Search Results
Search this site
397 results found with an empty search
- Champion Station
This 192,000 SF design/build project on a 10.9 acre site consists of two 2-story buildings of an eight building campus. Exterior façade upgrades include new roof, window mullion and wall colors, new entry doors, free standing steel, as well as wood architectural accent elements. Site work consists of site accessibility, hard scape and landscaping upgrades including new amenities such as employee BBQ and sport courts. Tenant improvement modifications include finish upgrades, ADA upgrades, and new conference rooms. Champion Station San Jose, CA This 192,000 SF design/build project on a 10.9 acre site consists of two 2-story buildings of an eight building campus. Exterior façade upgrades include new roof, window mullion and wall colors, new entry doors, free standing steel, as well as wood architectural accent elements. Site work consists of site accessibility, hard scape and landscaping upgrades including new amenities such as employee BBQ and sport courts. Tenant improvement modifications include finish upgrades, ADA upgrades, and new conference rooms. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. TMG Partners None Completed 2014 Corporate Design-Build Tenant Improvement BACK TO PROJECTS
- The Nueva School - Bay Meadows Phase 3A
This project consists of a new 2-story, 7,500 SF classroom wing on existing podium. Project includes additional 7,300 SF of roof deck/green roof area, plus on-grade site work. The Nueva School - Bay Meadows Phase 3A San Mateo, CA This project consists of a new 2-story, 7,500 SF classroom wing on existing podium. Project includes additional 7,300 SF of roof deck/green roof area, plus on-grade site work. Services Provided: Architect of Record: Client: News: Construction LMS Architects The Nueva School None Completed 2019 Education BACK TO PROJECTS
- Globix Data Center
23,000 SF data center with raised computer flooring. Project will include the installation of a 12 KV primary gear and (2) 2000 KVA transformers, (2) 1250 KW generators and transfer switches, (12) 125 KVA PDU’s, 480 volt switchgear and distribution panels and (2) 750 KVA UPS systems with static switches including 15 minute batteries. In addition, the project will also include main and distribution feeders, raceways and outlets for data floor, as well as HVAC units and fire protection. Globix Data Center Santa Clara, CA 23,000 SF data center with raised computer flooring. Project will include the installation of a 12 KV primary gear and (2) 2000 KVA transformers, (2) 1250 KW generators and transfer switches, (12) 125 KVA PDU’s, 480 volt switchgear and distribution panels and (2) 750 KVA UPS systems with static switches including 15 minute batteries. In addition, the project will also include main and distribution feeders, raceways and outlets for data floor, as well as HVAC units and fire protection. Services Provided: Architect of Record: Client: News: Construction Dennis Kobza & Associates Globix None Completed 1999 Data Center Corporate BACK TO PROJECTS
- Vi Living
This project includes a 1,000,000 SF construction of a nine-building retirement community consisting of 388 customized independent living units which consisted of seven four story buildings with post tension decks; one wood-framed, two-story building with 62 assisted living units; and one wood-framed, one-story skill nursing facility with 44 units along with an 181,000 SF underground parking lot and back-of-house and state-of-the-art amenity spaces. Exteriors of stone and stucco coordinate with lush landscaping that features walking paths, seating areas and several beauty spots for socializing and quiet contemplation. This project also included a care center. The interior includes a fitness center, an array of dining venues including a café and kitchen and an indoor swimming pool. The four-story independent living buildings and the one and two story care center sit on a 22.3 acre site. This was an OSHPD project. Vi Living Palo Alto, CA This project includes a 1,000,000 SF construction of a nine-building retirement community consisting of 388 customized independent living units which consisted of seven four story buildings with post tension decks; one wood-framed, two-story building with 62 assisted living units; and one wood-framed, one-story skill nursing facility with 44 units along with an 181,000 SF underground parking lot and back-of-house and state-of-the-art amenity spaces. Exteriors of stone and stucco coordinate with lush landscaping that features walking paths, seating areas and several beauty spots for socializing and quiet contemplation. This project also included a care center. The interior includes a fitness center, an array of dining venues including a café and kitchen and an indoor swimming pool. The four-story independent living buildings and the one and two story care center sit on a 22.3 acre site. This was an OSHPD project. Services Provided: Architect of Record: Client: News: Construction The Steinberg Group Classic Residence by Hyatt None Completed 2005 Hotel / Resort Tenant Improvement Residential BACK TO PROJECTS
- SCU Softball Field
Project features a complete demolition of the field, landscaping, and fencing in order to reorient the field in a South to North manor, allowing for an expanded spectator area and future buildings. Project includes an impressive Division 1 Softball complex complete with landscape & irrigation, backstop with protection netting, fenced dugouts, and large flood lights for night games. Project featuring new concrete pathways throughout the softball complex. Landscaping is also included on the perimeter of the softball complex to beautify the area for students, pedestrians, and fans. Project featuring a set of stadium style bleachers complete with 200 spacious folding seats, cup holders, ADA accessible spaces, low voltage wiring for a future scoreboard in center field, a backup generator for emergency lighting, and red fines for the future bullpens. Project also includes landscaping, underground utilities, life safety, domestic water lines, sanitary sewer, storm drain, electrical conduit, fire water lines and planning for what Santa Clara University envisions for the Softball Complex in the coming years. New Softball stadium and facility for SCU Softball Team. Includes new batting cage, grandstands, concession stand and pressbox. SCU Softball Field Santa Clara, CA Project features a complete demolition of the field, landscaping, and fencing in order to reorient the field in a South to North manor, allowing for an expanded spectator area and future buildings. Project includes an impressive Division 1 Softball complex complete with landscape & irrigation, backstop with protection netting, fenced dugouts, and large flood lights for night games. Project featuring new concrete pathways throughout the softball complex. Landscaping is also included on the perimeter of the softball complex to beautify the area for students, pedestrians, and fans. Project featuring a set of stadium style bleachers complete with 200 spacious folding seats, cup holders, ADA accessible spaces, low voltage wiring for a future scoreboard in center field, a backup generator for emergency lighting, and red fines for the future bullpens. Project also includes landscaping, underground utilities, life safety, domestic water lines, sanitary sewer, storm drain, electrical conduit, fire water lines and planning for what Santa Clara University envisions for the Softball Complex in the coming years. New Softball stadium and facility for SCU Softball Team. Includes new batting cage, grandstands, concession stand and pressbox. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2016 Education Athletic Center Design-Build BACK TO PROJECTS
- Redwood City Jefferson Campus
This project consists of an 89,000 SF interior tenant improvement of a recently completed 4-story building in downtown Redwood City. First level consists of a reception lobby, catering kitchen, large community event space with conference rooms, break areas, and shipping & receiving area. Floors 2 through 4 include open office space, conference rooms, library, coffee bar, IT help desk, and executive conference rooms that are surrounded by wood feature walls, team areas with wood ceilings and custom baffles at the corridors. Floor 3 features a full-service kitchen, “All Hands” event space, recording studio and two high-end terrace buildouts with unit pavers and custom planters. Redwood City Jefferson Campus Redwood City, CA This project consists of an 89,000 SF interior tenant improvement of a recently completed 4-story building in downtown Redwood City. First level consists of a reception lobby, catering kitchen, large community event space with conference rooms, break areas, and shipping & receiving area. Floors 2 through 4 include open office space, conference rooms, library, coffee bar, IT help desk, and executive conference rooms that are surrounded by wood feature walls, team areas with wood ceilings and custom baffles at the corridors. Floor 3 features a full-service kitchen, “All Hands” event space, recording studio and two high-end terrace buildouts with unit pavers and custom planters. Services Provided: Architect of Record: Client: News: Construction Bohlin Cywinski Jackson Confidential None https://www.smdailyjournal.com/news/local/chan-zuckerberg-initiative-unveils-community-space/article_88b09d56-3e53-11ea-801b-b79be85029c0.html Completed 2019 Corporate Tenant Improvement BACK TO PROJECTS
- NetApp Buildings 2 & 3
This project includes the construction of two 3-story structural steel buildings with precast and glass curtain wall of approximately 280,000 SF, including associated site work, complete loading dock, full cafeteria, patio seating and fountain landscaping. 32,000 SF conversion of the first floor of an existing three story office building to a Computer Lab / Data Center housing 720 server cabinets with an average power load of 8kW/cabinet. Project included a new dedicated 12kV electrical service; overhead busbar power distribution; high efficiency transformers and rotary UPS systems; (4) new dual cell cooling towers on the building’s roof; (4) 590 ton chillers in a new dedicated chiller enclosure building; variable primary only CHW distribution; and (22) custom air handlers feeding pressurized “cold aisles” with 100% air side economizer implementation. Energy efficiency measures implemented resulted in an average PUE of 1.3. With this project, Network Appliance was recognized for its continued environmental stewardship to improve its energy efficiency, conserve resources, and reduce waste. The company was presented with a check for roughly $1.4 million by Pacific Gas and Electric Company under PG&E's Non-Residential New Construction Program, which encourages PG&E's commercial, industrial, high-technology, and agricultural customers to implement energy-efficient building and process design and construction; at the time, this rebate was the largest new construction incentive PG&E had ever awarded. NetApp Buildings 2 & 3 Sunnyvale, CA This project includes the construction of two 3-story structural steel buildings with precast and glass curtain wall of approximately 280,000 SF, including associated site work, complete loading dock, full cafeteria, patio seating and fountain landscaping. 32,000 SF conversion of the first floor of an existing three story office building to a Computer Lab / Data Center housing 720 server cabinets with an average power load of 8kW/cabinet. Project included a new dedicated 12kV electrical service; overhead busbar power distribution; high efficiency transformers and rotary UPS systems; (4) new dual cell cooling towers on the building’s roof; (4) 590 ton chillers in a new dedicated chiller enclosure building; variable primary only CHW distribution; and (22) custom air handlers feeding pressurized “cold aisles” with 100% air side economizer implementation. Energy efficiency measures implemented resulted in an average PUE of 1.3. With this project, Network Appliance was recognized for its continued environmental stewardship to improve its energy efficiency, conserve resources, and reduce waste. The company was presented with a check for roughly $1.4 million by Pacific Gas and Electric Company under PG&E's Non-Residential New Construction Program, which encourages PG&E's commercial, industrial, high-technology, and agricultural customers to implement energy-efficient building and process design and construction; at the time, this rebate was the largest new construction incentive PG&E had ever awarded. Services Provided: Architect of Record: Client: News: Construction NA Network Appliance None Completed 2000 Corporate BACK TO PROJECTS
- Stanford Federal Credit Union
This 1,200 SF design/ build tenant improvement established the Stanford Credit Union presence on the Stanford Redwood City Campus. The project consists of exterior precast modifications, high security protocols, ATM, and bank equipment integration and installation. Stanford Federal Credit Union Redwood City, CA This 1,200 SF design/ build tenant improvement established the Stanford Credit Union presence on the Stanford Redwood City Campus. The project consists of exterior precast modifications, high security protocols, ATM, and bank equipment integration and installation. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Stanford Federal Credit Union None Completed 2019 Banking / Finance Tenant Improvement Design-Build BACK TO PROJECTS
- Gary Filizetti | Devcon
Previous Gary Filizetti President “Our people differentiate us,” said Gary Filizetti, President of Devcon Construction, Inc. “We work as a team dedicated to exceptional customer service, and that’s why 95% of our work is repeat business. People trust us.” Filizetti oversees Devcon’s Construction and Architectural Design Departments, and actively supervises preconstruction, estimating and construction. His decades of construction experience and skill at building strong relationships help him make valuable contributions to each of the 100+ projects active at any given time. Initially serving as Vice President of Estimating and Construction when he joined Devcon as a partner in 1980, Filizetti led the transition of Devcon from a developer that did some contracting into a large design/build general contractor that does some developing. He became President in 1986, and has been directly involved in producing tens of millions of square feet of tenant improvements and building shells. A noted college football athlete, Filizetti earned his bachelor’s degree in Commerce at Santa Clara University in 1967 and his MBA in Commerce there in 1969. Although he had helped out in his father’s plastering business as a teenager, Filizetti began his adult career in construction as a client, working as a contract negotiator for Fairchild Semiconductor. Yet, construction called, and he later served as a Project Manager for a large general contractor for more than a decade prior to joining Devcon. Next
- 1965 Charleston
This project includes a 60,000 SF complete interior demolition and tenant improvement highlighted by custom "Family Room" and Library areas. The project includes a structural in-fill of the second floor to provide more office area and incorporate a new lobby stair featuring a design/build glass handrail. Exterior work includes an addition of new patio areas for employees' use. 1965 Charleston Mountain View, CA This project includes a 60,000 SF complete interior demolition and tenant improvement highlighted by custom "Family Room" and Library areas. The project includes a structural in-fill of the second floor to provide more office area and incorporate a new lobby stair featuring a design/build glass handrail. Exterior work includes an addition of new patio areas for employees' use. Services Provided: Architect of Record: Client: News: Construction BOORA Architects Confidential None Completed 2010 Corporate Tenant Improvement LEED Gold BACK TO PROJECTS
- Classic Residence by Hyatt - La Jolla
This project includes the construction of an independent living facility totaling 765,000 SF. Project features a new 400,000 SF 20-story reinforced concrete tower, a 3-level underground parking structure that is tied into the existing underground parking structure and a one story, 10,000 SF structural steel connector building. Project consists of 184 customized senior living units ranging from 1,500 SF to 3,000 SF and includes over 365,000 SF of sitework and renovation of public areas in the existing 20-story tower. The new tower and connector building also include multiple dining venues; a new indoor pool with locker rooms, exercise rooms and hair salon; conservatory; reading, computer and billiards rooms; and a grand living room. The site was renovated to incorporate a central circular driveway with walking paths, arbors and landscaped terraces. Classic Residence by Hyatt - La Jolla San Diego, CA This project includes the construction of an independent living facility totaling 765,000 SF. Project features a new 400,000 SF 20-story reinforced concrete tower, a 3-level underground parking structure that is tied into the existing underground parking structure and a one story, 10,000 SF structural steel connector building. Project consists of 184 customized senior living units ranging from 1,500 SF to 3,000 SF and includes over 365,000 SF of sitework and renovation of public areas in the existing 20-story tower. The new tower and connector building also include multiple dining venues; a new indoor pool with locker rooms, exercise rooms and hair salon; conservatory; reading, computer and billiards rooms; and a grand living room. The site was renovated to incorporate a central circular driveway with walking paths, arbors and landscaped terraces. Services Provided: Architect of Record: Client: News: Construction Confidential Confidential None Completed 2008 Hotel / Resort Residential BACK TO PROJECTS
- 506 Santa Cruz
This 47,992 SF project consists of a new mixed-use 4-story building over two levels of below grade parking. Project features lobby and retail on first level, office space at second and third level, and three residential apartment units at the fourth floor. Skin consists of storefront glazing & curtain wall systems, plaster, handset stone and metal panels. 506 Santa Cruz Menlo Park, CA This 47,992 SF project consists of a new mixed-use 4-story building over two levels of below grade parking. Project features lobby and retail on first level, office space at second and third level, and three residential apartment units at the fourth floor. Skin consists of storefront glazing & curtain wall systems, plaster, handset stone and metal panels. Services Provided: Architect of Record: Client: News: Construction The Hayes Group 500 SC Partners, LLC None Completed 2020 Corporate Retail BACK TO PROJECTS












