top of page
Devcon_Logo_wTaglines.png

Search Results

382 results found with an empty search

  • The Plaza Foster City

    The Plaza Foster City Foster City, CA This 555,000 SF design/build mixed-use high-density residential project serves as a major landmark and gateway to the Peninsula. The development features an urban classic contemporary design of 307 units and approximately 17,000 SF of retail space. The project consists of three main structures; two wood framed residential buildings (one four stories and one five stories) containing 300 rental apartments and seven live work units and a six tiered concrete long span parking structure housing 730 vehicles. All three buildings have concrete drilled piers foundations and the amenities include three courtyards with a pool and jacuzzi, exterior BBQ area and fireplace, resident media center, fitness center, community center and leasing center. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Northwestern Mutual Real Estate Investments, LLC None Completed 2013 Residential Design-Build LEED Gold BACK TO PROJECTS

  • Donner Lofts

    Donner Lofts San Jose, CA This 108,608 SF project features a six-story Type III over podium wood frame multi-family rental development consisting of 102 housing units, a parking garage, commercial and community space, onsite office space for staff, and common areas including a laundry room and courtyard. Services Provided: Architect of Record: Client: News: Construction HKIT Architects MidPen Housing Corporation None Completed 2016 Residential BACK TO PROJECTS

  • Archbishop Mitty Science and Student Life Building

    Archbishop Mitty Science and Student Life Building San Jose, CA This project features a 17,000 SF 2-story student life and science building consisting of physics and chemistry labs, 2nd floor outdoor terrace, and large student center on first floor. Services Provided: Architect of Record: Client: News: Construction Steinberg Architects Archbishop Mitty None Completed 2017 Education BACK TO PROJECTS

  • InterContinental Monterey Garage

    InterContinental Monterey Garage Monterey, CA 285,000 SF design/build hotel comprised of two 4-story buildings consisting of both concrete and wood frame construction with inter-tidal construction elements. Project includes 208 guestrooms and meeting space, retail space, a grand fireplace in the lobby, a signature restaurant and bar seating approximately 95 people, and a luxury spa and fitness center with an outdoor lap pool. The hotel also features 8,500 SF of an indoor meeting space, approximately 5,000 SF of outdoor event space overlooking the Monterey Bay and a stand alone 4-story concrete parking structure for 347 vehicles. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Pacific Hotel Management None Completed 2008 Parking Structure BACK TO PROJECTS

  • Bay Street Condos

    Bay Street Condos Emeryville, CA This project consists of a 112,000 SF construction of (95) condominiums, two-story units on top of existing two-story concrete structure. Project features courtyards with landscaping. Existing structure has first level operating retail and second level parking. Framing system is a steel tube panelized system. Services Provided: Architect of Record: Client: News: Construction SB Architects Bay Street Housing Partners LP, MacFarlane Partners None Completed 2006 Residential BACK TO PROJECTS

  • Globix Data Center

    Globix Data Center Santa Clara, CA 23,000 SF data center with raised computer flooring. Project will include the installation of a 12 KV primary gear and (2) 2000 KVA transformers, (2) 1250 KW generators and transfer switches, (12) 125 KVA PDU’s, 480 volt switchgear and distribution panels and (2) 750 KVA UPS systems with static switches including 15 minute batteries. In addition, the project will also include main and distribution feeders, raceways and outlets for data floor, as well as HVAC units and fire protection. Services Provided: Architect of Record: Client: News: Construction Dennis Kobza & Associates Globix None Completed 1999 Data Center Corporate BACK TO PROJECTS

  • Barnes and Noble Nook Campus

    Barnes and Noble Nook Campus Palo Alto, CA This project consists of a 200,000 SF multi-phased renovation of five buildings within a research and development campus; the space will serve as the headquarters for the Nook tablet division. Project includes new mechanical systems, extensive site modifications, cafeteria, ultra-tech interior design template, and a significant lobby upgrade. Services Provided: Architect of Record: Client: News: Construction Schwartz Architect Barnes and Noble None Completed 2014 Corporate Tenant Improvement BACK TO PROJECTS

  • El Camino Family Housing

    El Camino Family Housing South San Francisco, CA This 225,000 SF multifamily rental development consists of 109 housing units, with a parking garage and surface parking to house 211 cars. Project also features commercial and community space, onsite office space for staff, and common areas including a laundry room and central landscaped area with play structure. The development consists of (1) five-story wood frame building, (1) four-story wood framed building and (6) attached townhouses all sitting upon a two acre concrete podium. Project is Green Point Rated featuring rooftop photovoltaic solar, solar water heating, and community garden within walkable distance to BART. Services Provided: Architect of Record: Client: News: Construction BAR Architects MidPen Housing Corporation None Completed 2012 Residential Green Point Rated BACK TO PROJECTS

  • Adobe North

    Adobe North San Jose, CA 1,300,000 SF project consisting of an 18-story CIP concrete tower featuring a 12-story office building, 2-story below grade parking, 6-levels above grade parking, sitework and tenant improvements. The project consists of a pedestrian bridge approximately 6,000 SF over West San Fernando, connecting the new structure to the existing campus. The garage and office façade are comprised of metal panel, curtain wall and structural glazing. The interior features a multi-story all hands assembly space, customer experience center, full electric café, and flexible workspace on the work floors. The all hands area seats 300 people with custom AV wall, theatrical lighting and features 2-story vertical decorative fins for acoustics. 60,000 SF of space is dedicated to café area which includes of a coffee bar, sushi bar, diner, south Indian bar, east Indian bar, Italian station and other multiple stations; there is also a coworking bar that provides a specialty beverage station for employees to gather. The 18th executive floor features secure spaces for executives’ safety and a customer experience center with food service, dining and special AV graphics display areas; there is also custom lighting and artwork integrated in this space. All office floors have one breakroom with wood cladded interconnecting stairs and multiple appliances to service the entire floor. Each office floor also consists of specialty spaces for employee interaction game rooms, selfie rooms, meditation, and other functions. All conference rooms feature extensive audio visual capabilities throughout. The first level includes a main lobby, Adobe experience center (museum), juice bar and a full production kitchen. A custom DXD display in the main lobby of Level 7 & Level 8, as well as the executive center on the 18th floor, provides tailored graphics. The project will receive a LEED GOLD rating. Services Provided: Architect of Record: Client: News: Construction Gensler Adobe Systems Inc. None https://www.cpexecutive.com/post/adobe-breaks-ground-on-its-north-tower-in-san-jose/#:~:text=The%20North%20Tower%20development%20will,opportunity%20zone%20at%20333%20W. https://www.bizjournals.com/sanjose/news/2020/09/15/structures-architecture-gensler.html Completed 2022 Corporate Tenant Improvement LEED Gold BACK TO PROJECTS

  • Stanford Redwood City

    Stanford Redwood City Redwood City, CA This project consists of an expansion to Stanford University’s main campus. The project features demotion to five existing buildings and new construction of nine independent structures. Primary space is comprised of four office buildings totaling 585,000 SF. The office buildings entail warm shell/core steel construction of one 6-story, two 5-story, and one 3-story building. Each office building includes completed cores and lobbies with one building featuring a kitchen, dining area, and conference center. The project also features four independent amenities buildings designed to support the 1.5 million square footage of eventual campus buildout; the amenities consist of approximately 56,000 SF of full shell/tenant improvements including a fitness center with pool, full gym and basketball court, a childcare facility, a communication center and a central utility plant which includes a one million gallon chilled water thermal energy storage tank. The project also consists of one 7-story parking garage with one story below grade; the custom skin, concrete garage is approximately 350,000 SF and houses 1,000 vehicles. Sitework features 18 acres of complete renovation with landscaping, furnishings, pathways, greenways, plazas, two new private streets, city sidewalks, new utility feeds, undergrounding of all adjacent overhead utilities, and recycled water extension to the site from city recycled water facility; sitework also covers three neighborhood intersection renovations. B1 Tenant Improvement: 109,560 SF tenant improvement project for Stanford University. This project spans over three floors consisting of high-end office space, kitchenettes, huddle spaces, conference rooms and computer labs. The first level includes audio rooms with strict acoustical requirements, a conservation vault, and a laboratory space including a fume hood and two snorkels. Scope also includes design/build MEP/FS with the inclusion of 3D BIM coordination and Navisworks conflict resolution. B2 Tenant Improvement: 162,769 SF tenant improvement project for Stanford University. This project spans over five floors consisting of high-end office space, kitchenettes, huddle spaces, conference rooms, computer labs and an auditorium to seat approximately 80 guests. Project features the addition of intermediate stair and opening between the 3rd and 4th floors of the building. Scope also includes design/build MEP/FS with the inclusion of 3D BIM coordination and Navisworks conflict resolution. B3 Tenant Improvement: 169,098 SF tenant improvement project for Stanford University. This project spans over five floors consisting of high-end office space, kitchenettes, huddle spaces, conference rooms, computer labs, and a recording studio. Project features extensive custom millwork, curved walls, and structurally freestanding partial height rooms. Scope also includes design/build MEP/FS with the inclusion of 3D BIM coordination and Navisworks conflict resolution. B4 Tenant Improvement: 129,059 SF tenant improvement project for Stanford University. This project spans over six floors consisting of high-end office space, kitchenettes, huddle spaces, conference rooms and computer labs. Scope also includes design/build MEP/FS with the inclusion of 3D BIM coordination and Navisworks conflict resolution. Mandatory high-rise requirements as set forth by Redwood City, dictates both design and construction of the space and required strict pressurization control of egress paths. Services Provided: Architect of Record: Client: News: Construction ZGF Architects Stanford Real Estate None https://archello.com/project/stanford-redwood-city https://www.metropolismag.com/architecture/educational-architecture/stanford-redwood-city-clive-wilkinson/ https://www.archpaper.com/2017/04/stanford-university-redwood-city-campus/ Completed 2019 Corporate Tenant Improvement BACK TO PROJECTS

  • SK Hynix HQ

    SK Hynix HQ San Jose, CA Design/build project consisting of a 2-story renovation to the existing SK Hynix office and VIP space. The 90,000 SF project features high-end finishes with custom millwork throughout the two-story lobby, CEO, CMO and Executive suites and conference rooms, open office areas with baffle ceilings, as well as a full-service kitchen and cafeteria space to serve the 300+ employees onsite. This project includes a fast-paced construction schedule to accommodate move in within six months. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. SK Hynix None Completed 2024 Tenant Improvement Corporate Design-Build BACK TO PROJECTS

  • Prologis Sage Point 8

    Prologis Sage Point 8 Reno, NV Mass grading and site improvements on 12.5 acres with construction of a 259,740 SF, 32’ clear height, shell concrete tilt-up building, with a fire pump house including two diesel fired generators. Project includes tenant improvements for Continental Tire, for tire storage to 30’ throughout a fully racked and lighted warehouse, 4,000 SF of office improvements, (26) dock positions with electrically operated dock equipment, either forklift battery charging stations, and a fully fenced site with automatic gates and a guardhouse. Services Provided: Architect of Record: Client: News: Construction Tectonics Design Group Prologis None Completed 2021 Tenant Imrovement Sustainable BACK TO PROJECTS

bottom of page