  • SCU Finn Hall

    This design/build project consists of approximately 120,000 SF four-story wood framed dormitory over concrete podium and 42,000 SF single-level of below grade parking garage. Project includes 184 student units, six staff apartments, offices, common lounges/break rooms, 2-story lounges and study rooms, and multi-purpose room that is almost two stories tall and features an operable partition wall, audio-visual system, and a service kitchen to host large events. The project also consists of a new air-cooled chiller plant, boiler plant, and 4-pipe fan coil units to provide heating and cooling to all student units and apartments. SCU Finn Hall Santa Clara, CA This design/build project consists of approximately 120,000 SF four-story wood framed dormitory over concrete podium and 42,000 SF single-level of below grade parking garage. Project includes 184 student units, six staff apartments, offices, common lounges/break rooms, 2-story lounges and study rooms, and multi-purpose room that is almost two stories tall and features an operable partition wall, audio-visual system, and a service kitchen to host large events. The project also consists of a new air-cooled chiller plant, boiler plant, and 4-pipe fan coil units to provide heating and cooling to all student units and apartments. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2019 Education Design-Build BACK TO PROJECTS

  • Franklin Fund Capital Data Center

    Phase 1-Two 2-story office buildings on 10.5 acres. Complete auditorium with raised floor and rear projection room, deli, and fitness center. Equipped with remote generator for both buildings in case of power failure. Built around a central plaza with fountain, sod and amphitheater. Phase 2-Design/build 180,000 SF 2-story concrete tilt-up building with a highbay warehouse and data center. Phase 3-Design/build of one 74,000 SF two-story concrete tilt-up building and one 95,000 SF three-story steel frame building. Franklin Fund Capital Data Center Rancho Cordova, CA Phase 1-Two 2-story office buildings on 10.5 acres. Complete auditorium with raised floor and rear projection room, deli, and fitness center. Equipped with remote generator for both buildings in case of power failure. Built around a central plaza with fountain, sod and amphitheater. Phase 2-Design/build 180,000 SF 2-story concrete tilt-up building with a highbay warehouse and data center. Phase 3-Design/build of one 74,000 SF two-story concrete tilt-up building and one 95,000 SF three-story steel frame building. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Franklin Templeton Investments None Completed 2010 Corporate Design-Build BACK TO PROJECTS

  • Silicon Graphics, Inc. B900

    100,000 SF tenant improvement within two 2-story shells. Project consists of open office, conference rooms, break rooms an all-hands training area, and first floor data center with perimeter support labs. Project also includes exterior skin and site modifications to add truck level and grade level loading dock for new shipping & receiving, as well as retrofit of existing trash enclosure into new mechanical service yard to serve data center. Silicon Graphics, Inc. B900 Milpitas, CA 100,000 SF tenant improvement within two 2-story shells. Project consists of open office, conference rooms, break rooms an all-hands training area, and first floor data center with perimeter support labs. Project also includes exterior skin and site modifications to add truck level and grade level loading dock for new shipping & receiving, as well as retrofit of existing trash enclosure into new mechanical service yard to serve data center. Services Provided: Architect of Record: Client: News: Construction ArcTec Aruba Hewlett Packard Enterprise Company None Completed 2018 Tenant Improvement Data Center Corporate BACK TO PROJECTS

  • 601 Marshall

    This 250,000 SF project consists of an 8-story above grade building and a 2-story below grade parking garage to accommodate 255 vehicles. Project features 120,000 SF of office space with ground floor commercial/retail space. 601 Marshall Redwood City, CA This 250,000 SF project consists of an 8-story above grade building and a 2-story below grade parking garage to accommodate 255 vehicles. Project features 120,000 SF of office space with ground floor commercial/retail space. Services Provided: Architect of Record: Client: News: Construction KSHA Dostart Development Company None Completed 2018 Corporate Retail LEED Platinum BACK TO PROJECTS

  • McCarthy Boulevard Extension

    This project includes the new construction of 1.5 miles of median divided four lane City Street, underground utilities, concrete curbs and sidewalks, site lighting and joint utility trench. McCarthy Boulevard Extension Milpitas, CA This project includes the new construction of 1.5 miles of median divided four lane City Street, underground utilities, concrete curbs and sidewalks, site lighting and joint utility trench. Services Provided: Architect of Record: Client: News: Construction Devcon Construction Inc. Mark Thomas and Co. Inc. None Completed 1994 Infrastructure BACK TO PROJECTS

  • University Plaza

    This project consists of a 4-story 206,000 SF concrete Class A office building over concrete podium with 1-story below grade parking. The project also features a 6-level 193,000 SF parking garage of which 1,500 SF is dedicated retail space with a 2-story bridge that connects the office building to the parking garage. The office building includes precast brick and glass curtain wall exterior cladding along with a 4-story atrium at the building interior, with three large skylights above. The parking garage skin features a painted aluminum curtain wall system and painted concrete. University Plaza East Palo Alto, CA This project consists of a 4-story 206,000 SF concrete Class A office building over concrete podium with 1-story below grade parking. The project also features a 6-level 193,000 SF parking garage of which 1,500 SF is dedicated retail space with a 2-story bridge that connects the office building to the parking garage. The office building includes precast brick and glass curtain wall exterior cladding along with a 4-story atrium at the building interior, with three large skylights above. The parking garage skin features a painted aluminum curtain wall system and painted concrete. Services Provided: Architect of Record: Client: News: Construction Korth Sunseri Hagey Architects The Sobrato Organization None Completed 2016 Corporate LEED Gold BACK TO PROJECTS

  • Berkeley Commons

    This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Berkeley Commons Berkeley, CA This 799,578 SF project consists of two 3-story steel buildings with an attached 5-story parking garage, located on the Aquatic Park in Berkeley; the core/shell buildings are prepped for lab/life science tenants. The building roofs are comprised of over 40,000 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell. The façade consists of curtain wall with bird safe glass, terra cotta panels and fins, and metal paneling. Site improvements feature a communal elevated deck area between the buildings, as well as a new bike path and roadway along Bolivar Drive. The project will receive a LEED Gold rating. Services Provided: Architect of Record: Client: News: Construction Gensler Lane Partners None Completed 2024 Commercial LEED Gold BACK TO PROJECTS

  • Quad Campus 3-7

    This 332,000 SF project includes a complete interior demolition, new office space, complete MEP systems upgrade, a wellness center, a fitness center, and three new cafeterias within five buildings. Project features photovoltaic panels, a solar hot water system, new roof skylights, and an Ice Bear unit to improve energy performance. Exterior sitework includes a volleyball court, bocce court, dog park, expansive lawn, water features, wood sidewalk, and amphitheater style seating. This project will receive a LEED Gold Campus rating and a separate LEED Platinum CI rating for the amenity building. Quad Campus 3-7 Mountain View, CA This 332,000 SF project includes a complete interior demolition, new office space, complete MEP systems upgrade, a wellness center, a fitness center, and three new cafeterias within five buildings. Project features photovoltaic panels, a solar hot water system, new roof skylights, and an Ice Bear unit to improve energy performance. Exterior sitework includes a volleyball court, bocce court, dog park, expansive lawn, water features, wood sidewalk, and amphitheater style seating. This project will receive a LEED Gold Campus rating and a separate LEED Platinum CI rating for the amenity building. Services Provided: Architect of Record: Client: News: Construction Gensler Confidential None Completed 2012 Corporate Tenant Improvement LEED Gold BACK TO PROJECTS

  • SCU Sobrato Campus for Discovery and Innovation

    This 270,000 SF project consists of a four-story limestone and glass clad steel frame structure built to house Santa Clara University’s Science, Technology, Engineering and Mathemat¬ics (STEM) education and research facilities. The STEM complex combines academic, research, adminis¬trative, social and innovation activity spaces in support of the university’s academic degree programs within the STEM and related fields. The new complex is occupied by faculty, students and staff within the STEM areas of study and by those outside the STEM fields. It also houses space and programs for partnerships with regional private industry and global social and environmental initiatives. SCU Sobrato Campus for Discovery and Innovation Santa Clara, CA This 270,000 SF project consists of a four-story limestone and glass clad steel frame structure built to house Santa Clara University’s Science, Technology, Engineering and Mathemat¬ics (STEM) education and research facilities. The STEM complex combines academic, research, adminis¬trative, social and innovation activity spaces in support of the university’s academic degree programs within the STEM and related fields. The new complex is occupied by faculty, students and staff within the STEM areas of study and by those outside the STEM fields. It also houses space and programs for partnerships with regional private industry and global social and environmental initiatives. Services Provided: Architect of Record: Client: News: Construction ZGF Architects Santa Clara University None https://www.bizjournals.com/sanjose/news/2020/11/06/sobrato-campus-at-scu-under-construction.html Completed 2021 Education Santa Clara University STEM BACK TO PROJECTS

  • Cisco Creativity Zones

    This design/build project consists of community rooms with video games, arcade games and touch screens. The 1st floor creativity zone features a video game theme while the 2nd floor has a comic book theme. Rooms are located in the building where the Cisco employees can take a break from their daily activities but also keep their minds engaged. Cisco Creativity Zones San Jose, CA This design/build project consists of community rooms with video games, arcade games and touch screens. The 1st floor creativity zone features a video game theme while the 2nd floor has a comic book theme. Rooms are located in the building where the Cisco employees can take a break from their daily activities but also keep their minds engaged. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Cisco Systems, Inc. None Completed 2014 Corporate Tenant Improvement Design-Build BACK TO PROJECTS

  • Tech CU Arena

    Design/Build construction of a 2-rink addition to the existing Solar4America Ice complex. The 20,000 SF addition includes a 4,200 seat AHL stadium rink with adjoining practice rink & commissary building complete with locker rooms, commissary kitchen & concessions, large scale restroom facilities, and a professional locker room. The new stadium rink includes a suite level with (12) private suites, (8) loge suites and a theater box suite for larger groups, while the new practice rink building consists of (12) new public locker rooms and a 2nd floor bar overlooking the ice rink. The new 3-story commissary building features an AHL locker room and team office spaces, commissary kitchen, and ice chiller plant room which supports both new rinks as well as a renovated third existing rink. 20,000 SF of space is designated to future tenants which occupies a portion of the 2nd floor and all of the 3rd floor in the commissary building. Hybrid, pre-engineered metal buildings are utilized for the structures of the new buildings with a standing seam panel roof system and insulated metal panel exteriors. The HVAC system includes dehumidification for the ice rinks and a fully integrated controls system. Project also consists of new infrastructure, site work and storm water treatment. The project will receive a LEED Silver rating. Tech CU Arena San Jose, CA Design/Build construction of a 2-rink addition to the existing Solar4America Ice complex. The 20,000 SF addition includes a 4,200 seat AHL stadium rink with adjoining practice rink & commissary building complete with locker rooms, commissary kitchen & concessions, large scale restroom facilities, and a professional locker room. The new stadium rink includes a suite level with (12) private suites, (8) loge suites and a theater box suite for larger groups, while the new practice rink building consists of (12) new public locker rooms and a 2nd floor bar overlooking the ice rink. The new 3-story commissary building features an AHL locker room and team office spaces, commissary kitchen, and ice chiller plant room which supports both new rinks as well as a renovated third existing rink. 20,000 SF of space is designated to future tenants which occupies a portion of the 2nd floor and all of the 3rd floor in the commissary building. Hybrid, pre-engineered metal buildings are utilized for the structures of the new buildings with a standing seam panel roof system and insulated metal panel exteriors. The HVAC system includes dehumidification for the ice rinks and a fully integrated controls system. Project also consists of new infrastructure, site work and storm water treatment. The project will receive a LEED Silver rating. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Sharks Ice, LLC None Completed 2022 Athletic Center Design-Build LEED Silver BACK TO PROJECTS

  • 700 Santana Row

    This 779,297 SF project consists of core and shell for a 291,872 SF, 8-story office building with 30,263 SF of shelled retail space, and an 8,500 SF rooftop terrace and garden on the sixth floor. The skin includes a combination of glass curtain wall, fins, glass storefront, GFRC with punched windows, precast and exposed concrete. The plaza consists of site accent lighting features, a redwood deck/stage, mature trees, on grade pavers, circular above and below ground concrete precast planters with bench seating and a fountain/water feature with an architectural prefabricated arbor. The project also features a 457,162 SF with 1-level of below grade parking structure contiguous with office building and 5-levels of above-grade parking. The garage, which houses 1,300 vehicles, is an architectural precast and concrete combination enclosed by an architectural expanded mesh system. 700 Santana Row San Jose, CA This 779,297 SF project consists of core and shell for a 291,872 SF, 8-story office building with 30,263 SF of shelled retail space, and an 8,500 SF rooftop terrace and garden on the sixth floor. The skin includes a combination of glass curtain wall, fins, glass storefront, GFRC with punched windows, precast and exposed concrete. The plaza consists of site accent lighting features, a redwood deck/stage, mature trees, on grade pavers, circular above and below ground concrete precast planters with bench seating and a fountain/water feature with an architectural prefabricated arbor. The project also features a 457,162 SF with 1-level of below grade parking structure contiguous with office building and 5-levels of above-grade parking. The garage, which houses 1,300 vehicles, is an architectural precast and concrete combination enclosed by an architectural expanded mesh system. Services Provided: Architect of Record: Client: News: Construction WRNS Studio Federal Realty Investment Trust None https://www.globest.com/2019/04/29/700-santana-row-takes-on-splunks-tis/ https://www.bizjournals.com/sanjose/news/2019/09/19/santana-row-boosts-new-class-a-office-space.html https://www.mercurynews.com/2020/02/11/santana-row-office-boom-splunk-san-jose-home-run-tech-develop-real-estate-retail-restaurant-hotel-housing/ Completed 2019 Corporate LEED Gold BACK TO PROJECTS