Contact Us
Address
500 Terry Francine St.
San Francisco, CA 94158
Contact
123-456-7890
Opening Hours
Mon - Fri
8:00 am – 8:00 pm
Saturday
9:00 am – 7:00 pm
Sunday
9:00 am – 9:00 pm
Search Results
384 results found with an empty search
- Bay Street Condos
This project consists of a 112,000 SF construction of (95) condominiums, two-story units on top of existing two-story concrete structure. Project features courtyards with landscaping. Existing structure has first level operating retail and second level parking. Framing system is a steel tube panelized system. Bay Street Condos Emeryville, CA This project consists of a 112,000 SF construction of (95) condominiums, two-story units on top of existing two-story concrete structure. Project features courtyards with landscaping. Existing structure has first level operating retail and second level parking. Framing system is a steel tube panelized system. Services Provided: Architect of Record: Client: News: Construction SB Architects Bay Street Housing Partners LP, MacFarlane Partners None Completed 2006 Residential BACK TO PROJECTS
- State Compensation Insurance Fund
This project consists of three new 2-story buildings totaling 259,890 SF on a 32-acre site in the Vacaville, between Interstate 80 and Highway 505 at the intersection of Horse Creek Drive and Grassland Drive in the Vacaville Valley Business Park. The project site was master planned for a total build out of 430,000 SF (five each, 86,000 SF buildings) and required about 400 surface parking spaces per building. One of the buildings contains State Fund’s primary data center. The photovoltaic system generates up to 225kwH annually. State Compensation Insurance Fund Vacaville, CA This project consists of three new 2-story buildings totaling 259,890 SF on a 32-acre site in the Vacaville, between Interstate 80 and Highway 505 at the intersection of Horse Creek Drive and Grassland Drive in the Vacaville Valley Business Park. The project site was master planned for a total build out of 430,000 SF (five each, 86,000 SF buildings) and required about 400 surface parking spaces per building. One of the buildings contains State Fund’s primary data center. The photovoltaic system generates up to 225kwH annually. Services Provided: Architect of Record: Client: News: Construction HOK State Compensation Insurance Fund None Completed 2008 Data Center LEED Silver BACK TO PROJECTS
- Donner Lofts
This 108,608 SF project features a six-story Type III over podium wood frame multi-family rental development consisting of 102 housing units, a parking garage, commercial and community space, onsite office space for staff, and common areas including a laundry room and courtyard. Donner Lofts San Jose, CA This 108,608 SF project features a six-story Type III over podium wood frame multi-family rental development consisting of 102 housing units, a parking garage, commercial and community space, onsite office space for staff, and common areas including a laundry room and courtyard. Services Provided: Architect of Record: Client: News: Construction HKIT Architects MidPen Housing Corporation None Completed 2016 Residential BACK TO PROJECTS
- SCU Leavey Locker Room
This project consists of a new 4,000 SF state-of-the-art locker room and training center for the men’s and women’s basketball teams. Located on the ground level of the Leavey Center, the locker rooms feature custom cherry lockers installed on a radius wall, each with back-lit displays, dedicated power/usb ports, and leather seating. The ceilings of both locker rooms will have a video graphic display on a floating soffit, and large flat screen LED TVs. Project includes team showers and restroom facilities with custom ceramic tile logos, two player lounges with leather seating, LED TVs and café bars with stainless steel appliances. The coach’s rooms offer private offices, cherry lockers, as well as showers and restrooms. Project also features a central training center that adjoins both team spaces with custom taping tables, ice machines, and training staff office. SCU Leavey Locker Room Santa Clara, CA This project consists of a new 4,000 SF state-of-the-art locker room and training center for the men’s and women’s basketball teams. Located on the ground level of the Leavey Center, the locker rooms feature custom cherry lockers installed on a radius wall, each with back-lit displays, dedicated power/usb ports, and leather seating. The ceilings of both locker rooms will have a video graphic display on a floating soffit, and large flat screen LED TVs. Project includes team showers and restroom facilities with custom ceramic tile logos, two player lounges with leather seating, LED TVs and café bars with stainless steel appliances. The coach’s rooms offer private offices, cherry lockers, as well as showers and restrooms. Project also features a central training center that adjoins both team spaces with custom taping tables, ice machines, and training staff office. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2015 Education Athletic Center Design-Build BACK TO PROJECTS
- 353 Julian
This 194,000 SF project features one 6-story structural steel office building with sitework and tenant Improvements. The building’s exterior consists of GFRC panels with punched opening glazing, as well as slanted curtain wall glass to match the design of the two existing office buildings on the campus. The 6th floor of the building includes one large outdoor balcony space with two smaller balconies. Interior improvements consist of office use space for the County of Santa Clara’s Social Services Department as well as 1st floor training rooms and child care areas. Sitework features a new surface parking lot and landscaped patio areas. 353 Julian San Jose, CA This 194,000 SF project features one 6-story structural steel office building with sitework and tenant Improvements. The building’s exterior consists of GFRC panels with punched opening glazing, as well as slanted curtain wall glass to match the design of the two existing office buildings on the campus. The 6th floor of the building includes one large outdoor balcony space with two smaller balconies. Interior improvements consist of office use space for the County of Santa Clara’s Social Services Department as well as 1st floor training rooms and child care areas. Sitework features a new surface parking lot and landscaped patio areas. Services Provided: Architect of Record: Client: News: Construction ArcTec The Sobrato Organization None Completed 2019 Corporate Tenant Improvement BACK TO PROJECTS
- 341 California
This 8,596 SF design/build two-story remodel project includes restaurant use on the first floor and office use on the second floor. The project improvements to the building, which was originally built in 1955, include removal of existing asbestos, replacement of old mechanical/electrical/plumbing equipment with modern systems, new energy efficient glazing system windows, installation of structural/seismic improvements, and a new energy efficient white roof to improve the seismic stability of the building. Project also features upgraded restrooms and entries to improve accessibility, exterior paint, replacement of sunscreens and additional exterior landscaping. The renovation improves the safety, energy efficiency and the appearance of the existing building. In addition, there are also (ADA) accessibility improvements consisting of the new stairs and restrooms, access from the public way, as well as a fire sprinkler system. 341 California Palo Alto, CA This 8,596 SF design/build two-story remodel project includes restaurant use on the first floor and office use on the second floor. The project improvements to the building, which was originally built in 1955, include removal of existing asbestos, replacement of old mechanical/electrical/plumbing equipment with modern systems, new energy efficient glazing system windows, installation of structural/seismic improvements, and a new energy efficient white roof to improve the seismic stability of the building. Project also features upgraded restrooms and entries to improve accessibility, exterior paint, replacement of sunscreens and additional exterior landscaping. The renovation improves the safety, energy efficiency and the appearance of the existing building. In addition, there are also (ADA) accessibility improvements consisting of the new stairs and restrooms, access from the public way, as well as a fire sprinkler system. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction Cal Partners None Completed 2014 Tenant Improvement BACK TO PROJECTS
- Lawson Lane East Garage
Project consists of 270,376 SF design/build long-span, 5-story concrete parking garage to house approximately 880 vehicles. This project is a LEED Gold Award winner. Lawson Lane East Garage Santa Clara, CA Project consists of 270,376 SF design/build long-span, 5-story concrete parking garage to house approximately 880 vehicles. This project is a LEED Gold Award winner. Services Provided: Architect of Record: Client: News: Design, Construction International Parking Design The Sobrato Organization None Completed 2013 Parking Structure Sustainable LEED Gold BACK TO PROJECTS
- Hanover and Page Mill Building
This project consists of a new 2-story structure totaling approximately 136,000 SF of warm shell and core, which includes a 49,000 SF basement level for parking. Skin consists of a combination of GFRC, metal paneling/cladding, and curtainwall/storefront systems. The project features new sitework throughout, efficient MEP systems and exterior skin elements. The project has zero net energy goals and is a LEED Platinum Award Winner. Hanover and Page Mill Building Palo Alto, CA This project consists of a new 2-story structure totaling approximately 136,000 SF of warm shell and core, which includes a 49,000 SF basement level for parking. Skin consists of a combination of GFRC, metal paneling/cladding, and curtainwall/storefront systems. The project features new sitework throughout, efficient MEP systems and exterior skin elements. The project has zero net energy goals and is a LEED Platinum Award Winner. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture Hanover Page Mill Associates LP None https://www.e-architect.com/sanfrancisco/hanover-page-mill-palo-alto-building https://www.architectmagazine.com/project-gallery/hanover-page-mill https://archello.com/project/hanover-page-mill Completed 2015 Corporate Stanford Research Park LEED Platinum BACK TO PROJECTS
- Accel Partners
This 23,000 SF tenant improvement project within a 3-story building consists of high-end finishes, extensive recessed AV with mostly all specialty ceilings. Project also features roof finishes and usage. Accel Partners Palo Alto, CA This 23,000 SF tenant improvement project within a 3-story building consists of high-end finishes, extensive recessed AV with mostly all specialty ceilings. Project also features roof finishes and usage. Services Provided: Architect of Record: Client: News: Construction TMDA Accel Partners None Completed 2020 Corporate Tenant Improvement BACK TO PROJECTS
- Via Tivoli
This project consists of a multi-pavilion estate residence located on ten acre parcel in Southern Nevada. The major buildings and other architectural elements are steel structure with steel studs. Exterior wall cladding and paving consist of custom quarried European limestone. The project features multiple courtyards with interconnecting water features and pools. The interior architectural design is commensurate with the overall design and incorporates extensive lighting detail, fixtures, and finishes. Via Tivoli Henderson, NV This project consists of a multi-pavilion estate residence located on ten acre parcel in Southern Nevada. The major buildings and other architectural elements are steel structure with steel studs. Exterior wall cladding and paving consist of custom quarried European limestone. The project features multiple courtyards with interconnecting water features and pools. The interior architectural design is commensurate with the overall design and incorporates extensive lighting detail, fixtures, and finishes. Services Provided: Architect of Record: Client: News: Construction Kling Stubbins Confidential None Completed 2007 Residential BACK TO PROJECTS
- 556 Santa Cruz
21,891 SF project consisting of new mixed-use 3-story building over one floor of at-grade parking. Project features retail and parking at ground floor, office at second level, and four residential apartment units at the third floor. This project provides vehicular site and parking access to the adjoining parcels on Merrill Street and Santa Cruz Avenue. 556 Santa Cruz Menlo Park, CA 21,891 SF project consisting of new mixed-use 3-story building over one floor of at-grade parking. Project features retail and parking at ground floor, office at second level, and four residential apartment units at the third floor. This project provides vehicular site and parking access to the adjoining parcels on Merrill Street and Santa Cruz Avenue. Services Provided: Architect of Record: Client: News: Construction Hayes Group Architects 500 SC Partners None Completed 2020 Corporate Retail Residential BACK TO PROJECTS
- 1841 Page Mill
This project consists of a complete renovation of two lobbies including interior and exterior upgrades. The exterior features new glass curtain wall entries, new roof structure and structural upgrades. The interior consists of new stairs and glass rails, updated restrooms, new shower and locker rooms, and new architectural finishes throughout. Site work includes new concrete stairs and ramp entries, site railings, and new landscaping. 1841 Page Mill Palo Alto, CA This project consists of a complete renovation of two lobbies including interior and exterior upgrades. The exterior features new glass curtain wall entries, new roof structure and structural upgrades. The interior consists of new stairs and glass rails, updated restrooms, new shower and locker rooms, and new architectural finishes throughout. Site work includes new concrete stairs and ramp entries, site railings, and new landscaping. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture The Lionstone Group None Completed 2011 Corporate Stanford Research Park BACK TO PROJECTS












