Search Results
384 results found with an empty search
- Bay Street Apartments
This project consists of the construction of a 284 unit apartment complex (approximately 270,000 SF) on top of an existing 3-story concrete structure located in Emeryville. Project features exterior courtyards with landscaping and a swimming pool. The existing concrete structure has two levels of parking with retail shops at the ground level. Construction of the apartments did not disrupt the retail businesses because scaffolding will be held off the ground. The apartments are framed with a proprietary steel tube panelized wall system that supports all gravity and lateral loads while floors are framed with metal joists, plywood and concrete fill. Bay Street Apartments Emeryville, CA This project consists of the construction of a 284 unit apartment complex (approximately 270,000 SF) on top of an existing 3-story concrete structure located in Emeryville. Project features exterior courtyards with landscaping and a swimming pool. The existing concrete structure has two levels of parking with retail shops at the ground level. Construction of the apartments did not disrupt the retail businesses because scaffolding will be held off the ground. The apartments are framed with a proprietary steel tube panelized wall system that supports all gravity and lateral loads while floors are framed with metal joists, plywood and concrete fill. Services Provided: Architect of Record: Client: News: Construction SB Architects Bay Street Housing Partners LP, MacFarlane Partners None Completed 2006 Residential BACK TO PROJECTS
- Coyote Valley Research Park
Improvements for this project will include mass grading, flood control, bridges, levees, new roadways and modifications to existing roadway. Coyote Valley Research Park San Jose, CA Improvements for this project will include mass grading, flood control, bridges, levees, new roadways and modifications to existing roadway. Services Provided: Architect of Record: Client: News: Construction HMH Engineers, Devcon Construction Inc. Divco Properties None Completed 2006 Infrastructure BACK TO PROJECTS
- Adobe Data Center ET6
A very challenging project to expand an existing operational data center and related support systems. The enlarged facility provided for approx 150 server cabinets with a power density of 8kW/ea. N+1 redundancy was provided using the Liebert XD HVAC system, with multiple static UPS and parallel distribution. Improvements also included VESDA and pre-action fire protection. Construction constraints included very limited floor-floor heights, completion of the electrical tie-ins into live services, and full commissioning under simulated load during off-hours. Adobe Data Center ET6 San Jose, CA A very challenging project to expand an existing operational data center and related support systems. The enlarged facility provided for approx 150 server cabinets with a power density of 8kW/ea. N+1 redundancy was provided using the Liebert XD HVAC system, with multiple static UPS and parallel distribution. Improvements also included VESDA and pre-action fire protection. Construction constraints included very limited floor-floor heights, completion of the electrical tie-ins into live services, and full commissioning under simulated load during off-hours. Services Provided: Architect of Record: Client: News: Construction ArcTec Adobe Systems, Inc None Completed 2008 Data Center Corporate BACK TO PROJECTS
- SCU Softball Field
Project features a complete demolition of the field, landscaping, and fencing in order to reorient the field in a South to North manor, allowing for an expanded spectator area and future buildings. Project includes an impressive Division 1 Softball complex complete with landscape & irrigation, backstop with protection netting, fenced dugouts, and large flood lights for night games. Project featuring new concrete pathways throughout the softball complex. Landscaping is also included on the perimeter of the softball complex to beautify the area for students, pedestrians, and fans. Project featuring a set of stadium style bleachers complete with 200 spacious folding seats, cup holders, ADA accessible spaces, low voltage wiring for a future scoreboard in center field, a backup generator for emergency lighting, and red fines for the future bullpens. Project also includes landscaping, underground utilities, life safety, domestic water lines, sanitary sewer, storm drain, electrical conduit, fire water lines and planning for what Santa Clara University envisions for the Softball Complex in the coming years. New Softball stadium and facility for SCU Softball Team. Includes new batting cage, grandstands, concession stand and pressbox. SCU Softball Field Santa Clara, CA Project features a complete demolition of the field, landscaping, and fencing in order to reorient the field in a South to North manor, allowing for an expanded spectator area and future buildings. Project includes an impressive Division 1 Softball complex complete with landscape & irrigation, backstop with protection netting, fenced dugouts, and large flood lights for night games. Project featuring new concrete pathways throughout the softball complex. Landscaping is also included on the perimeter of the softball complex to beautify the area for students, pedestrians, and fans. Project featuring a set of stadium style bleachers complete with 200 spacious folding seats, cup holders, ADA accessible spaces, low voltage wiring for a future scoreboard in center field, a backup generator for emergency lighting, and red fines for the future bullpens. Project also includes landscaping, underground utilities, life safety, domestic water lines, sanitary sewer, storm drain, electrical conduit, fire water lines and planning for what Santa Clara University envisions for the Softball Complex in the coming years. New Softball stadium and facility for SCU Softball Team. Includes new batting cage, grandstands, concession stand and pressbox. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2016 Education Athletic Center Design-Build BACK TO PROJECTS
- Stevenson Place
This 83,000 SF multifamily rental development consists of (80) affordable housing units. The one 4-story wood framed project includes a community room, and youth program & service facilities at ground level. The common areas feature a community room, youth center, bicycle parking room, meeting rooms, computer room, and tenant storage & laundry facilities. Stevenson Place Fremont, CA This 83,000 SF multifamily rental development consists of (80) affordable housing units. The one 4-story wood framed project includes a community room, and youth program & service facilities at ground level. The common areas feature a community room, youth center, bicycle parking room, meeting rooms, computer room, and tenant storage & laundry facilities. Services Provided: Architect of Record: Client: News: Construction HCL MidPen Housing Corporation None Completed 2019 Residential BACK TO PROJECTS
- Tasman Campus Building 1
3-story tenant improvement, MEP upgrade and exterior remodel within a 144,000 SF building, featuring a new 1st floor servery with back of house food prep areas and stadium style bench seating. Project consists of 1st floor automotive lab space including acoustical chambers and specialty bench labs. Upper floors feature full interior remodel of open office, central core support areas and restrooms, and complete replacement of HVAC infrastructure to support new building design requirements. The exterior scope consists of refresh and refinish of existing Exterior Insulation Finish System (EIFS) and code mandated ADA upgrades. Tasman Campus Building 1 San Jose, CA 3-story tenant improvement, MEP upgrade and exterior remodel within a 144,000 SF building, featuring a new 1st floor servery with back of house food prep areas and stadium style bench seating. Project consists of 1st floor automotive lab space including acoustical chambers and specialty bench labs. Upper floors feature full interior remodel of open office, central core support areas and restrooms, and complete replacement of HVAC infrastructure to support new building design requirements. The exterior scope consists of refresh and refinish of existing Exterior Insulation Finish System (EIFS) and code mandated ADA upgrades. Services Provided: Architect of Record: Client: News: Construction Form4Architecture Confidential None Completed 2022 Tenant Improvement Corporate BACK TO PROJECTS
- Laguna Commons
This 65,153 SF project features 4-story, Type V-A, wood framed slab on grade. The complex consists of 64 affordable family housing apartment units with community and service facilities at the ground floor. Laguna Commons Fremont, CA This 65,153 SF project features 4-story, Type V-A, wood framed slab on grade. The complex consists of 64 affordable family housing apartment units with community and service facilities at the ground floor. Services Provided: Architect of Record: Client: News: Construction Leddy Maytum Stacy Architects MidPen Housing Corporation None Completed 2016 Residential BACK TO PROJECTS
- Proofpoint Buildings 9 & 10
242,000 SF tenant improvement within two 3-story office buildings featuring open office space with exposed ceilings, private offices, conference rooms, training rooms, break rooms, multi-purpose rooms, and briefing centers. Tenant improvement construction is concurrent with core/shell buildout. Proofpoint Buildings 9 & 10 Sunnyvale, CA 242,000 SF tenant improvement within two 3-story office buildings featuring open office space with exposed ceilings, private offices, conference rooms, training rooms, break rooms, multi-purpose rooms, and briefing centers. Tenant improvement construction is concurrent with core/shell buildout. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture Proofpoint, Inc. None Completed 2020 Corporate Tenant Improvement BACK TO PROJECTS
- SCU Charney Hall
This project includes the construction of a 108,000 SF, 3-story structural steel building with a 10” suspended slab and auger cast pile foundation system. Project includes the Panelli courtroom which is named after The Justice Edward A. Panelli, five lecture halls, four classrooms, an advocacy classroom, and study rooms. The project also features conference rooms, a Dean’s suite, law library, over 50 offices for the professors, roof skylights, a café, roof terrace, law school lounge, and glass guardrails on second and third floor opening to floors below. SCU Charney Hall Santa Clara, CA This project includes the construction of a 108,000 SF, 3-story structural steel building with a 10” suspended slab and auger cast pile foundation system. Project includes the Panelli courtroom which is named after The Justice Edward A. Panelli, five lecture halls, four classrooms, an advocacy classroom, and study rooms. The project also features conference rooms, a Dean’s suite, law library, over 50 offices for the professors, roof skylights, a café, roof terrace, law school lounge, and glass guardrails on second and third floor opening to floors below. Services Provided: Architect of Record: Client: News: Construction Soloman Corwell Buenz Santa Clara University None Completed 2018 Education BACK TO PROJECTS
- Jessie Street Terrace
Project consisting of demolition to existing building, as well as new construction of a 32,861 SF, 5-story concrete, wood frame multifamily residential rental development featuring 50 units. The project also includes surface and tuck under parking, on-site office space for staff, and common areas including a laundry room, community room, and trash rooms. Jessie Street Terrace Santa Cruz, CA Project consisting of demolition to existing building, as well as new construction of a 32,861 SF, 5-story concrete, wood frame multifamily residential rental development featuring 50 units. The project also includes surface and tuck under parking, on-site office space for staff, and common areas including a laundry room, community room, and trash rooms. Services Provided: Architect of Record: Client: News: Construction Paul Davis Partnership MP Boardwalk Assoicates, L.P. c/o MidPen Housing Corporation None In Progress Residential Parking Structure BACK TO PROJECTS
- Sage Point 7
Prologis Sage Point 7 is a 531,881 SF, 36’ clear height concrete tilt-up warm, dark shell warehouse on 48.34 acres with full site improvements. GameStop, a Fortune 500 company and leading specialty retailer offering games and entertainment products through its E-commerce leasing the warehouse to expand their business and fulfilment capacity in the West Coast. Interior space will be fully built out for GameStop with State-of-the-art technology for the modern distribution needs. Overall project will adhere to the Prologis LEED Volume Program. Sage Point 7 Reno, NV Prologis Sage Point 7 is a 531,881 SF, 36’ clear height concrete tilt-up warm, dark shell warehouse on 48.34 acres with full site improvements. GameStop, a Fortune 500 company and leading specialty retailer offering games and entertainment products through its E-commerce leasing the warehouse to expand their business and fulfilment capacity in the West Coast. Interior space will be fully built out for GameStop with State-of-the-art technology for the modern distribution needs. Overall project will adhere to the Prologis LEED Volume Program. Services Provided: Architect of Record: Client: News: Construction HPA Architects Prologis, LP None Completed 2023 Commercial Instrustrial Prologis LEED Volume BACK TO PROJECTS
- SK Hynix HQ
Design/build project consisting of a 2-story renovation to the existing SK Hynix office and VIP space. The 90,000 SF project features high-end finishes with custom millwork throughout the two-story lobby, CEO, CMO and Executive suites and conference rooms, open office areas with baffle ceilings, as well as a full-service kitchen and cafeteria space to serve the 300+ employees onsite. This project includes a fast-paced construction schedule to accommodate move in within six months. SK Hynix HQ San Jose, CA Design/build project consisting of a 2-story renovation to the existing SK Hynix office and VIP space. The 90,000 SF project features high-end finishes with custom millwork throughout the two-story lobby, CEO, CMO and Executive suites and conference rooms, open office areas with baffle ceilings, as well as a full-service kitchen and cafeteria space to serve the 300+ employees onsite. This project includes a fast-paced construction schedule to accommodate move in within six months. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. SK Hynix None Completed 2024 Tenant Improvement Corporate Design-Build BACK TO PROJECTS