top of page
Devcon_Logo_wTaglines.png

Search Results

384 results found with an empty search

  • 625-685 Clyde

    This project features the demolition of a 4-building campus with new construction of 385,000 SF Class A office space. The new space consists of two 6-story post-tension concrete structures with glass curtain wall and GFRC skin. The buildings also feature round concrete columns and upturned beams/caps hidden under a raised access floor system to create a fully flat underside of deck. The project includes offsite improvements, as well as 8.85 acres of site work; it also consists of a new 5-level and a new 6-level parking structure totaling 320,000 SF, featuring precast skin, glass elevator enclosures, and PV panels at the roof. 625-685 Clyde Mountain View, CA This project features the demolition of a 4-building campus with new construction of 385,000 SF Class A office space. The new space consists of two 6-story post-tension concrete structures with glass curtain wall and GFRC skin. The buildings also feature round concrete columns and upturned beams/caps hidden under a raised access floor system to create a fully flat underside of deck. The project includes offsite improvements, as well as 8.85 acres of site work; it also consists of a new 5-level and a new 6-level parking structure totaling 320,000 SF, featuring precast skin, glass elevator enclosures, and PV panels at the roof. Services Provided: Architect of Record: Client: News: Design, Construction STUDIOS Architecture; Devcon Construction, Inc. TMG Partners None Completed 2014 Corporate LEED Platinum BACK TO PROJECTS

  • Prologis Sage Point 8

    Mass grading and site improvements on 12.5 acres with construction of a 259,740 SF, 32’ clear height, shell concrete tilt-up building, with a fire pump house including two diesel fired generators. Project includes tenant improvements for Continental Tire, for tire storage to 30’ throughout a fully racked and lighted warehouse, 4,000 SF of office improvements, (26) dock positions with electrically operated dock equipment, either forklift battery charging stations, and a fully fenced site with automatic gates and a guardhouse. Prologis Sage Point 8 Reno, NV Mass grading and site improvements on 12.5 acres with construction of a 259,740 SF, 32’ clear height, shell concrete tilt-up building, with a fire pump house including two diesel fired generators. Project includes tenant improvements for Continental Tire, for tire storage to 30’ throughout a fully racked and lighted warehouse, 4,000 SF of office improvements, (26) dock positions with electrically operated dock equipment, either forklift battery charging stations, and a fully fenced site with automatic gates and a guardhouse. Services Provided: Architect of Record: Client: News: Construction Tectonics Design Group Prologis None Completed 2021 Tenant Imrovement Sustainable BACK TO PROJECTS

  • Devcon Construction, Inc.

    Devcon Construction, Inc. is a contractor and design-build firm based in the Bay Area. This veteran-owned company has been ranked as the largest general contractor in the Silicon Valley for the majority of the past two decades. E N T E R "There's a reason 95% of our business comes from repeat customers. People trust us." -Gary Filizetti, President

  • Santa Cruz Port District

    Structural upgrade, skin modification and tenant improvements for 10,000 SF two story retail office building located on the sand in Santa Cruz. Santa Cruz Port District Santa Cruz, CA Structural upgrade, skin modification and tenant improvements for 10,000 SF two story retail office building located on the sand in Santa Cruz. Services Provided: Architect of Record: Client: News: Construction Devcon Construction, Inc. Santa Cruz Port District None Completed Retail BACK TO PROJECTS

  • Franklin Fund Capital Data Center

    Phase 1-Two 2-story office buildings on 10.5 acres. Complete auditorium with raised floor and rear projection room, deli, and fitness center. Equipped with remote generator for both buildings in case of power failure. Built around a central plaza with fountain, sod and amphitheater. Phase 2-Design/build 180,000 SF 2-story concrete tilt-up building with a highbay warehouse and data center. Phase 3-Design/build of one 74,000 SF two-story concrete tilt-up building and one 95,000 SF three-story steel frame building. Franklin Fund Capital Data Center Rancho Cordova, CA Phase 1-Two 2-story office buildings on 10.5 acres. Complete auditorium with raised floor and rear projection room, deli, and fitness center. Equipped with remote generator for both buildings in case of power failure. Built around a central plaza with fountain, sod and amphitheater. Phase 2-Design/build 180,000 SF 2-story concrete tilt-up building with a highbay warehouse and data center. Phase 3-Design/build of one 74,000 SF two-story concrete tilt-up building and one 95,000 SF three-story steel frame building. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Franklin Templeton Investments None Completed 2010 Corporate Design-Build BACK TO PROJECTS

  • Platform 16

    Design/build project consisting of demolition to multiple existing structures and the construction of three new 6-story, steel framed high rises over a 3-level below grade parking structure. Project features core and warm shell offices, along with retail space total approximately 1,200,000 SF. The site features two large plazas between the buildings consisting of 16 terraces including an open air bridge connecting the third levels of two of the buildings. Platform 16 San Jose, CA Design/build project consisting of demolition to multiple existing structures and the construction of three new 6-story, steel framed high rises over a 3-level below grade parking structure. Project features core and warm shell offices, along with retail space total approximately 1,200,000 SF. The site features two large plazas between the buildings consisting of 16 terraces including an open air bridge connecting the third levels of two of the buildings. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction Inc. and KPF Architects Boston Properties & TMG None https://newatlas.com/architecture/platform-16-kpf-office/ In Progress Corporate Retail BACK TO PROJECTS

  • SCU Dowd Art & Art History Building

    This project includes 45,000 SF new construction of a 3-story building that integrates more than 45,000 SF of centralized, state-of-the-art studio, classroom, gallery, and other space for faculty, students, and visiting artists and scholars. Situated next to the Jesuit Community Residence and close to Mission Santa Clara de Asís, the new building reshapes the northern entrance of the University. The first floor of the building is primarily dedicated to gallery space and classrooms for instruction in three-dimensional art, such as sculpture. Upon entering, the most striking feature is a large blown-glass sculpture by famed artist Dale Chihuly on display in the main lobby. The second floor of the Edward M. Dowd Art and Art History building primarily house office and studio space for faculty. The third floor is used for instruction of two-dimensional art. This floor also has computer facilities for students enrolled in popular digital arts classes. Underneath the building’s dome is the pantheon lobby which further opens up to the pantheon terrace, offering views of campus. This new dedicated, centralized home for the department provides greatly expanded flexibility, capacity, and resources for the department, which serves more than 1,000 students a year. SCU Dowd Art & Art History Building Santa Clara, CA This project includes 45,000 SF new construction of a 3-story building that integrates more than 45,000 SF of centralized, state-of-the-art studio, classroom, gallery, and other space for faculty, students, and visiting artists and scholars. Situated next to the Jesuit Community Residence and close to Mission Santa Clara de Asís, the new building reshapes the northern entrance of the University. The first floor of the building is primarily dedicated to gallery space and classrooms for instruction in three-dimensional art, such as sculpture. Upon entering, the most striking feature is a large blown-glass sculpture by famed artist Dale Chihuly on display in the main lobby. The second floor of the Edward M. Dowd Art and Art History building primarily house office and studio space for faculty. The third floor is used for instruction of two-dimensional art. This floor also has computer facilities for students enrolled in popular digital arts classes. Underneath the building’s dome is the pantheon lobby which further opens up to the pantheon terrace, offering views of campus. This new dedicated, centralized home for the department provides greatly expanded flexibility, capacity, and resources for the department, which serves more than 1,000 students a year. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2016 Education Design-Build BACK TO PROJECTS

  • Mountain View Campus Cafe

    This project includes an 8,500 SF Café with authentic Japanese design elements, such as private dining rooms with recessed floors and shoji screen doors, tatami mat seating areas, and fabric wall panels. Other high-end finishes include stone tile floors, hand-painted wall tiles, wood slat ceilings, custom banquettes, and numerous other custom wood elements. Exterior improvements feature an updated patio area with built-in wood benches, a new fountain, cedar perimeter fence, and new Japanese gate structures. The Café was built inside an occupied building and completed successfully on an extremely tight seven week schedule, requiring double- and triple-shifts for the full duration. Mountain View Campus Cafe Mountain View, CA This project includes an 8,500 SF Café with authentic Japanese design elements, such as private dining rooms with recessed floors and shoji screen doors, tatami mat seating areas, and fabric wall panels. Other high-end finishes include stone tile floors, hand-painted wall tiles, wood slat ceilings, custom banquettes, and numerous other custom wood elements. Exterior improvements feature an updated patio area with built-in wood benches, a new fountain, cedar perimeter fence, and new Japanese gate structures. The Café was built inside an occupied building and completed successfully on an extremely tight seven week schedule, requiring double- and triple-shifts for the full duration. Services Provided: Architect of Record: Client: News: Construction BOORA Architects Confidential None Completed 2011 Corporate Tenant Improvement BACK TO PROJECTS

  • Plantronics - 345 Engineering

    This 27,000 SF office remodel consists of new interior finishes including butt-glaze window wall systems with sliding glass doors, cork and sisal flooring, wood slat wall panels, new recycled content ceiling tile, and aluminum screens walls with Green Monster Board Panels. The project also features an “Arktura” undulating metal fin ceiling; this is the first ceiling of this type on the West Coast. All work was performed while the building remained partially occupied. Plantronics - 345 Engineering Santa Cruz, CA This 27,000 SF office remodel consists of new interior finishes including butt-glaze window wall systems with sliding glass doors, cork and sisal flooring, wood slat wall panels, new recycled content ceiling tile, and aluminum screens walls with Green Monster Board Panels. The project also features an “Arktura” undulating metal fin ceiling; this is the first ceiling of this type on the West Coast. All work was performed while the building remained partially occupied. Services Provided: Architect of Record: Client: News: Construction Gensler Plantronics None Completed 2011 Corporate Tenant Improvement BACK TO PROJECTS

  • Skyport Plaza Garage

    Project consisting of two 4-story concrete parking structures with parking for 1,840 vehicles. The garage service a commercial campus of three concrete office buildings and two steel retail structures. Skyport Plaza Garage San Jose, CA Project consisting of two 4-story concrete parking structures with parking for 1,840 vehicles. The garage service a commercial campus of three concrete office buildings and two steel retail structures. Services Provided: Architect of Record: Client: News: Construction Kenneth Rodrigues & Partners, Inc Equity Office Properties None Completed 2001 Parking Structure BACK TO PROJECTS

  • Commonwealth Corporate Center

    Project consists of two 130,000 SF core & shell, 4-story structural steel buildings. The exterior skin of the building is primarily a unitized curtain wall system with composite metal panel cladding of exterior fin features. The project also includes 610,000 SF of onsite improvements including landscape, outdoor dining areas and sports court. Commonwealth Corporate Center Menlo Park, CA Project consists of two 130,000 SF core & shell, 4-story structural steel buildings. The exterior skin of the building is primarily a unitized curtain wall system with composite metal panel cladding of exterior fin features. The project also includes 610,000 SF of onsite improvements including landscape, outdoor dining areas and sports court. Services Provided: Architect of Record: Client: News: Construction ArcTec Inc. The Sobrato Organization None Completed 2016 Corporate BACK TO PROJECTS

  • 1450 Page Mill

    This 78,000 SF research and development building consists of a 2-story building and a 1-story below grade parking garage of approximately 42,000 SF. The building consists of structural steel, metal decking, a combination of terra cotta, glass/glazing, and zinc metal wall panels. The project also features three walkable balcony areas at level two. 1450 Page Mill Palo Alto, CA This 78,000 SF research and development building consists of a 2-story building and a 1-story below grade parking garage of approximately 42,000 SF. The building consists of structural steel, metal decking, a combination of terra cotta, glass/glazing, and zinc metal wall panels. The project also features three walkable balcony areas at level two. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture Stanford Real Estate None Completed 2017 Corporate Stanford Research Park LEED Gold BACK TO PROJECTS

bottom of page