- SCU Leavey Center
65,000 SF renovation of intercollegiate basketball/volleyball center including new curtain wall, new roof, new HVAC lighting, wood floor, bleachers and state of the art scoreboard system. SCU Leavey Center Santa Clara, CA 65,000 SF renovation of intercollegiate basketball/volleyball center including new curtain wall, new roof, new HVAC lighting, wood floor, bleachers and state of the art scoreboard system. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 1997 Education BACK TO PROJECTS
- Prologis Sage Point 8
Mass grading and site improvements on 12.5 acres with construction of a 259,740 SF, 32’ clear height, shell concrete tilt-up building, with a fire pump house including two diesel fired generators. Project includes tenant improvements for Continental Tire, for tire storage to 30’ throughout a fully racked and lighted warehouse, 4,000 SF of office improvements, (26) dock positions with electrically operated dock equipment, either forklift battery charging stations, and a fully fenced site with automatic gates and a guardhouse. Prologis Sage Point 8 Reno, NV Mass grading and site improvements on 12.5 acres with construction of a 259,740 SF, 32’ clear height, shell concrete tilt-up building, with a fire pump house including two diesel fired generators. Project includes tenant improvements for Continental Tire, for tire storage to 30’ throughout a fully racked and lighted warehouse, 4,000 SF of office improvements, (26) dock positions with electrically operated dock equipment, either forklift battery charging stations, and a fully fenced site with automatic gates and a guardhouse. Services Provided: Architect of Record: Client: News: Construction Tectonics Design Group Prologis None Completed 2021 Tenant Imrovement Sustainable BACK TO PROJECTS
- Elco Yards
Demolition of four city blocks to construct four new buildings with below grade parking and a restaurant plaza. The project development includes 715,000 SF of life science space consisting of one 4-story CIP concrete building over 2-level below grade parking and two 4-story CIP concrete buildings over a common 2-level garage. One 4-story steel building over 3-level below grade parking provides 260,000 SF of commercial space with a childcare facility. The site includes a 5,000 SF wood/steel framed restaurant and plaza. The building facades are composed of brick on precast panels, glass, and metal panels and include pavilion and terrace architectural features. The project site scope includes six blocks of public infrastructure improvements, two pedestrian bridges, and site amenities. Elco Yards Redwood City, CA Demolition of four city blocks to construct four new buildings with below grade parking and a restaurant plaza. The project development includes 715,000 SF of life science space consisting of one 4-story CIP concrete building over 2-level below grade parking and two 4-story CIP concrete buildings over a common 2-level garage. One 4-story steel building over 3-level below grade parking provides 260,000 SF of commercial space with a childcare facility. The site includes a 5,000 SF wood/steel framed restaurant and plaza. The building facades are composed of brick on precast panels, glass, and metal panels and include pavilion and terrace architectural features. The project site scope includes six blocks of public infrastructure improvements, two pedestrian bridges, and site amenities. Services Provided: Architect of Record: Client: News: Construction WRNS Studio IQHQ Elco Yards None In Progress Retail Life Science LEED Silver BACK TO PROJECTS
- Harker Event Center
This project construction consists of a 33,000 SF one-story basement gymnasium, as well as a 50,000 SF two-story state-of-the-art basement theater. The gym portion of the project includes training, dance, team locker rooms and therapy rooms with cold/hot plunge pools and an underwater treadmill. The 60’ high theater building includes large 33’x16’ LED lobby video wall and amenities include a 400 seat full production theater, vocal training rooms, orchestra rooms and a scene shop. The project also features a rooftop with full array of solar panels. Harker Event Center San Jose, CA This project construction consists of a 33,000 SF one-story basement gymnasium, as well as a 50,000 SF two-story state-of-the-art basement theater. The gym portion of the project includes training, dance, team locker rooms and therapy rooms with cold/hot plunge pools and an underwater treadmill. The 60’ high theater building includes large 33’x16’ LED lobby video wall and amenities include a 400 seat full production theater, vocal training rooms, orchestra rooms and a scene shop. The project also features a rooftop with full array of solar panels. Services Provided: Architect of Record: Client: News: Construction Studio Bondy Architects The Harker School None Completed 2018 Education Gym & Theater BACK TO PROJECTS
- Broadcom Headquarters
This 575,000 SF project consists of demolition and tenant improvement to two existing 6-story office buildings and two existing 3-story office buildings. Project includes open office space, technical lab space, café, fitness center, and conference centers. MEP systems and equipment were completely replaced for the two 6-story buildings, and existing rooftop mechanical units were reused at the two 3-story buildings. The exterior skin facades of two buildings were renovated and the project also features a new four-level, 810 stall parking garage and significant site work for Broadcom’s new campus in North San Jose. Broadcom Headquarters San Jose, CA This 575,000 SF project consists of demolition and tenant improvement to two existing 6-story office buildings and two existing 3-story office buildings. Project includes open office space, technical lab space, café, fitness center, and conference centers. MEP systems and equipment were completely replaced for the two 6-story buildings, and existing rooftop mechanical units were reused at the two 3-story buildings. The exterior skin facades of two buildings were renovated and the project also features a new four-level, 810 stall parking garage and significant site work for Broadcom’s new campus in North San Jose. Services Provided: Architect of Record: Client: News: Construction HOK Architects CMK LLC, Broadcom Limited None Completed 2018 Corporate Tenant Improvement BACK TO PROJECTS
- Donner Lofts
This 108,608 SF project features a six-story Type III over podium wood frame multi-family rental development consisting of 102 housing units, a parking garage, commercial and community space, onsite office space for staff, and common areas including a laundry room and courtyard. Donner Lofts San Jose, CA This 108,608 SF project features a six-story Type III over podium wood frame multi-family rental development consisting of 102 housing units, a parking garage, commercial and community space, onsite office space for staff, and common areas including a laundry room and courtyard. Services Provided: Architect of Record: Client: News: Construction HKIT Architects MidPen Housing Corporation None Completed 2016 Residential BACK TO PROJECTS
- Broadcom Garage
The project consists of 249,000 SF four-level concrete parking structure providing 812 vehicle spaces. The structure is constructed of pre-cast concrete columns and beams with cast in place post-tensioned floor decks and poured-in-place perimeter moment beam lateral elements supported on a pier foundation. Structure includes two stair wells and a masonry elevator tower. The exterior consists of an array of vertical perforated aluminum plate and stainless steel mesh panels. Broadcom Garage San Jose, CA The project consists of 249,000 SF four-level concrete parking structure providing 812 vehicle spaces. The structure is constructed of pre-cast concrete columns and beams with cast in place post-tensioned floor decks and poured-in-place perimeter moment beam lateral elements supported on a pier foundation. Structure includes two stair wells and a masonry elevator tower. The exterior consists of an array of vertical perforated aluminum plate and stainless steel mesh panels. Services Provided: Architect of Record: Client: News: Construction HNA/Pacific CMK LLC C/O Broadcom Limited None Completed 2018 Parking Structure BACK TO PROJECTS
- Stanford Northwest Data Center
This project included a design/build purpose built single story 9,200 SF CMU structure to house critical data processing (data center) and communications equipment (communications hub) and an emergency call center. The data center houses 96 server racks and associated network racks for critical systems. The communications hub houses 32 network racks and additional fiber distribution frames, and is part of a campus wide network of redundant hubs which are designed to remain functional after a major earthquake or similar event. The call center is a back-up facility to be used in the event the main call center is rendered inoperable. Stanford Northwest Data Center Stanford, CA This project included a design/build purpose built single story 9,200 SF CMU structure to house critical data processing (data center) and communications equipment (communications hub) and an emergency call center. The data center houses 96 server racks and associated network racks for critical systems. The communications hub houses 32 network racks and additional fiber distribution frames, and is part of a campus wide network of redundant hubs which are designed to remain functional after a major earthquake or similar event. The call center is a back-up facility to be used in the event the main call center is rendered inoperable. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Stanford University None Completed 2014 Data Center Design-Build BACK TO PROJECTS
- The Fairmont Hotel
This project consists of a thirteen floor, 264 room concrete structure with GFRC and stone exterior. The 254,000 SF project is comprised of a two-story retail and conference center topped by an eleven-story guest tower that connects to the existing hotel via a pedestrian bridge at the 2nd floor and subterranean service tunnel. The Fairmont Hotel San Jose, CA This project consists of a thirteen floor, 264 room concrete structure with GFRC and stone exterior. The 254,000 SF project is comprised of a two-story retail and conference center topped by an eleven-story guest tower that connects to the existing hotel via a pedestrian bridge at the 2nd floor and subterranean service tunnel. Services Provided: Architect of Record: Client: News: Construction Gensler Santa Monica Wolff Urban Development None Completed 2002 Hotel BACK TO PROJECTS
- State Compensation Insurance Fund
This project consists of three new 2-story buildings totaling 259,890 SF on a 32-acre site in the Vacaville, between Interstate 80 and Highway 505 at the intersection of Horse Creek Drive and Grassland Drive in the Vacaville Valley Business Park. The project site was master planned for a total build out of 430,000 SF (five each, 86,000 SF buildings) and required about 400 surface parking spaces per building. One of the buildings contains State Fund’s primary data center. The photovoltaic system generates up to 225kwH annually. State Compensation Insurance Fund Vacaville, CA This project consists of three new 2-story buildings totaling 259,890 SF on a 32-acre site in the Vacaville, between Interstate 80 and Highway 505 at the intersection of Horse Creek Drive and Grassland Drive in the Vacaville Valley Business Park. The project site was master planned for a total build out of 430,000 SF (five each, 86,000 SF buildings) and required about 400 surface parking spaces per building. One of the buildings contains State Fund’s primary data center. The photovoltaic system generates up to 225kwH annually. Services Provided: Architect of Record: Client: News: Construction HOK State Compensation Insurance Fund None Completed 2008 Data Center LEED Silver BACK TO PROJECTS
- Thermo-Fisher
This design/build tenant improvement project consists of a 90,000 SF interior conversion of an existing 185,000 SF concrete tilt-up into a plastics manufacturing facility. Project included an overhead rack distribution system, new customized electrical, mechanical, process piping, and condensed dry air systems to support the thermoplastic injection equipment, and storage housed in 65,000 SF of the one-story space. Special facilities include a tool room, a grinding room, and an outside chiller plant, and two large silos to feed raw materials to the machines. Since the tanks were erected on special concrete pads on the gradient of the loading dock incline, a new and catwalk with safety rail was built to accommodate the change in elevation. The remaining 25,000 SF of office space includes a large break room with an exterior patio, a small break room, large conference areas and perimeter offices. One conference room includes a sliding partition and built-in video projection and audio equipment. Thermo-Fisher Petaluma, CA This design/build tenant improvement project consists of a 90,000 SF interior conversion of an existing 185,000 SF concrete tilt-up into a plastics manufacturing facility. Project included an overhead rack distribution system, new customized electrical, mechanical, process piping, and condensed dry air systems to support the thermoplastic injection equipment, and storage housed in 65,000 SF of the one-story space. Special facilities include a tool room, a grinding room, and an outside chiller plant, and two large silos to feed raw materials to the machines. Since the tanks were erected on special concrete pads on the gradient of the loading dock incline, a new and catwalk with safety rail was built to accommodate the change in elevation. The remaining 25,000 SF of office space includes a large break room with an exterior patio, a small break room, large conference areas and perimeter offices. One conference room includes a sliding partition and built-in video projection and audio equipment. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Thermo-Fisher None Completed 2010 Industrial Center Tenant Improvement Design-Build BACK TO PROJECTS
- UOP Vereschagin Alumni House
Devcon provided pre-construction and construction services for design and construction of a new, two-story, wood framed facility of approximately 9,600 SF. Project consists of meeting rooms, office areas, resource library, and reception area with high-end finishes; catering kitchen, and circulation & storage areas. Site improvements include primary pedestrian access from adjacent parking area including donor "Brick" plaza and new terrace area. UOP Vereschagin Alumni House Stockton, CA Devcon provided pre-construction and construction services for design and construction of a new, two-story, wood framed facility of approximately 9,600 SF. Project consists of meeting rooms, office areas, resource library, and reception area with high-end finishes; catering kitchen, and circulation & storage areas. Site improvements include primary pedestrian access from adjacent parking area including donor "Brick" plaza and new terrace area. Services Provided: Architect of Record: Client: News: Construction LDA Partners University of the Pacific None Completed 2011 Residential Education LEED Gold BACK TO PROJECTS