters is in Milpitas, CA. We have satellite offices in South San Francisco, Morgan Hill, Santa Cruz, Petaluma, Stockton, and Reno. CONTACT CAREERS Our team is looking for energetic, team-oriented individuals who can work in a fast-paced, high energy environment through the entire project design process and construction. If you think you have what it takes to be a member of the Devcon family, please take a look at our Careers page. We look forward to meeting you! INQUIRIES Devcon welcomes all potential client inquiries. We limit our project scope to exclude small-scale residential projects. If you are a potential customer, please contact Gary Filizetti by e-mail at gfilizetti@devcon-const.com or by phone at (408) 942-8200. For general inquiries or questions, please contact us at contact@devcon-const.com . LOCATIONS Devcon has multiple locations throughout California and Nevada. We focus our projects to maintain our strong regional presence in the West so as to contribute to our local communities and markets. Our headquarters is in Milpitas, CA. We have satellite offices in South San Francisco, Morgan Hill, Santa Cruz, Petaluma, Pleasanton, Stockton, and Reno. All employment opportunities will be processed through the Milpitas headquarters. Headquarters: 690 Gibraltar Drive Milpitas, CA 95035 Phone: (408) 942-8200 Fax: (408) 262-2342 PETALUMA 2000 S McDowell Blvd Ext #212 Petaluma, CA 94954 SOUTH SAN FRANCISCO 745 Airport Boulevard South San Francisco, CA 94080 RENO 10589 Double R Blvd. Reno NV 89521 STOCKTON 2010 Fremont St., Suite A Stockton CA 95203 PLEASANTON 4430 Rosewood Drive, Suite 125 Pleasanton, CA SANTA CRUZ 2-1523 East Cliff Dr Santa Cruz CA 95062 MORGAN HILL STOCKTON 2010 W. Fremont St. Suite A Stockton CA 95203 MILPITAS 690 Gibraltar Dr Milpitas CA 950 35
- Main Street Village
This 95,809 SF project consists of two buildings totaling 64 residential units with 3,527 SF of commercial space, and 19,668 SF of underground parking. Units range from studio to 3-bedroom, and are transitional housing for the homeless. Building 1 is wood frame and consists of three stories with construction over a concrete podium with underground parking. Building 2 is also wood framed and consists of three stories of construction over slab on grade. In additional to residential units, Building 1 includes office space, computer room, and a community room with kitchen. Building 2 features a meeting room and common laundry facilities. This project is Green Point Rated, and includes a PV system. The site includes new underground onsite and offsite utilities, some off site road improvements, bioswales, and a children's play area and basketball court. The project is funded by several sources including HUD and the City of Fremont. Main Street Village Fremont, CA This 95,809 SF project consists of two buildings totaling 64 residential units with 3,527 SF of commercial space, and 19,668 SF of underground parking. Units range from studio to 3-bedroom, and are transitional housing for the homeless. Building 1 is wood frame and consists of three stories with construction over a concrete podium with underground parking. Building 2 is also wood framed and consists of three stories of construction over slab on grade. In additional to residential units, Building 1 includes office space, computer room, and a community room with kitchen. Building 2 features a meeting room and common laundry facilities. This project is Green Point Rated, and includes a PV system. The site includes new underground onsite and offsite utilities, some off site road improvements, bioswales, and a children's play area and basketball court. The project is funded by several sources including HUD and the City of Fremont. Services Provided: Architect of Record: Client: News: Construction JSWD Architects MidPen Housing Corporation None Completed 2011 Residential Green Point Rated BACK TO PROJECTS
- De La Salle High School Athletic Field Improvements - Phase 1
Project consisting of new dugouts and bullpens, artificial turf replacement, new drainage at the baseball and lacrosse field, as well as new perimeter fencing and netting. De La Salle High School Athletic Field Improvements - Phase 1 Concord, CA Project consisting of new dugouts and bullpens, artificial turf replacement, new drainage at the baseball and lacrosse field, as well as new perimeter fencing and netting. Services Provided: Architect of Record: Client: News: Construction Ratcliff (Principal/CEO) De La Salle High School None Completed 2025 Athletic Center BACK TO PROJECTS