Search Results
Search this site
397 results found with an empty search
- 690 East Middlefield
Construction and architectural services were provided for these new design build office buildings which consist of two 170,000 SF, 5-story office buildings on a 17 acre site. The buildings are steel structures with curtain wall and GFRC exterior systems which feature a complex site development and extensive landscaping. All major building systems (Arch, Struct, Mech, Elect, Plumbing, Fire Sprinkler, Skin systems) were modeled in 3D and clash detection software was utilized to identify and resolve conflicts. This tool was utilized throughout design and construction as owner changes were implemented to the drawings in order to coordinate building systems ahead of field installation. 690 East Middlefield Mountain View, CA Construction and architectural services were provided for these new design build office buildings which consist of two 170,000 SF, 5-story office buildings on a 17 acre site. The buildings are steel structures with curtain wall and GFRC exterior systems which feature a complex site development and extensive landscaping. All major building systems (Arch, Struct, Mech, Elect, Plumbing, Fire Sprinkler, Skin systems) were modeled in 3D and clash detection software was utilized to identify and resolve conflicts. This tool was utilized throughout design and construction as owner changes were implemented to the drawings in order to coordinate building systems ahead of field installation. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Kilroy Realty Corp. None Completed 2014 Corporate Design-Build LEED Gold BACK TO PROJECTS
- Camden Park
This project consists of 120,000 SF wood framed buildings, strip commercial center with extensive onsite and offsite work with complete tenant improvements. Camden Park San Jose, CA This project consists of 120,000 SF wood framed buildings, strip commercial center with extensive onsite and offsite work with complete tenant improvements. Services Provided: Architect of Record: Client: News: Construction NA Keenan Land Co. None Completed 2000 Retail BACK TO PROJECTS
- Andy Bloom | Devcon
Previous Andy Bloom Vice President of Construction The construction industry has always been part of Andy Bloom’s DNA being raised around his family’s general contracting company in California’s Central Valley. Growing up, Andy’s summers were spent working as a laborer on concrete tilt-ups before attending Santa Clara University and earning a Bachelor of Science in Civil Engineering. While at Santa Clara University, he was hired at Devcon Construction as a Project Engineer intern in 2004 and has been with the company since. “As long as I can remember, I knew I was going to be a general contractor; however, it has exceeded all expectations being part of such highly regarded and successful company,” Bloom states. In his role as Vice President of Construction, Bloom’s responsibilities include serving as Devcon’s contact for clients while providing pre-construction, estimating, design management, and scheduling services. During the construction phase, he ensures these services translate to maximum project efficiency and project cost controls. During his time at Devcon, Bloom has been involved with several high-profile clients in a variety of industries – tech companies, professional sports teams, higher education institutions, and venture capitalists. Reflecting on his experience, Bloom says, “Being involved with these large projects is very rewarding, but not without its challenges. Every day is a new challenge, but I could not be prouder to work daily with my fellow Devcon teammates and represent Devcon at the highest level. I look forward to each day and continue to evolve with the latest Silicon Valley has to offer.” Next
- SCU Steve Schott Stadium
NCAA Division I baseball stadium comprised of ball field and approximately 20,000 SF of building space. The playing field, which measures 400 feet to center field, uses a slit-sand system for drainage. Both chair backs and bleachers are provided to accommodate 1,500 spectators. Locker rooms, showers, and a trainer's area make up both the home and visiting team locker buildings. In addition, the home team locker room features a team room equipped for live game feeds, team meetings, and press conferences. The VIP building houses both a luxury box and a press box. A concession/ticket building and a hitting center make up the last two buildings onsite. SCU Steve Schott Stadium Santa Clara, CA NCAA Division I baseball stadium comprised of ball field and approximately 20,000 SF of building space. The playing field, which measures 400 feet to center field, uses a slit-sand system for drainage. Both chair backs and bleachers are provided to accommodate 1,500 spectators. Locker rooms, showers, and a trainer's area make up both the home and visiting team locker buildings. In addition, the home team locker room features a team room equipped for live game feeds, team meetings, and press conferences. The VIP building houses both a luxury box and a press box. A concession/ticket building and a hitting center make up the last two buildings onsite. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2005 Athletic Center BACK TO PROJECTS
- 260 California
This 44,459 SF design/build 3-story mixed-use concrete structure has one level of subterranean parking and one level of podium parking. The project features a warm shell and core designed for food service on the first level and two stories of office space above. Excavation includes a soldier beam and lagging system with tie backs and underpinning of adjacent buildings. The exterior skin is composed of thin-set stone tile, colored plaster, and an aluminum glazing system. The building is adjacent to public transportation, utilizes sustainable materials, and is designed for maximum water and energy efficiency. 260 California Palo Alto, CA This 44,459 SF design/build 3-story mixed-use concrete structure has one level of subterranean parking and one level of podium parking. The project features a warm shell and core designed for food service on the first level and two stories of office space above. Excavation includes a soldier beam and lagging system with tie backs and underpinning of adjacent buildings. The exterior skin is composed of thin-set stone tile, colored plaster, and an aluminum glazing system. The building is adjacent to public transportation, utilizes sustainable materials, and is designed for maximum water and energy efficiency. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Tarob M&C Investors, LLC None Completed 2015 Corporate Design-Build BACK TO PROJECTS
- Royal Presidio
Historical restoration of the first stone building and first cathedral in California. 4,500 SF project includes removal of the exterior plaster, stone de-pointing and re-pointing, steel pin and rod containment, re-plastering of the exterior and full interior restoration. Royal Presidio Monterey, CA Historical restoration of the first stone building and first cathedral in California. 4,500 SF project includes removal of the exterior plaster, stone de-pointing and re-pointing, steel pin and rod containment, re-plastering of the exterior and full interior restoration. Services Provided: Architect of Record: Client: News: Construction Franks Brenkwitz + Associates Diocese of Monterey None Completed 2008 Historical Tenant Improvement BACK TO PROJECTS
- Archbishop Mitty Science and Student Life Building
This project features a 17,000 SF 2-story student life and science building consisting of physics and chemistry labs, 2nd floor outdoor terrace, and large student center on first floor. Archbishop Mitty Science and Student Life Building San Jose, CA This project features a 17,000 SF 2-story student life and science building consisting of physics and chemistry labs, 2nd floor outdoor terrace, and large student center on first floor. Services Provided: Architect of Record: Client: News: Construction Steinberg Architects Archbishop Mitty None Completed 2017 Education BACK TO PROJECTS
- Cityline Block 3
900,000 SF design/build project consisting of core & shell of two 300,000 SF 7-story high-rise steel structures on podium above a 300,000 SF, 2-story below grade garage housing 800 vehicles, on approximately 175,000 SF of site. The project includes office, retail, and lobby space, and also features construction of two new streets, outdoor plazas and elaborate sitework featuring precast planters, unit pavers and stainless steel trellis above an ipe wood deck. The building exterior skin consists of precast and a unitized glass curtain wall system with integral terracotta. The project will receive a LEED GOLD rating. Cityline Block 3 Sunnyvale, CA 900,000 SF design/build project consisting of core & shell of two 300,000 SF 7-story high-rise steel structures on podium above a 300,000 SF, 2-story below grade garage housing 800 vehicles, on approximately 175,000 SF of site. The project includes office, retail, and lobby space, and also features construction of two new streets, outdoor plazas and elaborate sitework featuring precast planters, unit pavers and stainless steel trellis above an ipe wood deck. The building exterior skin consists of precast and a unitized glass curtain wall system with integral terracotta. The project will receive a LEED GOLD rating. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction (AOR) Hunter Properties None In Progress Corporate, Design-Build Parking Structure BACK TO PROJECTS
- Stanford Northwest Data Center
This project included a design/build purpose built single story 9,200 SF CMU structure to house critical data processing (data center) and communications equipment (communications hub) and an emergency call center. The data center houses 96 server racks and associated network racks for critical systems. The communications hub houses 32 network racks and additional fiber distribution frames, and is part of a campus wide network of redundant hubs which are designed to remain functional after a major earthquake or similar event. The call center is a back-up facility to be used in the event the main call center is rendered inoperable. Stanford Northwest Data Center Stanford, CA This project included a design/build purpose built single story 9,200 SF CMU structure to house critical data processing (data center) and communications equipment (communications hub) and an emergency call center. The data center houses 96 server racks and associated network racks for critical systems. The communications hub houses 32 network racks and additional fiber distribution frames, and is part of a campus wide network of redundant hubs which are designed to remain functional after a major earthquake or similar event. The call center is a back-up facility to be used in the event the main call center is rendered inoperable. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Stanford University None Completed 2014 Data Center Design-Build BACK TO PROJECTS
- SCU Leavey School of Business
This 85,000 design/build consists of a three-story building and the build-out will include a mix of 100 faculty offices, 20,000 SF of open office, full coffee bar/café, (8) classrooms, (2) seminar spaces and one large dividable (100) seat seminar space. The Leavey School of Business was designed by Devcon Architecture and built by Devcon Construction. The construction team collaborated with the design team which included design build MEPs to develop the design of the structure. The construction team was active in reviewing and commenting on details to ensure that all details were coordinated and constructible. At key milestones of document development (including 100% design drawings, 50% construction drawings and 100% construction drawings) the construction team prepared budgets to ensure that the design was within the budget constraints established by our client. Value engineering was regularly introduced to maintain control of costs and provide the client with high quality construction at the most reasonable cost. Prior to bidding the project Devcon Construction developed bid documents to thoroughly identify the required scopes of work for all trades. These scope statements were then packaged with the construction documents (including plans, specifications, soils reports) were then issued to 3 bidders for each scope of work. Each of the firms allowed to bid the project previously successfully completed projects of similar size and complexity with Devcon Construction. These firm have demonstrated high quality workmanship and sound financial condition. SCU Leavey School of Business Santa Clara, CA This 85,000 design/build consists of a three-story building and the build-out will include a mix of 100 faculty offices, 20,000 SF of open office, full coffee bar/café, (8) classrooms, (2) seminar spaces and one large dividable (100) seat seminar space. The Leavey School of Business was designed by Devcon Architecture and built by Devcon Construction. The construction team collaborated with the design team which included design build MEPs to develop the design of the structure. The construction team was active in reviewing and commenting on details to ensure that all details were coordinated and constructible. At key milestones of document development (including 100% design drawings, 50% construction drawings and 100% construction drawings) the construction team prepared budgets to ensure that the design was within the budget constraints established by our client. Value engineering was regularly introduced to maintain control of costs and provide the client with high quality construction at the most reasonable cost. Prior to bidding the project Devcon Construction developed bid documents to thoroughly identify the required scopes of work for all trades. These scope statements were then packaged with the construction documents (including plans, specifications, soils reports) were then issued to 3 bidders for each scope of work. Each of the firms allowed to bid the project previously successfully completed projects of similar size and complexity with Devcon Construction. These firm have demonstrated high quality workmanship and sound financial condition. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2008 Education Design-Build BACK TO PROJECTS
- Channel Park Condos
202,000 SF seven-story post tension concrete structure with 100 condominium units with interior parking. Exterior consists of limestone plaster, curtainwall and casement windows. Interior construction for this high-end Mission Bay condominium complex includes European cabinetry and fixtures, hardwood and marble floors, and granite counters. Third floor features an exterior courtyard with surrounding landscaping. Channel Park Condos San Francisco, CA 202,000 SF seven-story post tension concrete structure with 100 condominium units with interior parking. Exterior consists of limestone plaster, curtainwall and casement windows. Interior construction for this high-end Mission Bay condominium complex includes European cabinetry and fixtures, hardwood and marble floors, and granite counters. Third floor features an exterior courtyard with surrounding landscaping. Services Provided: Architect of Record: Client: News: Construction MVE Partners Signature Properties/The Riding Group None Completed 2004 Residential BACK TO PROJECTS
- Stanford Federal Credit Union
This 1,200 SF design/ build tenant improvement established the Stanford Credit Union presence on the Stanford Redwood City Campus. The project consists of exterior precast modifications, high security protocols, ATM, and bank equipment integration and installation. Stanford Federal Credit Union Redwood City, CA This 1,200 SF design/ build tenant improvement established the Stanford Credit Union presence on the Stanford Redwood City Campus. The project consists of exterior precast modifications, high security protocols, ATM, and bank equipment integration and installation. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Stanford Federal Credit Union None Completed 2019 Banking / Finance Tenant Improvement Design-Build BACK TO PROJECTS












