  • Powell Street Plaza

    Description not available Powell Street Plaza Emerville, CA Description not available Services Provided: Architect of Record: Client: News: Construction Not available Christie Avenue Partners None Completed 1990 Retail BACK TO PROJECTS

  • 601 Marshall

    This 250,000 SF project consists of an 8-story above grade building and a 2-story below grade parking garage to accommodate 255 vehicles. Project features 120,000 SF of office space with ground floor commercial/retail space. 601 Marshall Redwood City, CA This 250,000 SF project consists of an 8-story above grade building and a 2-story below grade parking garage to accommodate 255 vehicles. Project features 120,000 SF of office space with ground floor commercial/retail space. Services Provided: Architect of Record: Client: News: Construction KSHA Dostart Development Company None Completed 2018 Corporate Retail LEED Platinum BACK TO PROJECTS

  • Tahoe Maritime Museum

    This project includes a 6,000 SF 2-story steel frame building with wood infill, wood siding and metal standing seem roof. This project houses the collection of wooden boats and celebrates the maritime history of Lake Tahoe. Challenges include saturated site conditions, an aggressive construction schedule, and tight project space conditions along with the difficulty of building at Lake Tahoe through a winter. Tahoe Maritime Museum Homewood, CA This project includes a 6,000 SF 2-story steel frame building with wood infill, wood siding and metal standing seem roof. This project houses the collection of wooden boats and celebrates the maritime history of Lake Tahoe. Challenges include saturated site conditions, an aggressive construction schedule, and tight project space conditions along with the difficulty of building at Lake Tahoe through a winter. Services Provided: Architect of Record: Client: News: Construction Cox & Kromydas Architects Tahoe Maritime Museum Buildin None Completed 2008 Museum / Gallery BACK TO PROJECTS

  • San Jose Barracudas Locker Room

    This 6,500 SF design/build project consists of a new two-story building located between rinks 2, 3, and 4 on the east side of the existing facility. The structural system consists of pre-engineered steel and is seismically separated from the existing structure. The new area features locker and training facilities to house the American Hockey League relocating from the East Coast, as well as coach’s offices, fitness center, lockers, showers, skate shop and stick shop. The new area offers restricted access and is not open to the public. Sitework and landscaping is limited to the immediate surrounding area due to impact of the new building. San Jose Barracudas Locker Room San Jose, CA This 6,500 SF design/build project consists of a new two-story building located between rinks 2, 3, and 4 on the east side of the existing facility. The structural system consists of pre-engineered steel and is seismically separated from the existing structure. The new area features locker and training facilities to house the American Hockey League relocating from the East Coast, as well as coach’s offices, fitness center, lockers, showers, skate shop and stick shop. The new area offers restricted access and is not open to the public. Sitework and landscaping is limited to the immediate surrounding area due to impact of the new building. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Sharks Ice LLC None Completed 2015 Athletic Center Design-Build BACK TO PROJECTS

  • Franklin Templeton Investments Data Center

    This 25,000 SF warm shell build out includes a new data center and support rooms in an existing tilt-up concrete shell and site work. Devcon used BIM to 3D model the Data Center and Chiller Plant before construction began. Franklin Templeton Investments Data Center Stockton, CA This 25,000 SF warm shell build out includes a new data center and support rooms in an existing tilt-up concrete shell and site work. Devcon used BIM to 3D model the Data Center and Chiller Plant before construction began. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Franklin Templeton Companies None Completed 2010 Data Center Design-Build LEED Silver BACK TO PROJECTS

  • Notre Dame Center for Women's Leadership

    This 29,000 SF project consists of a 3-story classroom building, featuring a new landscaped plaza and parking lot that connects the new building with the existing campus. The steel structure with a stucco and metal panel exterior provides four hands-on-learning labs, including an Engineering Lab and Arts & Technology Lab -- nine classrooms, a Center for Career & Life Success, Campus Ministry Center with dedicated space for prayer and meditation, and a gallery celebrating Women of Impact. Notre Dame Center for Women's Leadership San Jose, CA This 29,000 SF project consists of a 3-story classroom building, featuring a new landscaped plaza and parking lot that connects the new building with the existing campus. The steel structure with a stucco and metal panel exterior provides four hands-on-learning labs, including an Engineering Lab and Arts & Technology Lab -- nine classrooms, a Center for Career & Life Success, Campus Ministry Center with dedicated space for prayer and meditation, and a gallery celebrating Women of Impact. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc Notre Dame High School None Completed 2020 Education Design-Build Interiors Notre Dame High School BACK TO PROJECTS

  • Cupertino Tech Campus

    This 317,000 SF project consists of a 77,000 SF state of the art 2-story above ground building, and a 4-level parking garage with 3-levels below grade; the parking garage provides 600 vehicle spaces. The building is a concrete structure with perimeter full height glass, raised access flooring, lobby with feature stair case and stone walls, and a 200 seat theater in addition to the tenant improvements. Tenant improvements consists of high end finishes and rooms such as briefing centers, pods, labs, Alpi Veneer paneling, custom wood ceilings, custom fabric ceilings and custom 12’ high acoustical storefront system. Cupertino Tech Campus Cupertino, CA This 317,000 SF project consists of a 77,000 SF state of the art 2-story above ground building, and a 4-level parking garage with 3-levels below grade; the parking garage provides 600 vehicle spaces. The building is a concrete structure with perimeter full height glass, raised access flooring, lobby with feature stair case and stone walls, and a 200 seat theater in addition to the tenant improvements. Tenant improvements consists of high end finishes and rooms such as briefing centers, pods, labs, Alpi Veneer paneling, custom wood ceilings, custom fabric ceilings and custom 12’ high acoustical storefront system. Services Provided: Architect of Record: Client: News: Construction Foster and Partners, HNA Pacific and The Hayes Group Confidential None Completed 2020 Corporate Tenant Improvement BACK TO PROJECTS

  • Santana West

    13-acre commercial development in San Jose adjacent to Santana Row. Project consists of demolition to existing theaters, with construction of a 376,000 SF, 8-story concrete office building over two levels of underground parking, approximately 136,000 SF. This core and shell office space also includes curtains walls, metal panels and structural glazing. Santana West San Jose, CA 13-acre commercial development in San Jose adjacent to Santana Row. Project consists of demolition to existing theaters, with construction of a 376,000 SF, 8-story concrete office building over two levels of underground parking, approximately 136,000 SF. This core and shell office space also includes curtains walls, metal panels and structural glazing. Services Provided: Architect of Record: Client: News: Construction Studios Architecture Federal Realty Investment Trust None https://api.ibeamsystems.com/?session=U2FudGFuYVdlc3Q6U2FuSm9zZUNB Completed 2022 Corporate Self-Perform BACK TO PROJECTS

  • 488 Almaden

    Seventeen-story high rise located in the heart of downtown San Jose. This structural steel office building with precise concrete panels, glass and glazing skin consists of 381,001 square feet along with one eleven-story parking garage (three levels below grade) consisting of 440,017 square feet. 488 Almaden San Jose, CA Seventeen-story high rise located in the heart of downtown San Jose. This structural steel office building with precise concrete panels, glass and glazing skin consists of 381,001 square feet along with one eleven-story parking garage (three levels below grade) consisting of 440,017 square feet. Services Provided: Architect of Record: Client: News: Construction Korth Sunseri Hagey Architects Sobrato Development None Completed 2003 Corporate Steel Construction BACK TO PROJECTS

  • Harmonic

    This 188,000 SF tenant improvement build-out of existing cold shell was originally designed and constructed by Devcon. Architectural upgrades include new finishes throughout, partition and ceiling work to accommodate acoustical concerns, restroom cores for future offices, and a new employee entry area. Structural upgrades include modifications to the existing structure to accommodate new rooftop mechanical systems, new lobby and central stairwells, and an exterior shipping and storage shed. Mechanical, electrical, and plumbing upgrades include new rooftop DX boxcar mechanical units, new ALC control system, 800 kW emergency generator, 600 kVA flywheel UPS, interior and exterior lighting, HHW and DHW skids, NG, condensate, and CDA systems, to serve a variety of areas including lab space, server/IDF/MDF areas, open office, private offices, warehouse, café, and gym. Harmonic San Jose, CA This 188,000 SF tenant improvement build-out of existing cold shell was originally designed and constructed by Devcon. Architectural upgrades include new finishes throughout, partition and ceiling work to accommodate acoustical concerns, restroom cores for future offices, and a new employee entry area. Structural upgrades include modifications to the existing structure to accommodate new rooftop mechanical systems, new lobby and central stairwells, and an exterior shipping and storage shed. Mechanical, electrical, and plumbing upgrades include new rooftop DX boxcar mechanical units, new ALC control system, 800 kW emergency generator, 600 kVA flywheel UPS, interior and exterior lighting, HHW and DHW skids, NG, condensate, and CDA systems, to serve a variety of areas including lab space, server/IDF/MDF areas, open office, private offices, warehouse, café, and gym. Services Provided: Architect of Record: Client: News: Construction Interior Architects Harmonic None Completed 2010 Corporate Tenant Improvement BACK TO PROJECTS

  • Berkeley Commons

    This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Berkeley Commons Berkeley, CA This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Services Provided: Architect of Record: Client: News: Construction Gensler Lane Partners None Completed 2024 Commercial LEED Gold BACK TO PROJECTS