Contact Us
Address
500 Terry Francine St.
San Francisco, CA 94158
Contact
123-456-7890
Opening Hours
Mon - Fri
8:00 am – 8:00 pm
Saturday
9:00 am – 7:00 pm
Sunday
9:00 am – 9:00 pm
Search Results
384 results found with an empty search
- Stanford Crothers Hall
This project includes a 104,342 SF renovation of existing 3- story dormitory buildings to house approximately 378 undergraduate students (84 premier single spaces and 294 non-premier large traditional double spaces). A new Resident Fellow, self contained apartment was added in the renovation, as well as six new offices. A seismic upgrade at the hall brought the structure to current seismic performance standards. Project also includes an HVAC upgrade and architectural remodel. Stanford Crothers Hall Stanford, CA This project includes a 104,342 SF renovation of existing 3- story dormitory buildings to house approximately 378 undergraduate students (84 premier single spaces and 294 non-premier large traditional double spaces). A new Resident Fellow, self contained apartment was added in the renovation, as well as six new offices. A seismic upgrade at the hall brought the structure to current seismic performance standards. Project also includes an HVAC upgrade and architectural remodel. Services Provided: Architect of Record: Client: News: Construction DES Architects Stanford University None Completed 2009 Residential Education BACK TO PROJECTS
- Main Street Village
This 95,809 SF project consists of two buildings totaling 64 residential units with 3,527 SF of commercial space, and 19,668 SF of underground parking. Units range from studio to 3-bedroom, and are transitional housing for the homeless. Building 1 is wood frame and consists of three stories with construction over a concrete podium with underground parking. Building 2 is also wood framed and consists of three stories of construction over slab on grade. In additional to residential units, Building 1 includes office space, computer room, and a community room with kitchen. Building 2 features a meeting room and common laundry facilities. This project is Green Point Rated, and includes a PV system. The site includes new underground onsite and offsite utilities, some off site road improvements, bioswales, and a children's play area and basketball court. The project is funded by several sources including HUD and the City of Fremont. Main Street Village Fremont, CA This 95,809 SF project consists of two buildings totaling 64 residential units with 3,527 SF of commercial space, and 19,668 SF of underground parking. Units range from studio to 3-bedroom, and are transitional housing for the homeless. Building 1 is wood frame and consists of three stories with construction over a concrete podium with underground parking. Building 2 is also wood framed and consists of three stories of construction over slab on grade. In additional to residential units, Building 1 includes office space, computer room, and a community room with kitchen. Building 2 features a meeting room and common laundry facilities. This project is Green Point Rated, and includes a PV system. The site includes new underground onsite and offsite utilities, some off site road improvements, bioswales, and a children's play area and basketball court. The project is funded by several sources including HUD and the City of Fremont. Services Provided: Architect of Record: Client: News: Construction JSWD Architects MidPen Housing Corporation None Completed 2011 Residential Green Point Rated BACK TO PROJECTS
- Bellarmine Lorry I. Lokey Academic Center
This 53,000 SF project consists of a 2-story steel frame and concrete structure. The building features (27) classrooms, (2) multi-purpose rooms, a Learning Resource Center, and a Faculty Lounge complete with offices, meeting rooms, and a kitchen. The project also includes the demolition of the existing building and the installation of approximately (20) portables for use during construction. Bellarmine Lorry I. Lokey Academic Center San Jose, CA This 53,000 SF project consists of a 2-story steel frame and concrete structure. The building features (27) classrooms, (2) multi-purpose rooms, a Learning Resource Center, and a Faculty Lounge complete with offices, meeting rooms, and a kitchen. The project also includes the demolition of the existing building and the installation of approximately (20) portables for use during construction. Services Provided: Architect of Record: Client: News: Construction Steinberg Hart Bellarmine College Preparatory None Completed 2011 Education LEED Gold BACK TO PROJECTS
- Archbishop Mitty Science and Student Life Building
This project features a 17,000 SF 2-story student life and science building consisting of physics and chemistry labs, 2nd floor outdoor terrace, and large student center on first floor. Archbishop Mitty Science and Student Life Building San Jose, CA This project features a 17,000 SF 2-story student life and science building consisting of physics and chemistry labs, 2nd floor outdoor terrace, and large student center on first floor. Services Provided: Architect of Record: Client: News: Construction Steinberg Architects Archbishop Mitty None Completed 2017 Education BACK TO PROJECTS
- Perkins Coie - 3150 Porter
This 36,000 SF remodel of a 2-story law office consists of private offices, break rooms, high density storage, law library, a multi-purpose conferencing center with capabilities to combine the conference rooms into a single open space via moving glass walls; and an internally lit glass feature wall as a reception backdrop extending from the first floor through the second floor lobby, which was converted to a two story space as part of the scope of work. Perkins Coie - 3150 Porter Palo Alto, CA This 36,000 SF remodel of a 2-story law office consists of private offices, break rooms, high density storage, law library, a multi-purpose conferencing center with capabilities to combine the conference rooms into a single open space via moving glass walls; and an internally lit glass feature wall as a reception backdrop extending from the first floor through the second floor lobby, which was converted to a two story space as part of the scope of work. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture Perkins Coie None Completed 2010 Corporate Tenant Improvement BACK TO PROJECTS
- Athleta Headquarters
This project is a 40,000 SF tenant improvement for Athleta Headquarters. Project features used reclaimed wood, sketch doors, polished concrete floors and a yoga studio. Athleta Headquarters Petaluma, CA This project is a 40,000 SF tenant improvement for Athleta Headquarters. Project features used reclaimed wood, sketch doors, polished concrete floors and a yoga studio. Services Provided: Architect of Record: Client: News: Construction IA Interior Architects GAP None Completed 2012 Corporate Tenant Improvement BACK TO PROJECTS
- Tire Rack Warehouse & Office
This 287,040 SF design/build cast-in-place concrete tilt-up warehouse expansion features a 1,400 SF office expansion and warehouse improvements including 7” slab-on-grade, 8” thick concrete tilt-up panel walls, exterior storefront glazing & clerestory windows, panelized roof structure, 1% skylight coverage, 60 mil TPO roofing over R-19 rigid insulation, LED warehouse lighting, warehouse restrooms, six dock positions complete with dock equipment, and four added battery charging stations. Project also includes associated site improvements for truck courts and trailer parking stalls with an on-site detention basin. Tire Rack Warehouse & Office Sparks, NV This 287,040 SF design/build cast-in-place concrete tilt-up warehouse expansion features a 1,400 SF office expansion and warehouse improvements including 7” slab-on-grade, 8” thick concrete tilt-up panel walls, exterior storefront glazing & clerestory windows, panelized roof structure, 1% skylight coverage, 60 mil TPO roofing over R-19 rigid insulation, LED warehouse lighting, warehouse restrooms, six dock positions complete with dock equipment, and four added battery charging stations. Project also includes associated site improvements for truck courts and trailer parking stalls with an on-site detention basin. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. MEPT USA Parkway Distribution Center LLC None Completed 2019 Industrial Center Design-Build LEED V4 Certified BACK TO PROJECTS
- SCU Commons Library Tech Center
This project includes a 185,000 SF structural steel, 3-story above grade, one basement level below grade library for Santa Clara University. Project includes a grab-and-go cafe and coffee bar, data center, high-end viewing/taping rooms for student use, and four exterior terraces. The exterior skin consists of plaster, terra cotta, travertine and limestone, copper paneling, and glazing. 14" deep raised flooring system at first, second and third floors for distribution of all ductwork, electrical, data, and plumbing. This building is LEED registered and features waterless urinals and a reclaimed water system for water closets. SCU Commons Library Tech Center Santa Clara, CA This project includes a 185,000 SF structural steel, 3-story above grade, one basement level below grade library for Santa Clara University. Project includes a grab-and-go cafe and coffee bar, data center, high-end viewing/taping rooms for student use, and four exterior terraces. The exterior skin consists of plaster, terra cotta, travertine and limestone, copper paneling, and glazing. 14" deep raised flooring system at first, second and third floors for distribution of all ductwork, electrical, data, and plumbing. This building is LEED registered and features waterless urinals and a reclaimed water system for water closets. Services Provided: Architect of Record: Client: News: Construction Hardy Holzman Pfieffer Associates Santa Clara University None https://www.scu.edu/environmental-ethics/resources/the-commons-on-kennedy-mall/ Completed 2008 Education LEED Registered BACK TO PROJECTS
- UOP Biological Sciences Center
New 60,000 SF building consisting of classrooms, laboratories and lecture halls. The 2-story building, designed by Fong & Chan Architects in San Francisco, is steel-framed with a brick and precast concrete façade, to tie into the style of the campus. The project includes extensive site development and landscaping. UOP Biological Sciences Center Stockton, CA New 60,000 SF building consisting of classrooms, laboratories and lecture halls. The 2-story building, designed by Fong & Chan Architects in San Francisco, is steel-framed with a brick and precast concrete façade, to tie into the style of the campus. The project includes extensive site development and landscaping. Services Provided: Architect of Record: Client: News: Construction Fong and Chan Architects University of the Pacific None Completed 2008 Education BACK TO PROJECTS
- Hitachi
This project features 39,000 SF tenant improvement on the 4th floor of 3315 Scott Boulevard Building C. Improvement includes private and open offices, copy areas, meeting rooms, break rooms, two presentation rooms, an observation area, and a high-end demo space where new products are presented to customers. Additionally, a new HVAC rooftop unit was installed to supply cooling to a new server room. The main lobby includes polished concrete finish & (2) large main entry glass walls. Hitachi Santa Clara, CA This project features 39,000 SF tenant improvement on the 4th floor of 3315 Scott Boulevard Building C. Improvement includes private and open offices, copy areas, meeting rooms, break rooms, two presentation rooms, an observation area, and a high-end demo space where new products are presented to customers. Additionally, a new HVAC rooftop unit was installed to supply cooling to a new server room. The main lobby includes polished concrete finish & (2) large main entry glass walls. Services Provided: Architect of Record: Client: News: Construction Diehl Group Architects Hitachi America, Ltd. None Completed 2015 Corporate Tenant Improvement BACK TO PROJECTS
- 625-685 Clyde
This project features the demolition of a 4-building campus with new construction of 385,000 SF Class A office space. The new space consists of two 6-story post-tension concrete structures with glass curtain wall and GFRC skin. The buildings also feature round concrete columns and upturned beams/caps hidden under a raised access floor system to create a fully flat underside of deck. The project includes offsite improvements, as well as 8.85 acres of site work; it also consists of a new 5-level and a new 6-level parking structure totaling 320,000 SF, featuring precast skin, glass elevator enclosures, and PV panels at the roof. 625-685 Clyde Mountain View, CA This project features the demolition of a 4-building campus with new construction of 385,000 SF Class A office space. The new space consists of two 6-story post-tension concrete structures with glass curtain wall and GFRC skin. The buildings also feature round concrete columns and upturned beams/caps hidden under a raised access floor system to create a fully flat underside of deck. The project includes offsite improvements, as well as 8.85 acres of site work; it also consists of a new 5-level and a new 6-level parking structure totaling 320,000 SF, featuring precast skin, glass elevator enclosures, and PV panels at the roof. Services Provided: Architect of Record: Client: News: Design, Construction STUDIOS Architecture; Devcon Construction, Inc. TMG Partners None Completed 2014 Corporate LEED Platinum BACK TO PROJECTS
- Devcon Construction, Inc. | Design
Our strong, internal design team offers limitless resources and experience for developers, owners and architectural firms. Having an in-house design team allows us to deliver a synchronized communication style with consultants and clients alike throughout all phases of design and construction in an otherwise fragmented process. ABOUT HISTORY CULTURE DESIGN AWARDS MANAGEMENT More DESIGN ...we build what we design DESIGN Our strong, internal design team offers limitless resources and experience for developers, owners and architectural firms. Having an in-house design team allows us to deliver a synchronized communication style with consultants and clients alike throughout all phases of design and construction in an otherwise fragmented process. Revit and advanced rendering software provide a collaborative platform for communicating knowledgeably and efficiently with our architectural, consultant and trade partners through 3-dimensional visualization and graphic communication. Designers at Devcon have the opportunity to engage every stage of the project from conceptual design to construction completion. This is a unique experience in the design community as many traditional design firms engage a specific stage of project design and allow for specialization only in that singular stage. By partnering internally, we also become a resource for our own construction teams and our construction teams become a resource for our design teams, each providing insight into questions concerning construction detail and specifications. We take the concept of team very seriously at Devcon, by encouraging strong performance by both our design and construction departments, whether they are supporting a complete design build model or an integrated project delivery method. 45 DESIGNERS 5 INTERIOR DESIGNERS 13 ARCHITECTS 5 BIM ENGINEERS DESIGN-BUILD The idea behind the Design-Build model of construction may seem obvious, yet the benefits of working with a true Design-Build firm like Devcon go well beyond the basic concept of the architect and the builder operating under the same contract. By integrating in-house design and construction management since its inception, Devcon has developed a professional environment of collaboration and continual conversation between highly trained and experienced professionals. This communication style allows Devcon to produce quality projects in a shortened timeline compared to a traditional Design-Bid-Build project delivery method. This collaborative instinct carries over to Devcon’s long and established partnerships with hundreds of independent architects and engineers. Taking pride in the level of design provided by our own internal architecture and design teams, we are a qualified and dedicated resource for owners, developers, architects and engineers. As a result, we are often called upon to take a Design Assist role to support an independent architect or engineer with construction plans and documents. DESIGN PROJECT ACQUISITION INTEGRATED PROJECT DELIVERY INTEGRATED DESIGN-BUILD DESIGN-BUILD SUBCONTRACTING RECENT DESIGN-BUILD PROJECTS Caribbean Creative Campus This iconic project consists of two new steel framed, stepped buildings totaling 1,000,000 SF and feature sloping green roofs that provide walking access and exterior site amenities at each floor. SEE PROJECT 490 Mathilda The project includes a new commercial three-story office building with CLT and a mechanical penthouse with 2.5 levels of below grade parking. The building will include useable outdoor areas on parking podium, second, third and roof top levels. SEE PROJECT Cityline Block 3 The project includes office, retail, and lobby space, and also features construction of two new streets, outdoor plazas and elaborate sitework featuring precast planters, unit pavers and stainless steel trellis above an ipe wood deck. SEE PROJECT San Antonio Village North Design/build mixed-use project organized into six buildings including retail spaces, restaurant spaces, and a theater. SEE PROJECT SK Hynix HQ The 90,000 SF project features high-end finishes with custom millwork throughout the two-story lobby, CEO, CMO and Executive suites and conference rooms, open office areas with baffle ceilings, as well as a full-service kitchen and cafeteria space to serve the 300+ employees onsite. SEE PROJECT Tech CU Arena The 20,000 SF addition includes a 4,200 seat AHL stadium rink with adjoining practice rink & commissary building complete with locker rooms, commissary kitchen & concessions, large scale restroom facilities, and a professional locker room. SEE PROJECT MORE DESIGN BUILD PROJECTS












